Project Technologist
Current(1) Checking for the alignment of the insulation and the air barrier in the drop ceiling and seal any gaps in the air barrier.(2) Checking for the junction at the top plate and top of the exterior walls are sealed.(3) Checking for the cavities in the corners and headers of the framed walls are filled with a product having a thermal resistance (R-value) of.