Senior Structural Engineer
CurrentSenior Structural Engineer responsible for results on the following projects:HSIA Groundside Circulation Improvements - Stanfield Way Overpass: design of the first NEXT Beam bridge in Nova Scotia; a 23.5 m single span, semi-integral abutment, NEXT 32 F Beam structure, with two lanes and a 30⁰ skew.Varner #2 Bridge: design of a 53 m single span, two lane, semi-integral, steel twin trapezoidal box girder bridge, in New Germany, NS.Potashcorp Salt Dumper Detailed Design Project: preliminary & detailed design of a B-Train Truck belly-discharge salt dumping facility, support structures and galleries for new conveyance systems, and connections to existing structures, at the Potash Corporation of Canada, Saint John, NB.PCS Marine Terminal Expansion Project: preliminary design and cost-estimating for large-scale extensions to large glulam timber storage sheds, and reconfiguration and extension of the materials handling conveyance systems, at the Potash Corporation of Canada, Saint John, NB.McNab’s Bridge: design of NSTIR’s first fully integral, precast concrete Hollow-Core voided slab panel bridge; a 16.8 m single span, two lane structure with a 20⁰ skew, in McNab’s Cove, NS.Dunn's Loop Underpass: design of a fully integral, two - 40 m continuous spans, two lane, prestressed precast concrete girder bridge crossing Highway 104, near Antigonish, NS.HRM Captain William Spry Culvert: design of an 11.6 m span precast concrete three-sided rigid frame, crossing an environmentally sensitive wetland and MacIntosh Run, in Halifax, NS.2013 HRM Bridge Inspections: Co-Supervisor for inspection of 80+ HRM owned bridges and culverts.Marine Atlantic Inc. Port aux Basques Expansion Joint Replacement: design and and preparation of construction documents to replace five bridge deck joints on the ramp to the Gulfspan Dock, and for a hydraulic lifting cylinder support beam displacement monitoring and restraint system on the Alternate Dock loading ramps.