Manager,Electrical.
CurrentCompleted 635million US$ backward integration project for Chemanol Petrochemical Plants at Al-Jubail, Saudi Arabia consisting of Methanol, Methylamines, DMF, Penta Erithritol, Acetaldehyde.& relevant major utilities. Obtained special permission/clearance by waiver in company policy from Saudi Electric Co. for Parallel Operation of STG set (8.7MW) with Grid supply at 34.5Kv distribution level for Chemanol, which is the only company in Saudi Arabia granted such permission.” Successfully Conceptualized & implemented Fast Bus Transfer System(FBTS) BACKWITH USA without any interruptions in process plant to increase power reliability.The system operated at 3 occassions successfully without any tripping.Carriedout total Engineering & implemented successfully Tankfarm facilities at King Fahad Industrial Port Jubail including Berth for shipment of end product.Energy Manager as additional responsibility & embark on energy saving schemes implementation.