Tooling Control Manager
Current2. 2011.06 ~ Present, Tooling Control Manager. 2.1. Managed planning team to schedule fabrication progress in field thru Dr.Koutei system (ERP),procured the maximum output basis on whole capacity. 2.2. Monitored WH to balance raw material and production supply, to ensure the machining smoothly.2.3. Controlled laser machining & shipment preparation & logistics to ensure delivery rate of 100%.2.4. Managed heat treatment process to make sure the most reasonable raw material has been used by all tooling parts to increase their lifetime.2.5. Manage purchase team to buy everything as the most reasonable to support field fabrication process.2.6. Manage supplier management team to optimize vendors to create more value for GTC when special tooling parts have been subcontracted outside.2.7. Coached many JDI, Lean and six-sigma projects, saved 0.8M usd till now.2.8. Have set up laser machine fabrication system, including laser welding, fabricate micro-font by laser machine instead of EDM process, etc. 2.9. Saved 15k usd when we purchased two sets of laser welding equipment from HAN*S LASER than one set of OR laser welding machine from Germany. 2.10. Supported GTC to complete 2.2M usd(maximum) sales a month.