Satish Kumar

Satish Kumar Email and Phone Number

Assistant Manager at L&T Hydrocarbon Engineering Limited @
Satish Kumar's Location
Masqaţ, Oman, Oman
Satish Kumar's Contact Details

Satish Kumar personal email

About Satish Kumar

Hydrostatic testing & commissioning of oil & gas cross country pipeline, Refinery and plant piping

Satish Kumar's Current Company Details
L&T Energy Hydrocarbon

L&T Energy Hydrocarbon

Assistant Manager at L&T Hydrocarbon Engineering Limited
Satish Kumar Work Experience Details
  • L&T Energy Hydrocarbon
    Assistant Manager
    L&T Energy Hydrocarbon Jul 2020 - Present
    Muscat, Oman
    Project : MABROUK NORTH EAST DEVELOPMENT PROJECT (OMAN)Client: PETROLEUM DEVELOPMENT OMAN (PDO)EPC contractor: L&T HYDROCARBON ENGINEERING, OMANProject Description: - Mabrouk North East is a major Gas-Condensate discovery in Company concession area, which straddles the boundary between Block 61 and Block 6. The field is located approximately 6 km northeast of Mabrouk field and 35 km west of Saih Rawl field. The field was discovered in late 2016. Realizing the potential of the field, additional wells development program continued with full field development. . This field offers the opportunity to increase gas and condensate supply to cover the country’s demand of gas during the supply/demand cross over anticipated in 2026.The full field development of Mabrouk North East field is planned to be executed in phased approach. The first phase Mabrouk North East Development Project wells drilling is in progress and will continue in parallel with project construction. The production facilities that will be built under Mabrouk North East Development Project are clustered into off-plot and on-plot facility based upon the fenced location, exceptionally the wells comprising gas producing wells hook up, pipelines, production manifolds, well test facility and tie ins with existing gas processing facility.
  • Punj Lloyd Limited
    Deputy Manager
    Punj Lloyd Limited Nov 2017 - Jun 2020
    Suhar, Oman
    Project : LPIC-EPC4: 14” NGL Pipeline and OGC 32” Gas Loop Line (OMAN)Client: Oman Gas Company (OGC) & ORPIC Plastic LLC (ORPIC)EPC contractor: Punj Lloyd Ltd.Project description: The Liwa Plastics Industries Complex (LPIC) petrochemical complex in Sohar (by others) will be integrated with the Sohar Refinery. One of the major feedstocks to the SCU is the main product of the NGL Extraction Plant; the C2+ components extracted from the natural gas at Fahud, and transported to the LPIC Sohar facilities (SCU) by a new pipeline. The 14”x 300Km (approx.) NGL Pipeline shall be provided with Pig Launcher at Fahud NGLE Plant and a Pig Receiver including Custody Metering Transfer System located within the Sohar Petrochemical Complex plot (SCU) at Sohar Industrial area. Between Pig Launcher and Receiver; eleven block valve stations (BVS-1 to 10) & One intermediate pigging station. BVS-05 shall be installed inside the intermediate pigging station.Oman Gas Company S.A.O.C. (OGC) already operates an existing 32” gas pipeline runningfrom Fahud to Sohar. But due to expansion of SRIP (Sohar Refinery Improvement Project) &also OPWP (Oman Power and Water Procurement Company S.A.O.C.) is planning to build new IPP’s (Integrated Power Plants) in IBRI & SOHAR respectively. The gas demand has increased rapidly. Therefore to ensure the availability of supply, it is required to install a loop (parallel) pipeline to the existing 32” Fahud – Sohar pipeline all the way through the approximately 301 km length, Fahud FCS to receiver (at Sohar GSS) to satisfy the total demand of 53.4 MMSCMDThe proposed Gas Loopline shall start from Fahud Compressor Station (FAHUD BVS-2) toSohar GSS buried approx. 32” dia x 301 Km length having ten Block Valve Stations (BVS-1 to 10) inentire route
  • Al Asab General Transport & Contracting Company
    Pre-Commissioning Engineer
    Al Asab General Transport & Contracting Company Sep 2016 - Oct 2017
    Abu Dhabi, United Arab Emirates
    Project : EPC for OGD-1 Trunk lines Replacements and HABSHAN DIRECT DEPRESSURIZATION Project (HDD-1) (OD – 10” , 12” and 16” )Client: Abu Dhabi Company for Onshore Petroleum Operations Ltd. (ADCO)This project consists of three (3) packages namely OGD-I Trunklines Replacement, Habshan Direct Depressurization (HDD) and installation of Fibre Optic Cables.
  • Control Plus Oil And Gas Solutions Private Limited
    Hydrotest & Commissioning Inspector
    Control Plus Oil And Gas Solutions Private Limited Mar 2016 - Sep 2016
    Rewari Area, India
    Project details: MDPL, Rewari is receiving product from both direction, viz MDPL and RBPL. In view of this bi directional PIG traps were procured to replace the universal PIG barrel at MDPL Rewari . This LPR is initiated to float a tender to finalize “CONTROL PLUS Oil & Gas Solution Pvt. Ltd.” For composite work to decommissioning the existing unidirectional PIG traps and Installation, hydrostatic testing and commissioning of the new bi directional PIG traps.
  • Punj Lloyd Limited
    Deputy Manager
    Punj Lloyd Limited Jul 2015 - Nov 2015
    Dubai
    Hydrostatic testing of oil & gas cross country pipeline, Refinery and plant piping
  • Punj Lloyd Limited
    Sr Engineer
    Punj Lloyd Limited Jul 2012 - Jun 2015
    Dubai, United Arab Emirate
    Hydrostatic testing of oil & gas cross country pipeline, Refinery and plant piping
  • Kazstroy Service Infrastructure India Pvt. Ltd.
    Engineer
    Kazstroy Service Infrastructure India Pvt. Ltd. Sep 2007 - Jul 2012

Satish Kumar Skills

Pipelines Refinery Piping Epc Petrochemical Welding Petroleum Oil/gas Asme Ndt Gas Pressure Vessels Procurement Commissioning Feed Factory Engineering Refineries Project Engineering Hydrostatic Testing Test Planning Construction Inspection Oil And Gas Asme Standards Refinery Operations Oil And Gas Pipeline Commissioning Hydrostatic And Pneumatic Testing Of Plant Piping

Satish Kumar Education Details

Frequently Asked Questions about Satish Kumar

What company does Satish Kumar work for?

Satish Kumar works for L&t Energy Hydrocarbon

What is Satish Kumar's role at the current company?

Satish Kumar's current role is Assistant Manager at L&T Hydrocarbon Engineering Limited.

What is Satish Kumar's email address?

Satish Kumar's email address is sa****@****ail.com

What schools did Satish Kumar attend?

Satish Kumar attended Emperial Institute Of Management Science & Research, Delhi, G.b. Pant Govt. Engineering College, D.c. Arya Sr Sec School, Lodhy Colony. New Delhi.

What skills is Satish Kumar known for?

Satish Kumar has skills like Pipelines, Refinery, Piping, Epc, Petrochemical, Welding, Petroleum, Oil/gas, Asme, Ndt, Gas, Pressure Vessels.

Not the Satish Kumar you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.