Staff Engineer
Current• Owner advisor for RiverRenew a $400M combined sewer tunnel and facilities project. The program is to capture and treat majority of CSO discharge by legislative deadline of July 1, 2025, to reduce bacteria, trash and other pollutants impacting the Potomac River, Hooffs Run and Hunting Creek. BC is partnering to manage planning, design, and implementation of a 2-mile-long, 12-foot-diameter tunnel; .5-mile-long, 6-foot-diameter diversion sewer; five diversion chambers; 40 mgd tunnel dewatering pumping station; 130 mgd wet weather pumping station; 90,000 cfm odor control facility; two 3,000 cfm odor control systems; and GI improvements.• Owner advisor on an interceptor replacement project in the heart of Alexandria. Project includes upgrading 1-mi of the AlexRenew-owned Commonwealth Interceptor from 36-in to 48-in in diameter to combat excess infiltration and inflow.