Scott Ashford Email and Phone Number
Scott Ashford work email
- Valid
Scott Ashford personal email
Now working as a Project Manager for Jay-Reese on projects in TX. My previous experience was site based, leading multi-disciplinary teams across a number of civil construction project. Experienced in completing construction ahead of schedule, utilizing optimal resources and delivering substantial cost savings. Strong focus on all aspects of adherence with Health and Safety policies / legislation and a champion of site safety at all times.
-
Project ManagerJay Reese Contractors Inc Oct 2020 - Present -
SuperintendentPrince Contracting, Llc Feb 2020 - Oct 2020Tampa, Fl, UsISLANDS EXPRESSWAY (CR 787) OVER WILMINGTON RIVERVALUE: $ 67 millionPrince will demolish and replace two existing 1400-foot bascule bridges with two 2300-foot bridges over the Wilmington River, towering approximately 90 feet into the Savannah skyline. The center portion of the bridge will be Continuous Span by utilizing post tensioning that will span 240 feet from pier to pier, allowing larger boats to navigate the 170-foot channel width utilizing the new composite fender system. -
General Foreman (Intergrated Delivery Team)Costain Group Plc Feb 2017 - Oct 2019London, Gb- Working on the the A14 improvement scheme, a £1.5bn pound project, stretching over 25 miles from Cambridge to Huntingdon to improve a highly congested stretch of road.- Managing and supervising all operations at the BNO5 bridge, the largest single structure on the project at 750m which runs through a highly-sensitive environmental area.- Supervising plant / equipment and coordinating the work of contractors / sub-contractors appropriately.- Managing Pilling sub-contractors under bentonite and leading Pile cropping (1.8m diameter).- Coordinating Cofferdam construction (below ground abutment works).- Leading RC sub-contractors on abutments, columns, pre-cast slabs and parapets.- Directing installation of pre-cast slabs and parapets along the BNO5 bridge, supervising Red 7 marine during river closure as well as beam placement sub-contractors.- Executing self-delivery of below deck drainage appropriately.-Moved to pavements section March 2018- supervising curb, slip form and surfacing contractors-Managing all prep work ahead of pavements subcontractors-Delivering side road construction, earthworks for tie-in’s, ERA’s and bridge deck verge concrete - Conducting all works in accordance with all Health and Safety guidelines, rules and regulations -
General Foreman (Bakerloo Line)Costain / Skanska Jan 2016 - Feb 2017- Held position as part of a joint venture team on the Bakerloo Line link project.- Assisted sub-contractor teams to machine dig a 165m-long tunnel link, temporary access tunnel- Directed daily removal of tunnel construction material from the site in line with defined procedures.- Assisted sub-contractor teams in hand digging a lift shaft / access shaft leading to a new cross-passage and escalator barrel.- Undertook work within the station including service diversion and a new switch room construction.
-
Foreman (Hammersmith Flyover)Costain / Tfl Mar 2014 - Jan 2016- Undertook work on the Hammersmith Flyover while maintaining a safe working environment for all contractors.- Led self-delivery of RC anchorage blocks for a new post tensioning system consisting of 3 (x2) RC slabs, 2 diaphragms, corbels and blisters. - Supervised subcontractors during weekend closures to complete waterproofing and resurfacing on the bridge. - Directed installation of RC and expansion joint plates according to specifications.- Managed concrete preparation and repairs across the site, including grouting and resin injection.- Constructed enclosures to ensure minimal disruption to the general public and local businesses.- Held involvement in the installation of temporary and permanent drainage as required.
-
Foreman (Heathrow Framework Lpi)Costain Group Plc Feb 2012 - Mar 2014London, Gb- Held responsibility for multiple landside and airside sites and supervised subcontractor / self-delivery projects.- Terminal 1 Arrivals Forecourt Refurbishment – Led replacement of all cladding and trim, lighting installation, cleaning and painting of the 130m forecourt.- Terminal 1 Pedestrian Crossing Forecourt – Directed replacement and installation of new crossings, tactile paving, beacons / lights and line marking during live airport operations.- Perimeter Roads Refurbishment – Coordinated the resurfacing of major junctions / roads.- VAT Reclaim Area Refurbishment – Managed the replacement and refurbishment of the VAT reclaim desk, surrounding area and roller shutter on the landside / airside boundary.- CIP Lounge Refurbishment – Undertook refurbishment of 2 corridors and 2 lift lobbys.- Toilet Refurbishment – Completed refurbishment of 10 toilets including floors, ceilings, walls and sanitary ware.- Taxiway Surveys – Surveyed pits and mapping services appropriately.- Pit and Duct – Installed ducting from a building to an existing pit airside.- Airside Stands – Directed joint sealing during road diversions. -
Frontline Supervisor / Slinger (Crossrail / Pudding Mill Lane)Costain / Skanska Dec 2010 - Feb 2012• Works included diaphragm wall installation, installation and de-installation of temporary cable bridges, installation and de-installation of diaphragm wall trench jacks and concrete pours.• Installation of ducting for 11kv diversion • Installation of temporary crane slabs.• Supervision and assistance to piling sub-contractor to construct diaphragm walls
-
General Operative (Felixstowe Docks Reconfiguration)Costain / Skanska Jan 2009 - Dec 2010• Main Key Wall- on one of two barges using large cranes and pilling equipment on a day today basis, initially driving the 2.5m wide, 38m long, 47 tonne, clutched tube to tube piles for the 750m long key wall. • Main Key Wall Sides-Tube to sheet piles and dolphin piles • Rear Crane Rail- 38m long x 1.8 m diameter piles installed form a crane and rig• Precast Units- assisted in the Installation on precast units on the main key wall.• Installation of all furniture (bollards, timbers, ladders and fenders) on all sides of the key
-
ApprenticeCarillion 2007 - 2009Wolverhampton, Gb
Frequently Asked Questions about Scott Ashford
What company does Scott Ashford work for?
Scott Ashford works for Jay Reese Contractors Inc
What is Scott Ashford's role at the current company?
Scott Ashford's current role is Project Manager at Jay Reese Contractors Inc.
What is Scott Ashford's email address?
Scott Ashford's email address is sa****@****ing.com
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial