At Present I working in Samsung C & T (Worli Mixed Use Project at Worli (Mumbai – India), since16th January 2012 till now as a Senior Document Controller. This is High Rise Building Project TwoTower A & B – Tower A is Office and Hotel 66 Floors , Tower B is Residential 88 FloorsProject : Worli Mixed Use ProjectClient : Oasis RealtyConsultant : Architect: KPF, Structure: Lera Construction Period : 28.08.11 ~ 26.01.16 (53 months) Site Area : 12,165㎡(3,680 PY) I have worked with Lahoud Engineering Co. on the Project (BOROUGE 2) Polyolefins Units, Product Handling and Marine Works, at Ruwais Abu Dhabi (U.A.E) as a Document Controller since 23 October 2009 to 11 May 2010, Client : Borouge, Main Contractor:Tecimount.I have worked with Lahoud Engineering Co. on the Project Onshore Gas Development Phase III (OGD 3) at Habshan Abu Dhabi (U.A.E) as a Document Controller since 10th November 2006 to22 October 2009, Client: GASCO, Main Contractor: Eastern Bechtel Co. Ltd. I have worked with Lahoud Engineering Co. on the project Desalination Plant at Ras Laffan Doha- Qatar as a Document Controller since 20th November 2005 to 10th October 2006 ,Client : QP (Qatar Petroleum), Main Contractor :Technip. I worked with Lahoud Engineering Co. on the project Power and Desalination Station “L” Phase1.at Jabel Ali Dubai (UAE) as a Document Controller since 29th July 2004 to 8th September 2005,Client : DEWA (Dubai Electricity & Water Authority , Main Contractor : Fisia Italimpianti. I worked with Dotanah Engineering & Contracting Sdn. Bhd. on the project Liquefied Natural Gas (LNG) MLNG Tiga Plant at Bintulu - Malaysia as a Document Controller since 10-11-2000 to 30-04-2003, Client : Petronas, Main Contractor: Foster Wheeler.
Listed skills include Engineering and Construction.