Principal Engineer/ Supervising Engineer/ Engineering Manager/ Project Manager
Worleyparsons
Various
2009 - 2012Project Engineering Manager, WorleyParsons, Reading, PAEL Vigia – Greenfield EPC 565MW 2x1 Combined Cycle Power Project, Estado Merida Venezuela. followed Booz Allen Hamilton/DOE National Energy and Technology Laboratory (NETL), Pittsburgh, PA 2011 Project Manager, WorleyParsons, Reading, PAPetrobank – May River Phase 1 Project, Calgary, Alberta. 2009 Lead Mechanical Engineer, WorleyParsons, Reading, PACEZ-Varna, Brownfield – 880 MW 2 x 1 Combined Cycle Power Plant in Bulgaria. Conceptual Design. 2009 Project Manager, WorleyParsons, Reading, PAICRC EnvirRes – Coal Gasification to Hydrogen and Liquids. Syngas Treatment Island 2007 - 2009 Power & Gasifier Block Project Leader, WorleyParsons, Brisbane, QLD, Australia Project Manager, WorleyParsons, Reading, PAZeroGen, IGCC/CCS Demonstration Project, Queensland, Australia. 2006 - 2007 Senior Supervising Engineer, WorleyParsons, Folsom, CAConstruction Manager, WorleyParsons, Stanton, CASouthern California Edison, Peaker Power Project, CA. (5) Five - 45 MW simple cycle GE LM 6000's 2005 - 2006 Engineering Manager, WorleyParsons, Reading, PASite Construction Engineer, WorleyParsons, Roseville, CAEPC - Gemma Power Systems, Roseville Electric Power Plant, California. 160 MW greenfield 2 on 1 natural gas-fired combined cycle 2004 - 2005 Supervising Engineer, WorleyParsons, Reading, PAWestern Greenbrier, WV. Performed process design of coal handling and ash handling systems associated with a greenfield 100 MW, $220 MM waste-coal fired power project.Vineland, New Jersey. Developed winning proposal for 100 MW combined cycle power plant. Assisted with proposal for 100 MW combined cycle Minnesota power plant.1997 - 2004 Design and Construction Manager – Principal Engineer, WorleyParsons, Reading, PASite-Based Projects included: Pearl of the Gulf, Doha, Qatar Anheuser-Busch, Van Nuys, CA Procter & Gamble, Mehoopany, PA and Dover, DE Ponderosa, Wallula, WA