Project Engineer
Barangaroo, Nsw, Au
Oxley Highway to Kundabung Pacific Motorway UpgradeConstruction of the Wilson River Bridge (14 Span, 530m long bridge crossing the Wilson River in Telegraph Point)- Barge construction works- Major cofferdam construction including installation of 500No sheet piles and 30,000t of rock.- Land and Marine based piling, both BCIP and driven steel tube- Precast pile caps over marine piles- Cast in-situ columns, headstocks, diaphragms, deck & approach slabs- 1800mm super tees spanning 38m each and weighing 80t.- Purpose made sidelifter erection truss for girder installation- Precast abutment and parapet installation.- Multiple crawler cranes including 110t, 180t, 300t & 600t (with superlift).