Logistics Manager Ii
Current▪️ Launched the organization's first in-house logistics program. ▪️ Saved 71.4% in pipe logistics expenses on the FLNG Project by converting logistics solutions from barge to road transport while continuing full FERC compliance. ▪️ Trusted as the primary logistics manager for the multibillion-dollar Golden Pass LNG project (an expansion EPC project to add LNG and export operations to the Sabine Pass terminal). Highlights to Date: o Transported 5MM tons of aggregate by barge (42,000 piles with an average of 80 piles/barge) through intercoastal waterways. o Transitioned 1.6MM tons of aggregate and 2.2MM tons of clay from rail to over-the-road methods.▪️ Steered all logistics activities for the $3B FLNG project.o Transported 1MM+ linear feet of legal load spools using over-the-road methods. o Transported 250+ overweight/over-dimensional spools (VIP/vacuum insulated) by barge and over-the-road methods. Many spools were 120+ feet in length.