AeroLeads people directory · profile

Skip Evans Email & Phone Number

DCS Start Up Engineer
Location: Port Lavaca, Texas, United States 47 work roles
1 work email found @bluewaterenergysolutions.com 2 phones found area 361 LinkedIn matched
✓ Verified July 2026 4 data sources Profile completeness 71%

Contact Signals · 1 work email · 2 phones

Work email s****@bluewaterenergysolutions.com
Direct phone (361) ***-****
LinkedIn Profile matched
3 free lookups remaining · No credit card
Role
DCS Start Up Engineer
Location
Port Lavaca, Texas, United States

Who is Skip Evans? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Skip Evans is listed as DCS Start Up Engineer based in Port Lavaca, Texas, United States. AeroLeads shows a work email signal at bluewaterenergysolutions.com, phone signal with area code 361, and a matched LinkedIn profile for Skip Evans.

Skip Evans previously worked as Lead DCS Commissioning & Startup Engineer at Rev1 Power Services and Lead DCS Commissioning & Startup Engineer at Bluewater Consulting Services.

Company email context

Email format at bluewaterenergysolutions.com

This section adds company-level context without repeating Skip Evans's masked contact details.

{first_initial}{last}@bluewaterenergysolutions.com
86% confidence

AeroLeads found 1 current-domain work email signal for Skip Evans. Compare company email patterns before reaching out.

Profile bio

About Skip Evans

I have 37 years of experience in instrumentation and controls consisting of 20 years as DCS Commissioning and Startup Emngineer, 10 years as an instrument technician, and 7 years instrument installation. System experience includes Bailey Net90, INFI90, Operator IT B, and Emerson Ovation. Facility includes combined cycle, fluidized bed, coal fire, coal gasification, refineries, and chemical plants. DCS commissioning and startup responsibilities include commissioning instrument and electrical loops; writing procedures for and performing equipment functional checks; onsite re-engineering control logic, graphics, and dbase; implementing control logic, graphics, and dbase per control narrative or SAMA logic; tuning process loops; configuring DCS to OPE datalink communications; supervising multiple DCS engineers and I&C technicians; supporting operations during startup.

Listed skills include Plc, Power Generation, Boilers, Epc, and 15 others.

47 roles

Skip Evans work experience

A career timeline built from the work history available for this profile.

Lead Dcs Commissioning & Startup Engineer

Rev1 Power Services

Project was a retrofit and plant enhancement on two coal fired units with a total output of 75MW. The DCS was a ABB Symphony Pus with SA 800 hardware. Responsible for the commissioning instrument and electrical loops, performed equipment functional checks. Re-engineered control logic, graphics, and dbase changes as needed.

Feb 2016 - Dec 2016

Lead Dcs Commissioning & Startup Engineer

Acworth , Georgia , Us

This facility is a 1X1 combined cycle with a capacity of 310 MW. The unit consisted of a GE 7FA Gas Turbine, Nooter Eriksen HRSG, GE Steam Turbine, and Emerson Ovation ver. 3.5 DCS. Attended Factory Acceptance Test as client representative. Commissioned instrument and electrical loops, performed equipment functional checks. Maintained daily tracking program for loop commissioning and equipment functional testing. Re-engineered control logic, graphics, and dbase changes as needed. Supported operations during startup. Setup datalink communications with OPE technical advisors.

Oct 2014 - Jun 2015

Lead Dcs Commissioning & Startup Engineer

Bluewater Consulting Services

Two NID Alstom Scrubbers, Emerson Ovation 3.3.1 DCS. Attended FAT, commissioned instrument and electrical loops, performed equipment function checks. Maintained daily tracking program for loop commissioning and equipment functional testing. Re-engineered control logic, graphics, and dbase as needed. Setup datalink communications with OPE technical advisors.

Jun 2013 - Jun 2014

Lead Dcs Commissioning & Startup Engineer

Bluewater Consulting Services

Simple cycle peaking unit consisting of 5 LMS 100 Gas Turbines with an output of 500MW. BOP control system was an Emerson Ovation ver. 3.3.1 DCS. Commissioned instrument and electrical loops, performed equipment functional checks. Maintained daily tracking program for loop commissioning and equipment functional testing. Re-engineered control logic, graphics, and dbase changes as needed. Supported operations during startup. Setup datalink communications with various OPE technical advisors.

Aug 2012 - May 2013

Dcs Commissioning & Startup Engineer

Overland Park, Ks, Us

Black and Veatch designed Wet Scrubber on units 4/5. This unit was controlled by an ABB Automation 800XA DCS. Commissioned instrument and electrical loops, performed equipment functional checks. Supported operations during startup.

Jan 2012 - Apr 2012

Dcs/I&C Owners Representative

Overland Park, Ks, Us

This project was a fuel oil to natural gas retrofit, steam turbine rebuild, and installation of a Emerson Ovation ver. 3.0.4 DCS. Supported client with control logic, graphics, and dbase review. Oversaw control loop commissioning and equipment functional checks. Inspected the installation of field instrumentation, DCS I/O cabinets, I/O cabinet wiring, and DCS control room equipment.

Aug 2011 - Nov 2011

Dcs Commissioning & Startup Engineer

Overland Park, Ks, Us

Coal fired consisting of two 660MW Toshiba Steam Turbines, FGD, and Toshiba TOSMAP DCS. Worked on the FGD commissioning and startup phase. Worked on FGD commissioning instrument and electrical control loops, performed equipment functional test. Re-engineered control logic, graphics, and dbase as needed. Supported operations during startup.

Apr 2011 - Aug 2011

Dcs Commissioning & Startup Engineer

Overland Park, Ks, Us

Gas fired station is three 3x1 Combined Cycle Units with a total output of 3750 MW. These units consist of Mitsubishi 501G Gas Turbines, Toshiba Steam Turbines, Nooter Erikson HRSG's, and an Emerson Ovation ver. 3.0.4 DCS. Commissioned instrument and electrical loops, performed equipment functional checks. Re-engineered control logic, graphics, and dbase changes as needed. Supported operations during startup.

Aug 2010 - Apr 2011

Lead Dcs Commissioning & Startup Engineer

Overland Park, Ks, Us

Coal fire power station with an output of 850MW consisting of a Toshiba Steam Turbine, Alstom Boiler, Alstom FGD, and Emerson Ovation ver. 3.0.4 DCS. Worked with Black & Veatch and Ovation engineers at Factory Acceptance Test reviewing and building control logic, graphics, and dbase. Presented the project to the client over a 4 week period and made further changes on their request. Continued on to site and consulted during the installation of I/O cabinets, control room equipment, power and grounding. Commissioned instrument and electrical control loops, performed equipment function test. Re-engineered control logic, graphics, and dbase. Maintained daily tracking program for loop commissioning and equipment functional testing. Supervised activities for 4 DCS Engineers. Supported operations during startup.

Jun 2008 - Aug 2010

Dcs Commissioning & Startup Engineer

Overland Park, Ks, Us

Coal fired power station with a total output of 582MW. This unit consist of a Babcox and Wilcox Supercritical Boiler, Toshiba Steam Turbine, Foxboro IA 843 DCS, and Profibus. Commissioned instrument and electrical loops, performed equipment functional checks. Re-engineered control logic, graphics, and dbase. Supervised commissioning activities for 8 I&C technicians.

Jul 2007 - May 2008

Lead Dcs Commissioning & Startup Engineer

Rev.1 Power Services

This power station was a 1X1 Combined Cycle with a total output of 425 MW. The unit consisted of a M701G Gas Turbine, Deltak HRSG, Mitsubishi Steam Turbine, and an Emerson Ovation ver. 2.4.1 DCS with Profibus and Foundation Fieldbus. Oversaw the installation of DCS I/O cabinets, I/0 cabinet wiring, DCS control room equipment, DCS power and grounding. Commissioned instrument and electrical loops, performed equipment functional test. Maintained daily tracking program for loop commissioning and equipment functional testing. Supported operations during startup and performance testing.

May 2006 - Oct 2006

Instrumentation & Controls Technician

Advantage Instruments & Electrical

Crude Oil Refinery with a total output of 128,000 per day, FCCU capacity of 29,500 barrels per day, alkylation capacity of 10,000 barrels per day, and reforming capacity of 18,000 barrels per day. Responsible for routine instrumentation maintenance and troubleshooting.

Jan 2006 - Mar 2006

Dcs Commissioning & Startup Engineer

Rev 1 Power Services

Coal fired power unit with an output of 62MW. Unit consisted of a Kvaener CFB boiler, Mitsubishi Steam Turbine, and ABB Bailey INFI 90 DCS with OIS 43 consoles. Commissioned instrument and electrical loops, performed equipment functional test. Supported operations during startup.

Aug 2005 - Oct 2005

Instrumentation & Controls Technician

Epic Instrumentation Services

Ethylene production facility. Duties included routine instrument maintenance work during shutdown.

Jun 2005 - Jul 2005

Instrumentation & Controls Technician

Seabrook, Tx, Us

Crude oil refinery with a total output of 37,000barrels per day of gasoline and 20,000 barrels per day of distillates. Duties included routine instrument maintenance work during shutdown.

Mar 2005 - May 2005

Instrumentation & Controls Technician

Merit Electric

Petroleum refinery with an output of 500,000 barrels per day. Duties included routine instrumentation maintenance during shutdown and functional check of emergency shutdown system. Transferred to GE Conmec and supervised the commissioning of a 28 MW Expander Turbine.

Dec 2004 - Feb 2005

I&C/Dcs Technical Advisor

Pen Power

This project was to generate a punch list on GE Frame5 Gas Turbines facilities and submit an assessment report to Bechtel. The report consisted of photographing the unit and a written evaluation of what was needed to put the turbines back online. I was responsible for the control panel (Speedtronics) and instrumentation. This assignment also required interfacing with the local engineers which meant learning customs and protocols depending on what part of Iraq you were in.

Jul 2004 - Oct 2004

Lead Dcs Commissioning & Startup Engineer

Pen Power

This power station is two 2x1 combined cycle blocks with a total output of 1036 MW. Each unit consisted of GE Frame 7FS Gas Turbines, Doosan HRSG, GE Steam Turbine, and ABB Bailey INFI 90 DCS with OIS 43 consoles. Commissioned instrument and electrical control loops, performed equipment functional test. Re-engineered control logic, graphics, and dbase as needed. Maintained daily tracking program for loop commissioning and equipment functional testing. Supported operations during startup.

Oct 2003 - Dec 2003

Lead Dcs Commissioning & Startup Engineer

Pen Power

This facility is a 2x1 Combined Cycle with a total output of 600 MW. This unit consisted of GE Frame 7FA Gas Turbines, Cerrey HRSG, Alstom Steam Turbine, and Ovation DCS. Commissioned instrument and electrical control loops, performed equipment functional test. Re-engineered control logic, graphics, and dbase as needed. Supported operations during startup.

Jul 2003 - Sep 2003

Dcs Commissioning & Startup Engineer

Pen Power

Worked with Duke Flour Daniel Engineering supplied control narratives and SAMA logic to build control logic, graphics, and dbase on a Bailey INFI 90 DCS. Went through FAT with the client and made further changes per their request. This system was for a two 2 x 1 Combined Cycle Units.

Nov 2002 - Mar 2003

Lead Dcs Commisioning & Startup Engineer

Pen Power

Energia Campeche is 252 MW 1 x 1 Combined Cycle power plant consisting of a Mitsubishi Single Shaft 501F Gas Turbine, Cerrey HRSG, and Emerson Ovation DCS. Responsible for commissioning instrument and electrical control loops, performed equipment functional checks. Re-engineered control logic, graphics, and dbase as needed.

Sep 2002 - Oct 2002

Lead Dcs Commissioning & Startup Engineer

Atlanta, Georgia, Us

Tenaska 3 is a 845 MW combined cycle power plant consisting of 3 GE 7FA gas turbines, Deltak HRSG, and Bailey INFI 90 DCS with OIS 43 consoles. Responsible for commissioning instrument and electrical control loops, performed equipment functional checks. Re-engineered control logic, graphics, and dbase as needed. Setup datalink communications with various OPE technical advisors. Supported operations during startup and performance testing .

Sep 2001 - May 2002

Lead Dcs Commissioning & Startup Engineer

Atlanta, Georgia, Us

Griffith Energy is a 2x1 Combined Cycle unit with a total output of 570 MW. Facility consisted of GE 7FA Gas Turbines, NEM HRSG, and ABB Bailey INFI 90 DCS with OIS 43 consoles. Commissioned instrument and electrical loops, performed equipment functional checks. Re-engineered control logic, graphics, and dbase as needed. Maintained daily tracking program for loop commissioning and equipment functional testing. Supported operations during startup.

Aug 2000 - Aug 2001

Instrumentation & Controls Technician

Atlanta, Georgia, Us

Doyle 5 is a 400 MW simple cycle unit consisting of five GE Frame 7EA. Worked with GE technical advisor to commission turbine associated instrumentation and supported GE during startup.

Apr 2000 - Jul 2000

Field Service Engineer

Bailey Controls

Service engineer covering the southeast US. Worked on Net 90, INFI 90, and a variety of consoles including OIS 20, OIS 40's, and Management Command System (MCS). Service calls responsibilities included troubleshooting I/O modules, controller module's, trouble shooting systems software issue's. Updating software and firmware, installed rack I/O modules, consoles, and power supplies. Installed Y2K software per costumer request.

Mar 1999 - Jul 2000

Dcs Commissioning & Startup Engineer

Pen Power

Polk Power Station is a 260 MW Intergraded Coal Gasification Combine Cycle Unit consisting of a GE Frame 7FA Gas Turbine, GE Steam Turbine, Vogt HRSG, and Bailey INFI90 DCS with OIS42 consoles. After initial startup of this station in 1996 I returned to support capital projects with engineering changes to the DCS.I also enhance the DCS as requested by TECO engineering and operations.

Apr 1998 - Dec 1998

Instrumentation & Controls Supervisor

Latex Inc.

Commissioned and startup of four Solar 60S/C-402 Gas Turbines with compressor heads on a 18.92 mmscfd natural gas station. Supervised 10 local I&C technicians with calibration, loop check to a Bailey INFI 90, and operational startup support. Wrote calibration and loop check procedures, designed forms and tracked calibrations and loop check. Trained local I&C technicians on Fischer valves, Rosemount smart transmitters, SOR switches, and various other "western" instrumentation.

Nov 1997 - Mar 1998

Instrumentation & Controls Technician

American Instruments

This refinery has a 94,000 barrel a day refining capacity. I was responsible for routine instrumentation maintenance including calibration, device and control loop trouble shooting, and operational support.

Mar 1997 - Jul 1997

Lead Dcs Commissioning & Startup Engineer

Atlanta, Georgia, Us

This prototype unit was a 500,000 tons per year coal drying process. The control system was a Bailey INFI 90 with Lan 90 PCV5A consoles. I was responsible for commissioning instrument and electrical control loops, performed equipment functional checks. Re-engineered control logic, graphics, and dbase as needed. Supported operations during startup.

Mar 1997 - Jul 1997

Dcs Commissioning & Startup Engineer

Pen Power

Polk Power Station is a 260 MW Intergraded Coal Gasification Combine Cycle unit consisting of a GE Frame 7FA gas turbine, GE steam turbine, Vogt HRSG, and Bailey INFI 90 with OIS42 consoles. Commissioned instrument and electrical control loops, performed equipment functional test. Re-engineered control logic, graphics, and dbase as needed. Supported operations during startup.

Apr 1996 - Dec 1996

Dcs Commissioning & Startup Engineer

Atlanta, Georgia, Us

Muara Karang Power Station was a simple cycle plant capable of 300 MW via three GE MS9001E Gas Turbines. In 1995 Sumitomo Corp. added a GE STAG309E Combined Cycle Unit to boost the station output by185 MW. The BOP control system was a Bailey INFI 90 DCS with OIS 41 consoles. Commissioned instrument and electrical control loops, performed equipment functional test. Re-engineered control logic, graphics, and dbase as needed. Maintained daily tracking program for loop commissioning and equipment functional testing. Supported operations during startup.

Feb 1995 - Nov 1995

Instrumentation & Controls Supervisor

Atlanta, Georgia, Us

This project was a GEESI Wet Limestone Scrubber. Supervised 10 I&C technicians with instrument calibration, loop check to a Fisher Provox, and operational startup support. Maintained calibration and loop check, and functional check documentation.

Mar 1994 - Nov 1994

Dcs Commissioning & Startup Engineer

Atlanta, Georgia, Us

Richard M Flynn Station is a 2x1 Combined Cycle plant capable of 500 MW. This facility consisted of Siemens V84.2 Gas Turbines, Mitsubishi Steam Turbine, and Nooter Erickson HRSG. The BOP control system was a Bailey INFI 90 with MCS consoles. Commissioned instrument and electrical control loops, performed equipment functional test. Re-engineered control logic, graphics, and dbase as needed. Maintained daily tracking program for loop commissioning and equipment functional testing.

Nov 1993 - Jan 1994

Instrumentation & Controls Technician

Atlanta, Georgia, Us

Sep 1993 - Nov 1993

Dcs/I&C Owners Representative

Atlanta, Georgia, Us

Jun 1993 - Sep 1993

Lead Instrumentation & Controlstechnician

Atlanta, Georgia, Us

Jan 1993 - May 1993

Lead Dcs Commissioning & Startup Engineer

Interfacts Inc.
Jun 1992 - Nov 1992

Instrumentation & Controls Technician

Bay Area Instruments
Jan 1992 - May 1992

Lead Dcs Commissioning & Startup Engineer

Powergen Corp.
Jun 1991 - Nov 1991

Dcs Commissioning & Startup Engineer

Petrochem Technical Services
May 1990 - Mar 1991

Dcs Commissioning & Startup Engineer

Bay Area Instruments
Sep 1989 - Apr 1990

Instrumentation & Controls Technician

Aime International
Jul 1989 - Sep 1989

I&C/Dcs Maintainance Technician

Oxford Energy
May 1988 - Jul 1989

Instrumentation & Controls Technician

Qualified Personal Inc.
Jun 1987 - May 1988

Instrumentation & Controls Technician

Continental Power Services
Sep 1986 - May 1987

Instrumentation & Controls Supervisor

Project Construction Corp.
Aug 1985 - Sep 1986
FAQ

Frequently asked questions about Skip Evans

Quick answers generated from the profile data available on this page.

What is Skip Evans's role at their current company?

Skip Evans is listed as DCS Start Up Engineer.

What is Skip Evans's email address?

AeroLeads has found 1 work email signal at @bluewaterenergysolutions.com for Skip Evans.

What is Skip Evans's phone number?

AeroLeads has found 2 phone signal(s) with area code 361 for Skip Evans.

Where is Skip Evans based?

Skip Evans is based in Port Lavaca, Texas, United States.

What companies has Skip Evans worked for?

Skip Evans has worked for Rev1 Power Services, Bluewater Consulting Services, Overland Contracting Inc., Black & Veatch Core, and Rev.1 Power Services.

How can I contact Skip Evans?

You can use AeroLeads to view verified contact signals for Skip Evans, including work email, phone, and LinkedIn data when available.

What skills is Skip Evans known for?

Skip Evans is listed with skills including Plc, Power Generation, Boilers, Epc, Engineering, Construction, P&Id, and Steam Turbines.