Process Engineer
Current• Develop operating envelope for Muara karang ORF, Tanjung Priok ORF and Cilamaya ORF one of the esential document providing guidance for safe operating condition along with their safeguards.• Become person in charge of Operating Envelope Revalidation Program, ensuring all flowstation will be revalidated on time.• Highly contributed to the study of deposit removal project in PHE ONWJ longest pipeline 72 km ZULU to PAPA, review OLGA simualtion, and future action. • Contributed to Dehydration replacement at PAPA flowstation project.