Semih Taş

Semih Taş Email and Phone Number

Project Engineer at VIVAVIS Turkey @ VIVAVIS Türkiye
Semih Taş's Location
Eyup, Istanbul, Türkiye, Turkey
About Semih Taş

In 2009 I started my university education at Erciyes University department of Electrical Electronic Enginering. I had some exams in my fist year at university to pass English preparation class and I passed all exams. First year of my university education, I have learned C and C++. I developed myself on C and C#. I have controlled some circuits, that include PIC, with interface program which I developed on C#. I am using Proteus to design and simulate electronic circuits. In addition I can use Multisim with basic level. In my internship at EMAS A.Ş. in 2011, I established test circuits using electromechanical equipment and tested the equipment produced with these circuits. In 2012, I did an internship at Teksan Generator. I participated in the post-production tests of generators. I also used the E3 program to draw the circuits of some generators. I graduated from university in 2013. At the same year I started military service as an sub-lieutenant and completed at 2014. After my military service I had started working as a maintenance engineering in AE Tehcnic Engineering for 2 years. After that, I worked for Arge Mühendislik İnşaat Necat Ayracı as a maintenance engineer between 2017 and 2018. I have been working as a production engineer and occupational safety specialist at Taytech Automation company since June 2020.

Semih Taş's Current Company Details
VIVAVIS Türkiye

Vivavis Türkiye

View
Project Engineer at VIVAVIS Turkey
Semih Taş Work Experience Details
  • Vivavis Türkiye
    Engineering Department Manager
    Vivavis Türkiye Jan 2024 - Present
  • Vivavis Turkey
    Project Engineer
    Vivavis Turkey Jun 2021 - Present
    Istanbul, Turkey
    I work as a project engineer in a project with İSKİ which called as Flowmeter Replacement and Infrastructure Facilities on the Main Transmission Line of Drinking Water Treatment Plants. Within the scope of the work, we perform fault detection and replacement of magnetic and ultrasonic flow meters in certain locations on the Anatolian and European sides of Istanbul, and new flow meters and valve installations on the lines. My responsibilities:1. At the beginning of the work, making field explorations, detecting defective flow meters and suggesting needle valve installations where necessary,2. Presenting a business plan to the administration after the exploration is over,3. Organizing factory acceptance tests,4. To prepare temporary measurement reports before flowmeter and valve changes and to present mechanical, construction and electrical projects of flowmeter rooms after equipment changes,5. Placing and commissioning rtu panels where necessary for flowmeters to communicate with SCADA systems,6. Construction, electricity, etc. To have the necessary excavations for the subcontractors according to the procedures specified in the tender,7. Execution of OHS activities,8. Supply of personnel needs or equipment to be used for business purposes,9. Contacting institutions such as Tedaş and İgdaş before working.
  • Taytech Advanced Automation Solutions
    Tehcnical Group Manager
    Taytech Advanced Automation Solutions Jun 2020 - Jun 2021
    Kocaeli, Turkey
    My main tasks:1. Making the design, drawing and material selection of the electrical panels we produce for fire pumps, clean water pumps, circulation pumps,2. Programming of and hmi of Delta or Siemens according to customer demand,3. To work as an occupational health and safety specialist (I work as the assistant of our full-time OHS specialist, since at least B class certificate is required due to our job and I have a c class OHS certificate),4. I am working on getting the UL508A standard required to enter the American market.
  • Arge Mühendislik Necat Ayrancı
    Maintenance Engineer
    Arge Mühendislik Necat Ayrancı Jul 2017 - Oct 2018
    İstanbul, Türkiye
    We maintained and repaired fire, drainage and ventilation systems on M2 (Yenikapı-Hacıosman) and M6 (Levent-Boğaziçi Üniversitesi) metro line that belong to Metro İstanbul. In addition to that, sometimes we provided business development proposals. We were responsible for nearly 10000 equipments. The equipments that we maintained were boilers, burners, chiller, air conditioning systems, screw compressors, alarm valves, sewage ejectors, drainage pumps, sewage pumps, booster, submersible pumps, gas fire extinguishing systems, fire pumps, fire reel cabinets, deluge/pre-action valves, pressure control valves, butterfly valves, flow switches, portable fire extinguishers, hydrant valves, pneumatically actuated dampers, diffuser axial fans, exhausting and supply fans. Moroever, we used to apply weekly, monthly, for 3, 6, 12 months maintenance. My missiond as a maintenance engineer were: o Directing maintenance team according to our two-year plan,o Creating maintenance team according to their abilities,o Keping maintenance and fault records seperately for all equipments,o Preparing progress payment end of each month,o Preparing weekly reports and sometimes making presantations.o Attending weekly meeting with Metro İstanbul's engineers.o Making a purchase for our workers what they need (shoes, working clothes etc.)
  • Ae Technic Engineering
    Maintenance Engineer
    Ae Technic Engineering Jan 2015 - Apr 2017
    İstanbul, Türkiye
    We maintained and repaired fire, drainage and ventilation systems on M2 (Yenikapı-Hacıosman) and M6 (Levent-Boğaziçi Üniversitesi) metro line that belong to Metro İstanbul. In addition sometimes we provided business development proposals. We were responsible for nearly 10000 equipments. The equipments that we maintained were screw compressors, alarm valves, sewage ejectors, drainage pumps, sewage pumps, booster, submersible pumps, gas fire extinguishing systems, fire pumps, fire reel cabinets, deluge/pre-action valves, pressure control valves, butterfly valves, flow switches, portable fire extinguishers, hydrant valves, pneumatically actuated dampers, diffuser axial fans, exhausting and supply fans. In additionto that we applied weekly, monthly, for 3, 6, 12 months maintenance. My missions as a maintenance engineer were: o Directing maintenance team according to our two-year plan,o Creating maintenance team according to their abilities,o Keping maintenance and fault records seperately for all equipments,o Preparing progress payment end of each month,o Preparing weekly reports and sometimes making presantations.o Attending weekly meeting with Metro İstanbul's engineers.o Making a purchase for our workers what they need (shoes, working clothes etc.)
  • Teksan™
    Intern Engineer
    Teksan™ Jul 2012 - Aug 2012
    İstanbul, Türkiye
    • Designing circuits with using E3 and Autocad for generators• Generator testing
  • Emas.Tr
    Intern Engineer
    Emas.Tr Jun 2011 - Jul 2011
    İstanbul, Türkiye
    • Product testing in lab (relays, contactors, counters, switches)• Designing control circuits

Semih Taş Education Details

Frequently Asked Questions about Semih Taş

What company does Semih Taş work for?

Semih Taş works for Vivavis Türkiye

What is Semih Taş's role at the current company?

Semih Taş's current role is Project Engineer at VIVAVIS Turkey.

What schools did Semih Taş attend?

Semih Taş attended Erciyes University.

Not the Semih Taş you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.