AeroLeads people directory · profile

Scott Stringfellow Email & Phone Number

Manager, Contracts at NextDecade
Location: Greater Houston, United States 9 work roles 1 school
1 work email found @ppmsllc.com 1 phone found area 817 LinkedIn matched
✓ Verified Jul 2026 4 data sources Profile completeness 100%

Contact Signals · 1 work email · 1 phone

Work email s****@ppmsllc.com
Direct phone (817) ***-****
LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Manager, Contracts
Location
Greater Houston, United States

Who is Scott Stringfellow? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Scott Stringfellow is listed as Manager, Contracts at NextDecade, based in Greater Houston, United States. AeroLeads shows a work email signal at ppmsllc.com, phone signal with area code 817, and a matched LinkedIn profile for Scott Stringfellow.

Scott Stringfellow previously worked as Engineering Manager at Power Plant Management Services, Llc and Project Manager / Director of Engineering at Coronado Power Ventures, Llc. Scott Stringfellow holds Bachelor Of Science (B.S.), Electrical Engineering from The University Of Tulsa.

Company email context

Email format at NextDecade

This section adds company-level context without repeating Scott Stringfellow's masked contact details.

{first_initial}{last}@ppmsllc.com
86% confidence

AeroLeads found 1 current-domain work email signal for Scott Stringfellow. Compare company email patterns before reaching out.

Profile bio

About Scott Stringfellow

More than thirty years of engineering and management experience in heavy industrial construction that covers the LNG, Petrochemical, and Power Generation industries. Included in that experience is domestic construction throughout the United States and international construction at a world class LNG facility on the northern coast of Africa and a coal fired CHP unit in the Krasnoyarsk Region of Siberia.

Listed skills include Power Generation, Energy, Epc, Project Engineering, and 38 others.

Current workplace

Scott Stringfellow's current company

Company context helps verify the profile and gives searchers a useful next step.

NextDecade
Nextdecade
Manager, Contracts
AeroLeads page
9 roles · 37 years

Scott Stringfellow work experience

A career timeline built from the work history available for this profile.

Manager, Contracts

Current

Houston, Texas, Us

Sep 2022 - Present

Engineering Manager

Charlotte, Nc, Us

---------- Birdsboro, PA ---------- Provided engineering management services for the EPC of a 488MW combined-cycle, single-shaft power generation facility constructed on a reclaimed industrial site. The facility was based on a GE 7HA.02 combustion turbine. The Steam Turbine and HRSG are Alstom legacy equipment. The project included a 4 mile, 230 kV transmission line (approx. 1 mile was underground. solid dielectric cable) and the construciton of a 230 kV switchyard to interconnect into the PJM system.---------- New Carlisle, IN ---------- Performed engineering and construction oversight to add "Black Start" capability to an existing generating station. The project installed 4, Caterpillar C175-20, 3.9MW units and all integrating equipment and software to provide enough power to start either of the SGT6-5000F combustion turbines and participate in transmission system's emergency restoration plans.---------- Carmichaels, PA ---------- Managed the EPC mechanical completion turnover process for a 620MW combined-cycle, single-shaft power generation facility constructed on a reclaimed industrial site. The facility was based on a GE 7HA.02 combustion turbine and a heavily duct fired Alstom HRSG.

Mar 2016 - Apr 2022

Project Manager / Director Of Engineering

Coronado Power Ventures, Llc

Coronado Power Ventures is a small development organization that develops highly efficient, combined cycle power generation projects. The team focused on developing new generation in the ERCOT system; the La Paloma Energy Center, a 707 MW net generating station located in Harlingen, TX to be connected to the south zone of the grid; and the Pinecrest Energy Center, a 735 MW net generating station located in Lufkin, TX that to be connected to the north zone. Responsible for all technical aspects of developing new, green-field, combined-cycle power generation connected to the ERCOT grid including: Project siting and locating key infrastructure elements including water, electric and gas transmission, rail and roadway access; Environmental permitting for PSD & GHG air quality permits, TPDES and USACE permits; Transmission interconnection; EPC contract development and negotiation.  Managed the preparation of the engineering basis for a firm fixed-price EPC contract for the Las Brisas project, a petroleum coke fired generating station with a nominal capacity of 1300 MW located on the ship channel in Corpus Christi, TX.

2009 - Mar 2016

Senior Project Engineer

Irving, Texas, Us

---------- Reisel, TX ---------- Managed the engineering and construction of a twelve-mile reclaimed water pipeline and cooling tower blow down discharge line for Sandy Creek generating station, a 900 MW supercritical coal fired boiler.

2007 - 2009 ~2 yrs

Project Manager

San Antonio, Tx, Us

---------- Zheleznogorsk, Russia ---------- Led a team of consultants and engineers responsible for monitoring the engineering, procurement, and construction of a 250 MW equivalent coal-fired, combined heat and power facility in the Krasnoyarsk region of Siberia.---------- McCarran, NV ---------- Responsible for a Construction Management consulting team responsible for oversight of a Lump-Sum Turn-key Contract for a 725 MW generating plant.---------- Valmy, Nevada ---------- Prepared the feasibility studies and initial cost estimates for the expansion of an existing 600 MW coal fired facility in. Conceptual designs and layouts were prepared for expansions ranging in size from 300 MW to 2000 MW. The scope of the studies included evaluations of Fluidized Bed and Pulverized Coal boiler technologies as well as emissions control technologies and configurations.

2005 - 2007 ~2 yrs

Project Lead

Houston, Texas, Us

---------- Bartow, Florida ---------- Served as the engineering liaison between the constructor and the engineering contractor during the construction of a 650 MW generating plant. The plant is configured as a two-on-one combined-cycle facility utilizing Siemens Westinghouse combustion and steam turbines, and Nooter Erikson HRSG’s. ---------- Pasadena, TX ---------- Performed Engineering Management for a $40MM Ultra Low Sulfur Diesel conversion project in Pasadena, Texas. The project included the installation of a new reactor vessel and the upgrade of the hydrogen compressors.

2003 - 2005 ~2 yrs

Project Engineer

Irving, Texas, Us

Provided Engineering Management and technical support for the development of power generating facilities.---------- Calcasieu Parish, LA ---------- Served as project manager for the engineering and construction of a 230kV, 4-breaker substation for the Calcasieu Power 350 MW generating plant. Provided engineering management and contractor oversight of the EPC contract and OEM contract management for equipment purchased under a master purchasing agreement, e.g. combustion turbines, generator step-up transformers, generator circuit breakers, and isolated phase bus duct.---------- Carson City, MI ---------- Provided engineering management and contractor oversight during the installation of a refurbished Alstom 345kV generator step-up transformer following a bushing failure. Performed contract management for the environmental noise remediation efforts in a 700 MW simple-cycle generating station.  Directed the completion and turnover of a $200MM construction project. Enforced and applied the relevant sections of the contract to ensure appropriate punch-list items are completed or negotiated out of the scope of the contract.

1999 - 2003 ~4 yrs

Quality Assurance Manager / Sr. Electrical Engineer

Worley International, Inc.

 Managed the quality assurance processes and implemented the quality control system in the newest division of a world-class engineering and construction company. Responsibilities included: planning, leading, and conducting internal audits, overseeing the system improvement committees, leading the Lloyds of London auditors through the internal documents and processes. Worley International, Inc. obtained ISO 9001 certification in June of 1999. Developed quality assurance procedures for 3-D modeling of offshore production and drilling platforms. Responsibilities included: managing relationships between project controls, piping design, structural design, and drafting disciplines.  Led the electrical engineering activities to purchase the electrical facilities on four offshore platforms in Bohai Bay, China. The project included three combustion turbine generators and a smaller stand-by diesel generator to support the drilling, production, and loading facilities.  Coordinated the development of an Electrical Database to minimize the number of man-hours expended to track electrical loads and bulk material purchases. The database automatically generated load calculation summaries, equipment data sheets, and bulk materials requisitions.

1998 - 1999 ~1 yr

Electrical Engineer

London, Middlesex, Gb

---------- Arzew, Algeria ----------Led an electrical team of engineers, designers, and construction superintendents during the construction and commissioning of the Sonatrach LNG debottlenecking and re-powering project.  Performed contractor management for the engineering and construction of a 60 kV, indoor, air insulated substation.  Directed the site assembly of two (2) 30 MVA step-down transformers to tie the on-site generation to the local transmission grid.  Directed the construction of a 60 kV underground duct bank system and managed all cable pulls, cable pulls, and acceptance testing.  Directed the construction of a new electrical equipment building (site erected) to support the operation of 4 field erected boilers. Systems included medium (6.6kV) and low (380V) switchgear and motor control, UPS, and battery systems. Performed all acceptance testing and commissioning. Led a team of control system engineers to move all local turbine control and synchronizing capabilities to a centralized DCS.---------- Rhourde el Baguel, Algeria ---------- Worked as a member of an engineering and construction team to purchase and install distribution equipment for a 50 megawatt generating unit. The project combined three existing and three new combustion turbine generators to supply power to a high-pressure gas injection and oil recovery facility in the Algerian desert. ---------- Deer Park, TX ---------- Member of an engineering team to design and construct the medium and low voltage electrical distribution and motor control systems for Global Octanes (MTBE gasoline additive). Responsibilities included: preparing equipment specifications and design drawings (one-line diagrams, control schematics, interconnection diagrams), performing system calculations and protective relaying studies, preparing construction plans and installation details.

1990 - 1997 ~7 yrs
1 education record

Scott Stringfellow education

  • The University Of Tulsa
    The University Of Tulsa
    Electrical Engineering
FAQ

Frequently asked questions about Scott Stringfellow

Quick answers generated from the profile data available on this page.

What company does Scott Stringfellow work for?

Scott Stringfellow works for NextDecade.

What is Scott Stringfellow's role at NextDecade?

Scott Stringfellow is listed as Manager, Contracts at NextDecade.

What is Scott Stringfellow's email address?

AeroLeads has found 1 work email signal at @ppmsllc.com for Scott Stringfellow at NextDecade.

What is Scott Stringfellow's phone number?

AeroLeads has found 1 phone signal(s) with area code 817 for Scott Stringfellow at NextDecade.

Where is Scott Stringfellow based?

Scott Stringfellow is based in Greater Houston, United States while working with NextDecade.

What companies has Scott Stringfellow worked for?

Scott Stringfellow has worked for Nextdecade, Power Plant Management Services, Llc, Coronado Power Ventures, Llc, Dynegy, and Zachry Group.

How can I contact Scott Stringfellow?

You can use AeroLeads to view verified contact signals for Scott Stringfellow at NextDecade, including work email, phone, and LinkedIn data when available.

What schools did Scott Stringfellow attend?

Scott Stringfellow holds Bachelor Of Science (B.S.), Electrical Engineering from The University Of Tulsa.

What skills is Scott Stringfellow known for?

Scott Stringfellow is listed with skills including Power Generation, Energy, Epc, Project Engineering, Contract Negotiation, Electricians, Engineering Management, and Project Management.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.