Senior Reservoir Engineer
CurrentTeine Energy acquired Chauvin Asset from Repsol Canada.Senior Exploitation Engineer responsible for all of Chauvin asset (~950 producers and ~350 injectors). Heavy oil field (API: 15-20) producing ~8100 bopd. Production was increased from 6600 in 2022 to 8100 in 2024. Details of examples where I partaked in this success are listed below• Applied for first time in WCSB the concept of cyclical water flooding that increased production in various parts of Chauvin by 5-15%.• Optimized waterflood patterns through classical reservoir engineering analyses increasing oil production by 10-15%.• Built a waterflood dashboard that combines data from Geoscout, PVR as well as surveillance data to aid in waterflood optimization.• Identified areas where further injection can increase oil production. Put together monitoring program for those areas to capture changes in submergence post injection changes and execute speedups. Those pump speed ups added 600 bopd of incremental production.• Identified producers’ stimulation opportunities (with 100 bopd uplift) to remove scale, wax or asphaltene. Identification was based on calculating theoretical productivity index and comparing it to actual values. • Improved a mature field production by 15% through mapping water cut in the field, adjusting targets to sweep oil from the edges of low water cut parts in the reservoir while speeding up producers there.• Generated production forecast and AFE economics for various gas and oil wells re-activation candidates.• Carried out reservoir pressure survey analyses and submitted all the required regulatory files and applications such as D65, O38, initial pressure survey and annual pressure survey tests.