Chief Plant Operator Grade Iii
CurrentIn charge of Rancho Santa Fe Wastewater Treatment Plant, a design flow of .450 MGD Activated Sludge treatment processMaintain all plant operations, controls, equipment, and safetyManage twelve pump stationsSupervise two OperatorsAssist at Whispering Palms and Fairbanks Ranch Wastewater Treatment Plants