Sayed Farag Email and Phone Number
Sayed Farag work email
- Valid
Sayed Farag personal email
Sayed Farag is a General Manager at United for thermal insulation technology company at Olympic Group.
-
Maintenance ManagarOlympic Group -
General ManagerUnited For Thermal Insulation Technology Sep 2021 - PresentEgypt• We have a new innovative, light weight composition used as a thermal insulation for buildings• This composition has three types, one for roof insulation, the second as concrete blocks and the third for blasting the walls.• This composition is reducing the thermal conductivity with 0.076 W/m.⁰c which reduces the electric energy usage with approx. 60 : 80%• It also used as a sound resistor, every 15cm thickness reduces the sound transmission 45db.• It’s used as a fire resistor… Show more • We have a new innovative, light weight composition used as a thermal insulation for buildings• This composition has three types, one for roof insulation, the second as concrete blocks and the third for blasting the walls.• This composition is reducing the thermal conductivity with 0.076 W/m.⁰c which reduces the electric energy usage with approx. 60 : 80%• It also used as a sound resistor, every 15cm thickness reduces the sound transmission 45db.• It’s used as a fire resistor, every 5cm thickness withstands and resist fire@1000⁰C for 90 minutes.• We have achieved the roof insulation for the officers dining hall in the new administrative capital. • We have achieved the roof insulation for the PX mall in the new administrative capital. Show less
-
General ManagerTechnical Office For Special Work And General Contractor Company Jun 2015 - PresentEgyptFrom Jun, 2015 – to August. 2018 - (Technical office for special work and general contractor company). General Manager.Our project we implement now :• Transfer 1 big St. St. tanks ( 1000 M3 - 9 m diameter X 20 m L ) from Alexandria to Sadat city Unibord company .• Install overhead crane 10 Ton in Unibord Company.• Extend three metal conveyor ( stock area ) Unibord company • Supplied and installed fire doors in all Unibord factory.• Supplied and installed… Show more From Jun, 2015 – to August. 2018 - (Technical office for special work and general contractor company). General Manager.Our project we implement now :• Transfer 1 big St. St. tanks ( 1000 M3 - 9 m diameter X 20 m L ) from Alexandria to Sadat city Unibord company .• Install overhead crane 10 Ton in Unibord Company.• Extend three metal conveyor ( stock area ) Unibord company • Supplied and installed fire doors in all Unibord factory.• Supplied and installed windows in all Unibord factory.• Supplied and installed steel strictures in building Unibord factory.• Manufacturing and install two st.st 316 L tanks everyone is 100 M3. • Install new factory to recycle rubber tires (our responsibility install and operate the factory). • Manufacturing concrete base for steel tank 500 M3 in Dabur Company. • Manufacturing and install new factory for new type of bricks (thermal, water resistance, sound resistance, fire resistance, no crack no shrank and lightweights.• Our company first applicator in Egypt for Tekto Egypt Show less
-
Local Manufacturing Engineering Manager In Water Heater FactoryElectrolux Mar 2011 - PresentEgyptI’m deputy for the plant manager and production operation manager many and long time. •Managing all EMS activity in factory •Managing all Safety activity in factory related to Maintenance.•Managing all Lean and process activity in factory .•Managing and implement new stone project .•Managing and lead problem solving activity as electro static painting , Enameled furnace, coating department,….and welding line improvement .•Managing and lead CIP activity as Gas water… Show more I’m deputy for the plant manager and production operation manager many and long time. •Managing all EMS activity in factory •Managing all Safety activity in factory related to Maintenance.•Managing all Lean and process activity in factory .•Managing and implement new stone project .•Managing and lead problem solving activity as electro static painting , Enameled furnace, coating department,….and welding line improvement .•Managing and lead CIP activity as Gas water heater and enameled line . •Managing all maintenance activities in factory as (Mechanical, Electrical & diesel forklift workshop) in gas & electric water heater & warehouses to ensure high over all equipment effectiveness•Managing all preventive and predictive maintenance.•Managing maintenance KPIs with my team . •Make budget for all machine, energy and spear parts based on the expecting production volume .•Managing and control all expenses.. Add to my responsibility green spirit activities and new projects to save water and energy as :•Incite and implement Log out tag out system in all machine in factory .•Change all metal halide lamb and scouts 400 watt to LED 70 watt lighting at the same lux.•Reduce air leak ratio below 10 % that is target for all Global Electrolux company . •Make and Implement Switch off program .•Make energy map for all factory equipment and increase OEE for machine that is high energy consumption Achievements:•Certified as trainer from Electrolux company . •Best Factory Team Work Award to achieve 2014 target that certificate in May 2015 from Electrolux Europe .•Implement Gas water heater assembly line project as leader and project manager that is make increase productivity from 300 unit / shift to 600 unit / shift this project competition income of 19 project at the level of Europe and was selected within three projects for the competition .•Yellow Gear certificate in EMS .•Make saving in energy 25% vs target 8% 2013 Show less
-
Engineering Services ManagerMeg (Middle East Glass) Sep 2018 - Sep 2021Egypt• Managing all managers for maintenance activities in factory as (Mechanical, Electronic, Electricity & diesel forklift workshop) to ensure high overall equipment effectiveness, including all the factory machinery and heavy equipment, compressor stations reliability and availability.• Lead the maintenance team to carry out a comprehensive overhaul of the Rotary Vane Gardner Denver compressor capacity of 740 cubic meters per minute 500 kW/h, all companies operating with compressors have… Show more • Managing all managers for maintenance activities in factory as (Mechanical, Electronic, Electricity & diesel forklift workshop) to ensure high overall equipment effectiveness, including all the factory machinery and heavy equipment, compressor stations reliability and availability.• Lead the maintenance team to carry out a comprehensive overhaul of the Rotary Vane Gardner Denver compressor capacity of 740 cubic meters per minute 500 kW/h, all companies operating with compressors have refused to perform this overhaul, as they do not have sufficient experience in working with this type and capacity, we have succeeded in renovating and operating the external workshops under our full supervision.• Make RFA for all new equipment and participate in the plan for new equipment to determine its capacity in order to save energy, increase production and quality.• Managing all preventive and predictive maintenance.• Managing maintenance KPIs with my team. • Make budget for all machine, energy and spare parts based on the expecting production plan.• Managing and control all expenses (gas, water and electricity / ton consumption ) for example, by making recycles to use water, where the daily use was 1500 cubic meters, it became 300 meters / day as a maximum..• Managing to Increase skills of our technician by formal and on job training. Show less
-
Maintenance ManagerUnilever Egypt Jan 1999 - Feb 20086 OctoberMaintenance Manager in Detergent powder factory - Forklift work shop manager . Maintenance: Managing all maintenance activities in powder & forklift workshop (Electrical & diesel forklift) in all sites & all warehouse to ensure high over all equipment effectiveness, Forklift reliability, and availability. Develop skill matrix and gap analysis of maintenance technicians then is setting up the annual training plan for maintenance personnel. Initiating and implementing… Show more Maintenance Manager in Detergent powder factory - Forklift work shop manager . Maintenance: Managing all maintenance activities in powder & forklift workshop (Electrical & diesel forklift) in all sites & all warehouse to ensure high over all equipment effectiveness, Forklift reliability, and availability. Develop skill matrix and gap analysis of maintenance technicians then is setting up the annual training plan for maintenance personnel. Initiating and implementing Reliability Centered Maintenance program in maintenance dept. as the best practice for developing preventive maintenance schedules and plans. Scrap Area :Managing, dispatch, sell all scrap delivered from factories any (packaging material - raw material - finish good product Wright off -.....). Focus Improvement pillar holder. The pillar holder of FI committee in the powder factory, leading the FI implementation as use the best tools to reduce loss tree in factory. Show less
Frequently Asked Questions about Sayed Farag
What company does Sayed Farag work for?
Sayed Farag works for Olympic Group
What is Sayed Farag's role at the current company?
Sayed Farag's current role is General Manager at United for thermal insulation technology company.
What is Sayed Farag's email address?
Sayed Farag's email address is sa****@****.com.eg
Not the Sayed Farag you were looking for?
-
-
-
-
1hotmail.com
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial