Santosh Kumar Singh Email and Phone Number
| Versatile Project Management Professional | Aviation Fuel Farm I Tank farm depot I Refinery I Oil/Gas I Power Plant I With over 13.6 years of hands-on experience as a Project Manager and Construction Manager bring a diverse skill set and proven track record of success in delivering complex projects across the Aviation Fuel Farm, Fuel hydrant system, Refinery, Power Plant, and Oil/Gas sectors. Throughout my career, I have consistently demonstrated a commitment to excellence, innovation, and client satisfaction.πΉ Aviation Fuel Farm/Fuel hydrant system Excellence: In the aviation industry, I have led initiatives related to the development and maintenance of aviation fuel farms, fueling systems, and infrastructure. Leveraging my specialized knowledge of aviation fueling operations and safety standards, I have implemented innovative solutions to enhance operational efficiency, mitigate risks, and ensure compliance with industry regulations, contributing to the seamless operation of airport facilities.πΉ Refinery Operations and Maintenance- Oil and Gas treatment facilities Crude Oil, Natural gas (ethane, propane, butane), solid Sulfur loading facilities (SPM) and products storage tanks. The plant consists of 3 trains for natural gas, 3 trains for sulfur recovery unit, 2 trains for NGL fractionation and 2 trains for condensate with a total capacity of 695 MMSCF/day of Natural gas, 600,000 barrel/day of Crude Oil and 450 metric tons of solid sulfur.I have managed complex initiatives spanning upstream, midstream, and downstream activities. From refinery expansions to pipeline construction and petrochemical plant projects, πΉ Power Plant Proficiency: Within the power generation sector, I have played instrumental roles in the planning, design, and construction of various power plant facilities, ranging from conventional thermal plants to renewable energy installations. My hands-on experience in managing project timelines, budgets, and resources, coupled with my technical expertise in power generation technologies, has enabled me to deliver projects of the highest quality and reliability.πΉ Commitment to Continuous Improvement: Driven by a passion for learning and professional growth, I remain abreast of the latest industry trends, technologies, and best practices in project management. By fostering a culture of innovation, collaboration and continuous improvement, I strive to deliver value-driven solutions that exceed client expectations and contribute to the long-term success of organizations.
Saga Global Consultants
View- Website:
- sagaconsultants.com
- Employees:
- 33
-
Project ManagerSaga Global Consultants Nov 2023 - PresentChaudhari Charan Singh International Airport LucknowTo Co-ordinate with client, monitor project, maintaining mechanical/civil/electrical construction quality, review and control drawings transmittal, capital expenditure projects and ensure completion within budget, time and cost thereby meeting the targeted deliverables.ο Total construction of ATF storage tanks in this project are 09 Tanks. ο Construction of Aviation turbine fuel tank with floating suction (size: 12.00M dia X 12.00M height)- 04 Noβs.ο Construction of underground tank with floating suction (size: 2.750M dia X 7.500M Length)- 03 Noβs.ο Construction of conical roof vertical water tank- (size 12.00M dia X 12.00M height)- 02 Noβs.ο Construction and commission of Product pump house, decanting pump house and fire pump house with equipment. ο Construction and commission of Admin building, PMCC building, Workshop building, Driver rest building, shiftchange building, TLF gantry, Fuel pump house, Loading/Unloading pump house, Fire pump house, Security office building, OWS, Drains and culverts and approach roads.ο Construction erection and commissioning of FHS (Fuel Hydrant System), ATF fuel farm, HRS (Hydrant Refueling system) Piping fabrication/erection/hydro test/connection with tank, pump, compressor, fire engineand jockey.ο To coordinate and manage all the interface issues among the EPC Contractor(s) for HRS, FF, ISBL and OSBL.ο Construction of an Aviation Fuel Farm and Fuel hydrant system for Chaudhary Charan Singh International Airport, Lucknow (CCSIA).ο Expertise in Construction and commissioning of ATF storage Tanks, HFS (Fuel Farm System), HRS (Hydrant Refueling System), Fuel hydrant system and Fire Hydrant system. -
Maintenance And Operation Lead EngineerBonatti Jan 2021 - Nov 2023Tripoli, LibyaDuties and Responsibilities: Refinery operation and Maintenance of Oil and Gas treatment facilities- crude Oil, Natural gas (ethane, propane, butane), solid Sulfur loading facilities (SPM) and products storage tanks.ο The plant consists of 3 trains for gas, 3 trains for sulfur recovery unit, 2 trains for NGL fractionation and 2 trains for condensate with a total capacity of 695 MMSCF/day of Natural gas, 600,000 barrel/day of Crude Oil and 450 metric tons of solid sulfur.ο Manage the planning, execution, and maintenance of process piping, pipelines, fire water systems, and equipment.ο Responsible for scheduling routine maintenance, coordinating repairs, and leading a team of maintenance technicians.ο Perform predictive, preventive, corrective, breakdown, and emergency maintenance, including corrosion mitigation and valve maintenance.ο Perform piping hydro testing, leak testing, cleaning/flushing, and use hydro-jetters, pigging devices; document maintenance activities and ensure compliance with regulations.ο Coordinate with other departments to ensure seamless maintenance operations, troubleshoot issues, and provide training and development for team members.ο Prepare and estimate requirements before job commencement to avoid delays, including job preparation, permit acquisition, lock-out/tag-out procedures, material availability, and scaffolding/insulation removal.ο Proficient in using CMMS to manage work requests, equipment maintenance scheduling, installations, services, inventory, purchasing, and work planning. -
Resident Construction ManagerPragati Engineering Management Services Feb 2019 - Apr 2022Rajasthan, IndiaDuties and Responsibilities: To Plan, Co-ordinate, implement, monitor, review and control all capital expenditure projects and ensure completion within budget, time and cost thereby meeting the targeted deliverables.ο Total construction of storage tanks in this project are 17 Tanks. ο Piping fabrication/erection/hydro test/connection with tank, pump, compressor, fire engine/commissioning. ο Responsible for the entire Petrolium depot construction works and coordinates all activities related for the entire process.ο Resposible for seeing that all jobs are completed on time, on budget and with a high level of quality.ο To plan, organize, coordinate, supervise, and control mechanical maintenance activities an O & M site.ο Responsible for project management and execution, planning, monitoring and controlling the changesο To read and understand isometric drawing, P & ID, GAD, PFD, Layout and other Engineering drawings.ο Mark up PID boundary for hydro test and leak test and responsible for line walk down.ο Responsible for the examination of systems to ensure completeness, punch lists preparation, and readinessfor hydro tests activities.ο Construction of Above ground Conical roof verticak tank for HSD (Deseil)/fixed roof vertical tank for fire water/floating roof vertical tank for MS (Petrol) and under ground tank for Ethanol/MS/HSD.ο Installation of static/rotary equipment such as fire engine, jockey pump, water makeup pump, centrifugal pump, motor, Generator, Mechanical seal, Pressure transmitter valve, Control Valve, HVLR, MEFG, Non-return valve, Gate valve, sprinkler system, Firewater pipeline, Oil pipeline ο Handling piping fabrication fit-up, erection, As Build Drawing work and line walk down. ο To professionally report project progress and current status to internal and external stakeholder. -
Construction ManagerEnka Δ°nΕaat Ve Sanayi A.Ε. Engineering For A Better Future Feb 2019 - Jan 2021Istanbul, TurkeyDuties and Responsibilities: Piping fabrication & installation, Mark up PID boundary for hydro test and leak test, nitrogen purging and responsible for the Mechanical Completion walk down and pressure test works.ο Total construction of storage tanks in this project are 12 Tanks. ο Construction of fixed roof vertical tank (size: 30M dia X 15.08M height)- 04 Noβs.ο Construction of floating roof vertical tank (size: 25M dia X 8.830M height) )- 03 Noβs.ο Construction of under ground tank (size: 3.5M dia X 15M Length)- 03 Noβs.ο Construction of conical roof vertical water tank- (size 26M dia X 12M height)- 02 Noβs.ο Responsible for all pipeline installations at Site/Construction & quality of pipeline activities at the site.ο Monitors the pressure testing (hydrostatic and pneumatic) and handle reports on the completion of tests and to supervise line gauging, drying, flushing, air blowing after hydro test and reinstatement.ο Promote safety and safe work practices in the workplace with all working people at the site.ο Read and understand construction pipeline drawings, specifications and other technical information.Identifies various materials to ensure correct installationο Ensure Pipeline test packs were reviewed and approved for Hydrotesting as per the procedure.ο To read and understand isometric drawing, P & ID, GAD, PFD, Layout and other Engineering drawings.ο Review PID boundary for hydro test and leak test and responsible for line walk down and pressure test works.ο Responsible for the examination of systems to ensure completeness, punch lists preparation, and readiness for hydro tests activities.ο Mechanical completion (MC) walk down and checking line with the client. ο Provide Static equipment and piping expertise to the Project from Detailed Engineering, Procurement, Installation & Commissioning phases. -
Construction ManagerEnka Δ°nΕaat Ve Sanayi A.Ε. Engineering For A Better Future Nov 2017 - Feb 2019Istanbul, TurkeyDuties and Responsibilities: To Plan, Co-ordinate, implement, monitor, review and control all capital expenditure projects and ensure completion within budget, time and cost thereby meeting the targeted deliverables.ο Preparation of test package, planning, line walk down and execution of preparatory activities.ο Independent Project handling of Erection and Installation of Heavy fabrication Structural and equipment (static & rotary) in Power / Steel / Oil and Refinery.ο Mechanical completion (MC) walk down and checking line with the client. ο To complete the site punch point to satisfy the project requirement.ο To read and understand P & ID (Piping and Instrumentation Diagram), GAD (General Arrangement Drawings), PFD (Process Flow Diagram), Layout and other Engineering drawings.ο Monitoring installation and testing of metallic pipeline, valves and other piping items and review hydro test package, carry out inspection of lines before testing.ο To monitor the HDPE piping fabrication, installation and Hydro test activity.ο To monitor the Victaulic piping fabrication, installation and Hydro test activity.ο To monitor fire fighting piping, hydrant, cabinets, hose pipe connection work and fire engine installation.ο Installation and connection for flare stack, separator, crude product cooler, crude transfer pump skid, desalter, dehydrator, hot oil heater, air receiver, hot oil filter, serge vessel, flare, flare KO drum, pipe rack & skid connection.ο Provide appropriate solutions for all parties and evaluate and analyze all client requirements and design all piping specifications for clients and recommend appropriate alternatives.ο To monitor the installation of pipes to ensure the work agrees with the project's design and inspect work progress to identify challenges, mitigate risks and guarantee the safety of piping staff.ο To make construction plans and schedule for the piping works, assists with material procurement oversees installations and supervision activities. -
Installation & Construction ManagerAts Conveyors India Pvt Ltd Mar 2016 - Nov 2017Pune Area, IndiaDuties and Responsibilities: Fabrication, Installation & Commissioning of mechanical/electrical equipmentelectrical monorail system, conveyors, lift and crane.ο Fabrication and erection of structural steel, sheet metal, piping work, equipment installation, blasting, painting, and commissioning. ο To Plan, the commissioning tasks ensuring all commissioning requirements and activities are captured in the Completions System.ο Coordinating planning and execution of all commissioning activities facilitating safely achieving acceptance within the assigned budget and under the project master scheduleο Ensure the Commissioning scope pre-commissioning checks and documentation are carried out, meeting Manufacturer, Class and client requirements.ο Ensure all applicable procedures are followed Coordinating to the compilation of the final Commissioning Dossier.ο Coordinates commissioning punch list clearance activities with project team groups.ο Develops plans and procedures for transitions from Construction (Area Based) Mechanical Completion (System/ Sub-system based) to System Completion.ο Identifies & communicates priority systems/ sub-systems to drive Mechanical Completion. Liaises with Production and System Completions ensuring maintaining systems prioritization.ο To undertake Site Installation, Commissioning, Training, Handover and Start-up activities on a project by project basis. -
Construction ManagerEssar Projects Jun 2014 - Mar 2016Maharashtra, IndiaDuties and Responsibilities: API 650/653 Fixed Roof Tank/Floating Roof Tank fabrication/erection and old tank Maintenance, cleaning, degassing procedure, dismantling and static/rotary equipment installation.ο Total construction of storage tanks in this project are 10 Tanks. ο Construction of fixed roof vertical tank (size: 12M dia X 9.47M height)- 03 Noβs. ο Construction of floating roof vertical tank (size: 14M dia X 20M height)- 03 Noβs. ο Construction of under ground tank (size: 3.5M dia X 15M height) )- 02 Noβs. ο Construction of conical roof vertical water tank- (size 26M dia X 12M height)- 02 Noβs.ο Responsible for the entire Petrolium depot construction works and coordinates all activities related for the entire process. ο Resposible for seeing that all jobs are completed on time, on budget and with a high level of quality.ο Installation of static/rotary equipment such as fire engine, jockey pump, water makeup pump, centrifugal pump, motor, Generator, Mechanical seal, Pressure transmitter valve, Control Valve, HVLR, MEFG, Non-return valve, Gate valve, sprinkler system, Firewater pipeline, Oil pipeline, ο Fabrication, erection, lifting procedure with jacking arrangement & commissioning of the new tank (fixed roof & floating roof), management, supervision, incoming material and analysis for site activities, co-ordinate with clients, consultants and contractors and strong leadership skills to manage the site on all aspects.ο Handling piping fabrication fit-up, erection work and line walk down for mechanical completion. ο Preparation of hydro test packages and handling hydro test for piping and tanks.ο To professionally report project progress and current status to internal and external stakeholder.ο Independent Project handling of Erection and Installation of Heavy fabrication Structural and equipment (static & rotary) in Power / Steel / Oil and Refinery. -
Project EngineerSepco Iii Electricity Power Const. Corp. Jun 2013 - Jun 2014Saudi ArabiaDuties and Responsibilities: Installation & commissioning of Static/Rotary Equipment- HRSG, Gas Turbine/Steam Turbine, Generator, compressor, main stage, bypass stage, diffuser with collar and pump. ο Total construction of storage tanks in this project.ο Installation & commissioning of Static/Rotary Equipment such as- HRSG, Gas Turbine/Steam Turbine with support foundation, Generator with support foundation & fixator; compressor with support foundation & fixator; main stage, bypass stage, diffuser with collar, water injection pump, fuel oil pump skid, control oil skid, dehumidifier, high load purge panel, fuel gas filter separator, instrument air compressor, startup/shutdown purge air compressor, high load transfer purge compressor & receiver tank, lube oil package, compressor wash skid, pipe rack, turning gear.ο Piping fabrication/erection/hydro test/connection with tank, pump, compressor, fire engine/commissioning.ο Create and maintain company installation documentation, such as equipment installation manuals, Installation procedures, levelling, alignment, flange management and torquing etc.ο Responsible for Structural Steel Fabrication & Erection Work, Equipment Installation, Layout Preparation, Site Work Coordination.ο Attending daily meeting conducted by client and coordinating for achieving the progress.ο Installation of tanks, fire engine, pump for petrol/diesel, hydrocarbon equipment, sprinkler system, Firewater pipeline, Oil pipeline, pressure gauge and hydro test of Tanks & pipeline.ο To preparation of site document like (RFI, FQP, SON, BOQ, Discrepancy Report, Maintain Log Reports, CA/PA Report, Calibration Report, NDE & ISO Audit documents etc.ο Piping, fabrication, static/rotary equipment installation & commissioning storage tank and maintain quality as per required drawing specification and standard.ο To undertake Site Installation, Commissioning, Training, Handover and Start-up activities on a project by project basis.
-
Project EngineerTiger Steel Engineering L.L.C. May 2011 - Apr 2013IndiaProject: AJEEZ STEEL PRODUCT SAUDI ARABIA Designation: PROJECT ENGINEER Client: TIGER STEEL ENGINEERING SARJAHA DUBAI.ο Supervision, monitoring and execution of the structural and piping fabrication, installation & mechanical commissioning activity. ο Handling a team of installation on-site, interact with contractors, project management teams.ο Preparation of Project schedules in line with the contract agreement.ο Coordination for all the site activities and providing technical specifications, construction related essentials documents and drawings etc.
Santosh Kumar Singh Education Details
-
Uttar Pradesh Technical University, LucknowFirst Class 65%
Frequently Asked Questions about Santosh Kumar Singh
What company does Santosh Kumar Singh work for?
Santosh Kumar Singh works for Saga Global Consultants
What is Santosh Kumar Singh's role at the current company?
Santosh Kumar Singh's current role is | PMP Certified | Project Manager | Project and Operation & Maintenance | Aviation Fuel Farm | Fuel Hydrant Refueling system | Refinery | Tank Farm Depot | Petrochemical | Power Plant | Oil & Gas Projects |.
What schools did Santosh Kumar Singh attend?
Santosh Kumar Singh attended Uttar Pradesh Technical University, Lucknow.
Who are Santosh Kumar Singh's colleagues?
Santosh Kumar Singh's colleagues are Sandeep Shelke, Dipti Shah, Pankaj Singh, Rajkumar Singh, Srikanth Vemula, Rohit Rajput, Sonali Pradhan.
Not the Santosh Kumar Singh you were looking for?
-
Santosh Kumar Singh
Professor In Electrical Engineering At Indian Institute Of Technology (Bhu), Varanasi, IndiaVaranasi -
Santosh Kumar Singh
Gurgaon -
-
Santosh Kumar Singh
E-Commerce Marketplace | B2B | B2C| Product Manager | Strategy & Planning | Digital AdvisorBengaluru
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records Γ $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial