AeroLeads people directory · profile

Sherif Yared, P.Eng Email & Phone Number

Senior Advisor, Commercial Supply and Facilities at Inter Pipeline
Location: Calgary, Alberta, Canada 8 work roles 2 schools
1 work email found @interpipeline.com LinkedIn matched
✓ Verified August 2026 4 data sources Profile completeness 100%

Contact Signals · 1 work email

Work email s****@interpipeline.com
LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Senior Advisor, Commercial Supply and Facilities
Location
Calgary, Alberta, Canada
Company size

Who is Sherif Yared, P.Eng? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Sherif Yared, P.Eng is listed as Senior Advisor, Commercial Supply and Facilities at Inter Pipeline, a with 1109 employees, based in Calgary, Alberta, Canada. AeroLeads shows a work email signal at interpipeline.com and a matched LinkedIn profile for Sherif Yared, P.Eng.

Sherif Yared, P.Eng previously worked as Senior Advisor, Commercial Supply & Facilities at Inter Pipeline and Supply & Facilities Representative at Inter Pipeline. Sherif Yared, P.Eng holds B.A.Sc., Chemical Engineering from University Of Ottawa / Université D'Ottawa.

Company email context

Email format at Inter Pipeline

This section adds company-level context without repeating Sherif Yared, P.Eng's masked contact details.

*@interpipeline.com
71% confidence

AeroLeads found 1 current-domain work email signal for Sherif Yared, P.Eng. Compare company email patterns before reaching out.

Profile bio

About Sherif Yared, P.Eng

Engineering professional with over ten years’ cross-functional experience in the Oil and Gas industry, including: operations engineering, process design, production forecasting and planning, project development and execution, and project commissioning and start-up. I have proficiency executing strategic business plans yielding profits as well as successfully delivering on commitments while maintaining a safety-first mindset

Listed skills include Petroleum Economics, Process Engineering, Reservoir Engineering, Eor, and 18 others.

Current workplace

Sherif Yared, P.Eng's current company

Company context helps verify the profile and gives searchers a useful next step.

Inter Pipeline
Inter Pipeline
Senior Advisor, Commercial Supply and Facilities
Calgary, AB, CA
Employees
1109
AeroLeads page
8 roles

Sherif Yared, P.Eng work experience

A career timeline built from the work history available for this profile.

Senior Advisor, Commercial Supply And Facilities

Calgary, Ab, Ca

Senior Advisor, Commercial Supply & Facilities

Current

Calgary, Alberta, Canada

Jun 2023 - Present

Supply & Facilities Representative

Calgary, Alberta, Canada

Jul 2021 - Jun 2023

Production Planning Engineer, Business Planning And Optimization

Fort Mcmurray, Alberta - Long Lake Operations

Managed site-wide production supply/demand and leased forecasts required to plan monthly oil movements and maximized product throughput by minimizing effects of outages, process upsets and market conditions while maintaining optimum product inventoryOptimized diluent-product blend ratios by enhancing shipping viscosity sampling methodologies that minimized over-blending losses by $100K per yearSpearheaded export pumps capacity trial to facilitate future production growth; identified opportunity to upgrade pump motors and impellers to increase shipping capacity by 20kbpdIdentified opportunity to sell balance Synthetic crude based on market conditions yielding $2M profitsCollaborated with cross-functional teams to identify cost reduction opportunities in chemical and natural gas consumption leading to $5M savings on operating expensesDeveloped inventory strategy to utilize retired tanks for the storage of over-purchased diluent during market turbulence, preventing $700K in losses and providing additional capacity for future operations

Apr 2019 - Apr 2020

Field Production Engineer

Fort Mcmurray, Alberta - Long Lake Operations

Managed the daily production of 120 well pairs by overseeing field operations and collaborating with production and maintenance teams to achieve production targets of 50kbpd DilBit and 30,000 m3/d steamImplemented Management of Changes (MOCs) to introduce control safeguards for overpressure protection on well pairs to support Process Safety Management (PSM) initiativesIdentified the root cause of failing valve bonnets and collaborated with multiple teams to develop a preventative maintenance program leading to a reduction in valve failures and savings over $5MActively involved in many area hazard assessments as the lead site technical representative, including the HAZOP for a new Well Pad Facility ($400M capex); identified multiple dead legs within the steam system and ensured proper safeguards were designed in order to mitigate freeze potentials Developed numerous Well Pad operating procedures, including ones for the wildfire emergency shutdown; led the well pads Pre-Startup Safety Review walk-down post-fire and ensured they were energized safelyServed as the Lead Engineer in the worksite Health and Safety Committee by coordinating and managing safety and environmental practices for all engineering related concernsLed field-level commissioning and start-up of $50M capex project for newly drilled wells by working with engineering, operations, and maintenance teams to deliver a safe start-up ahead of schedule Successfully troubleshot problematic wells with downhole scale build-up by implementing chemical and solvent flushes, saving over $2M in electrical submersible pump (ESP) workoversChampioned a number of process improvement initiatives, such as improving low-flow automation control functionality, which reduced downhole ESP trips by 30%Mentored Engineers-in-Training by supervising their work and providing field-level training to ensure they were proficient with field operations and can successfully optimize and troubleshoot wells

Sep 2014 - Apr 2019

Contact Engineer - Hydrocracker Operations

Fort Mcmurray, Alberta - Long Lake Operations

Responsible for monitoring unit performance and supporting operations with day-to-day activitiesLed troubleshooting efforts during area process upset conditions and provided technical support to operations in an effort to minimize effects of plant upsetsSuccessfully extended reactor catalyst life by 33% and minimized coke formation; collaborated with operations and performed trials to optimize quench gas flow and reactor temperature Built a heat exchanger predictive fouling tool to optimize maintenance cleaning schedule by transitioning from a time-based to a condition-based approach Performed PSV relief verification calculations to ensure adequacy after plant throughput increaseAssisted with Pre-Startup Safety Review walk-down to ensure the unit was safely energized after area outage

Sep 2013 - Aug 2014

Process Engineer

Calgary, Canada Area

Developed trials with contact engineers and operations for the water treatment chemical system; identified opportunity to improve dosing logic, increasing throughput by 10% per unit chemical spentIdentified the root cause for off-spec treated water in the Hot Lime Softener to be inadequate pH and turbidity analyzers; prepared turnaround scopes to upgrade analyzers, reducing off-spec water by 60%Assessed existing piping hydraulics on facility diluent loop and provided recommendations for upsizing pumps and control valves to support heavier diluent feed stock

Sep 2012 - Aug 2013

Process Engineering Intern

Calgary, Canada Area

Built a hydraulic model that confirmed the plant fuel gas system can handle 100% natural gas loadExecuted design calculations and made recommendations on heat exchanger network fouling within glycol utility systemDeveloped volume balances for the water treatment facility and identified flow-meter deficiencies; prepared scopes for plant turnaround to upgrade meter loops in order to resolve water recycle imbalances

Jan 2012 - Aug 2012
Team & coworkers

Colleagues at Inter Pipeline

Other employees you can reach at interpipeline.com. View company contacts for 1109 employees →

2 education records

Sherif Yared, P.Eng education

FAQ

Frequently asked questions about Sherif Yared, P.Eng

Quick answers generated from the profile data available on this page.

What company does Sherif Yared, P.Eng work for?

Sherif Yared, P.Eng works for Inter Pipeline.

What is Sherif Yared, P.Eng's role at Inter Pipeline?

Sherif Yared, P.Eng is listed as Senior Advisor, Commercial Supply and Facilities at Inter Pipeline.

What is Sherif Yared, P.Eng's email address?

AeroLeads has found 1 work email signal at @interpipeline.com for Sherif Yared, P.Eng at Inter Pipeline.

Where is Sherif Yared, P.Eng based?

Sherif Yared, P.Eng is based in Calgary, Alberta, Canada while working with Inter Pipeline.

What companies has Sherif Yared, P.Eng worked for?

Sherif Yared, P.Eng has worked for Inter Pipeline and Cnooc International.

Who are Sherif Yared, P.Eng's colleagues at Inter Pipeline?

Sherif Yared, P.Eng's colleagues at Inter Pipeline include Sheldon Mudry, Guillaume Viguié, Roxie Cao, Fmva®, Mmgt, Nain Mehrotra, and Tanweer Syed.

How can I contact Sherif Yared, P.Eng?

You can use AeroLeads to view verified contact signals for Sherif Yared, P.Eng at Inter Pipeline, including work email, phone, and LinkedIn data when available.

What schools did Sherif Yared, P.Eng attend?

Sherif Yared, P.Eng holds B.A.Sc., Chemical Engineering from University Of Ottawa / Université D'Ottawa.

What skills is Sherif Yared, P.Eng known for?

Sherif Yared, P.Eng is listed with skills including Petroleum Economics, Process Engineering, Reservoir Engineering, Eor, Risk Assessment, Chemistry, Heat, and Java.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.