Sid Morris work email
- Valid
- Valid
Sid Morris personal email
I have been a construction superintendent for the last 12 years with 32 years experience in commercial construction working from carpenter, foreman, superintendent, and safety engineer in Silicon Valley environments that include interior office tenant improvements, school remodels, healthcare facilities/OSHPD, biopharmaceutical companies, and advanced technology companies. I'm familiar with the various aspects of commercial construction and am able to offer considerable value to any project. As a project superintendent for general contractors my role has been to ensure success for both my employer and the client, always with the goal to exceed expectations. On my projects I'm responsible for the schedule, managing sub-contractors, quality control, maintaining the budget, inspections, and jobsite safety. Microsoft Project is the primary scheduling program I have used.In March of 2000 I was awarded Lockheed's "Productivity Improvement Program Award" while remodeling their gyroscope laboratory. To receive this as an outside contractor was quite an honor and represents the high standard I always aim to achieve.
-
Construction SuperintendentGordon Prill, Inc. May 2015 - PresentSunnyvale, Ca, UsCurrently I'm employed at Gordon Prill, Inc. involved with aerospace construction projects at Lockheed in Sunnyvale, Ca. -
Construction SuperintendentEnvision Construction & Design, Inc. Aug 2013 - Jan 2015Dublin, Ca, UsAs a project superintendent I was responsible for scheduling, managing sub-contractors, quality control, maintaining the budget, inspections and safety. The goal is always to exceed client expectations.Envision specializes in construction for medical facilities (OSHPD), and MOB facilities such as dialysis treatment facilities and related medical construction. Projects for Envision that I supervised include:1. Davita Estrella Dialysis Center T.I., Phoenix, AZ, $900,000. January 2014 to March 2014.2. San Ramon Regional Medical Center(OSHPD) ADA Upgrade, $650,000. August 2013 to December 2013. -
Construction SuperintendentStellar Energy Gp, Inc Jan 2013 - Jun 2013Petaluma, Ca, UsThis was a contract position I acquired through Crescent Alliance Group which is a job placement business. My role was to supervise for the general contractor the installation of solar panel arrays on 4 elementary school campuses in the Moreland School District in San Jose.The project involved laying out for solar panel arrays in specified parking lots and playground areas, underground boring to accommodate electrical conduit installation, erection of the steel panel supports, and installation and commissioning of the solar panels that were integrated into the schools' power supply. Also included were repairs and/or modifications to affected concrete, asphalt and landscape areas. -
Construction SuperintendentAngotti & Reilly. Inc. Apr 2011 - Dec 2012My role for Angotti & Reilly was to be a superintendent for 2 public school remodel projects. They were:1. East Side High School District (San Jose). $900,000. June 2012 to November 1012. This was a site lighting upgrade at 4 high school campuses that involved installing approximately 40 street lights in each campus. Trenching was the method used for underground conduit installation, with significant asphalt, concrete, and landscape repair required. Work occurred during school hours, requiring a thorough, efficient safety plan. The project was completed successfully. 2. San Francisco Unified School District, Francis Scott Key Elementary School Modernization. $5,900,000. April 2011 to November 2012. This was a modernization of a grade school built in 1938 which involved major structural upgrades (foundational reinforced concrete), restroom upgrades (Plumbing, electrical, structural, finishes), New interior and exterior doors, frames, & hardware were installed, ADA upgrades at all entrance and egress locations (Concrete flat work, ramps, stairs), Electrical upgrades including coordinating with PG&E for service upgrade and relocation. The entire school was painted. A new playground with playground equipment was installed. Site work to comply with ADA requirements was done and the entire play ground had new asphalt installed.
-
Construction Superintendent, Safety OfficerJames R. Griffin,Inc. Jan 2010 - Jun 2010I was employed at James R. Griffin on a contract basis to act as a superintendent and safety officer for a project at Lawrence Livermore National Laboratory, National Ignition Facility (NIF), $590,000. The project was to install 4 wall collimators in the target area of the NIF research facility. It involved precise concrete forming and placing to accommodate the very precise installation of the wall collimators to be used in fusion research. The environment required diligent safety monitoring to ensure that high safety standards were met. This project was completed successfully.
-
Construction SuperintendentXl Construction Oct 1998 - Apr 2009Milpitas, Ca, UsAt the beginning of my 10-1/2 year employment at XL Construction I started as a carpenter, moved up to foreman, and then superintendent, and eventually a safety engineer. I also was assigned to head the then-fledgling Doors/Frames/Hardware department because of my background with door installation. As a superintendent I was responsible for scheduling, managing sub-contractors, quality control, maintaining the budget, inspections and safety. Because of my carpentry experience I was always available to do any hands on work that may have come up during any project. The goal is always to exceed client expectations.It was at XL that I gained experience in a variety of high tech commercial construction environments that include tenant improvements, advanced technology companies, clean rooms, school remodels, healthcare facilities/OSHPD, and biopharmaceutical companies.Projects that I performed on as superintendent for XL Construction include but aren't limited to:Abbott Vascular, Santa Clara, CA. Cardiovascular R&D facility the included Ex-Vivo Lab upgrade, N2 bulk tank and CDA compressor installation.Palo Alto Medical Foundation, Palo Alto, CA. CT Scanner installation.Chiron Corporation, Emoryville, CA. (Biopharmaceutical R&D and Vaccine Manufacturing. Sampl Retriever installation. Kaiser Hospital Door Replacement, Oakland, CA. (OSHPD) Replacement of 153 doors in occupied patient rooms.(Lockheed) THAAD Offices. Tenant improvement to an existing 4,500 s.f. lab and office area.Applied Materials, Santa Clara, CA. 157,000 s.f. T.I. and seismic upgrade, multi-phased project.(Lockheed) Bldg. 156E Exiting Modifications. 3,000 s.f. design build project to support construction of an attached ground up structure, B156G.
Sid Morris Skills
Sid Morris Education Details
-
De Anza Jr CollegeGeneral Studies
Frequently Asked Questions about Sid Morris
What company does Sid Morris work for?
Sid Morris works for Gordon Prill, Inc.
What is Sid Morris's role at the current company?
Sid Morris's current role is Construction Superintendent.
What is Sid Morris's email address?
Sid Morris's email address is si****@****bal.net
What schools did Sid Morris attend?
Sid Morris attended De Anza Jr College.
What skills is Sid Morris known for?
Sid Morris has skills like Construction Management, Microsoft Word, Contractors, Construction, Microsoft Project, Carpentry.
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial