Infrastructure Engineer
CurrentOne-Line summary by the year : Year 2020 (ongoing) : Focus on constructing a Public Cloud infrastructure with Azure that is fully compliant with on-premise infrastructure. Defining standards and processes to help on-board new application groups, to leverage Azure.Year 2019: Heavy emphasis on delivering Infrastructure as code. Delivered a product that automates end to end process of delivering a NAS Volume, in a complex EMC Isilon setup.Year 2018: Re-designed SAN connectivity to overcome limitations within the ESX hypervisor with zero downtime. Implemented salesforce-based document relay portal to access sensitive patient information.Year 2017: Invested major efforts into building two new datacenters and consolidating four existing datacenters. Adopted VCE vBlock Hyperconverged solution for Block storage and EMC Isilon for NAS Storage.Year 2016: Resolved hardware performance issues by identifying bottlenecks and resolving them with making improvements to the SAN connectivity layout. The contention issues never re-surfaced post re-design.Year 2015: Conducted Infrastructure stress tests, by inducing pain points – to check and rectify any high availability loopholes. This ensured that application RTO and RPO are met in the event of a true disaster.Year 2013-2014: Deployed an “Always-Available” SAN solution employing VPLEX Cross-connect Metro as a part of major datacenter consolidation efforts. Also retired IBM XIV SAN and IBM N-Series NAS storage frames.