Development Engineer, Equipment Engineer
Current1. Established and developed a pilot line for the new HDD substrate. 2. Contributed in the equipment development for the Chemical-Mechanical Polishing (CMP) of new HDD substrate, focusing on surface and edge polishing. 3. Collaborated with the process engineer to design equipment and tools tailored for the manufacturing process of the new HDD substrate.4. Managed equipment sustainability and scheduled maintenance for the pilot line to ensure continuous operation and production efficiency.5. Installed and qualified new equipment for the production of the new HDD substrate, ensuring compliance to the quality and manufacturing requirements.6. Led the conversion of existing equipment to accommodate the processing requirements of the new HDD substrates.7. Designed the production layout for the expansion of the new HDD substrate pilot line, focusing on workflow efficiency and manufacturing capacity to meet the growing demand.