Steven Webster

Steven Webster Email and Phone Number

Project Manager at Costain Group PLC @ Costain Group PLC
maidenhead, royal borough of windsor and maidenhead, united kingdom
Steven Webster's Location
Morecambe, England, United Kingdom, United Kingdom
About Steven Webster

Steven Webster is a Project Manager at Costain Group PLC at Costain Group PLC.

Steven Webster's Current Company Details
Costain Group PLC

Costain Group Plc

View
Project Manager at Costain Group PLC
maidenhead, royal borough of windsor and maidenhead, united kingdom
Website:
costain.com
Employees:
3234
Steven Webster Work Experience Details
  • Costain Group Plc
    Project Manager
    Costain Group Plc Sep 2023 - Present
    Heysham, England, United Kingdom
    EDF frameworkProject management of security related projects
  • Costain Group Plc
    Construction Manager
    Costain Group Plc Sep 2019 - Sep 2023
    Preston, England, United Kingdom
    Preston Western Distributor Road (£160M) - 4.3km dual carriageway, 4km single carriageway, new junction on M55, 3 new junctions, 2 major viaducts & associated minor structuresStructures (£44M)3 steel/concrete deck bridges ﴾278m viaduct over navigable waterway/floodplain, 233m viaduct over electrified railway & navigable waterway & 45m bridge over M55﴿, 2 pre‐cast box culvert underpasses, a 30m span concrete beam bridge, a 50m long multiplate steel tubular underpass, a 30m span… Show more Preston Western Distributor Road (£160M) - 4.3km dual carriageway, 4km single carriageway, new junction on M55, 3 new junctions, 2 major viaducts & associated minor structuresStructures (£44M)3 steel/concrete deck bridges ﴾278m viaduct over navigable waterway/floodplain, 233m viaduct over electrified railway & navigable waterway & 45m bridge over M55﴿, 2 pre‐cast box culvert underpasses, a 30m span concrete beam bridge, a 50m long multiplate steel tubular underpass, a 30m span temporary bridge over navigable waterway & 9 no. gantriesPiling ﴾£5.7M﴿ - LDA polymer supported to 42m deep, 1200mm dia. in very challenging ground conditions within a floodplain with sub artesian water pressure. Completed with low height rigs working below/adjacent to 132 & 400KV overhead power lines & above 1200mm dia. live foul sewers. CFA to 28m deep,1050mm diameter adjacent to live electrified railway line. LDA contiguous to 20m deep,1500mm dia. adjacent to M55 3500t reinforcement fixed and 17,000m3 concrete placed with largest pour in excess of 1,000m3Sheetpiling - Up to 12m deep within 1m of electrified railway boundary & navigable waterways using leader rig & silent press techniquesStructural steel ﴾£11.4M﴿ - 5500t installed below/adjacent to 132KV/400KV overhead power lines, electrified rail line & motorway using a combination of SMPT's, 1200t mobile & 600t crawler cranesReinforced concrete ﴾£8.7M﴿ - Major structures including bridge abutments, piers and deck slabsSheetpiling - Up to 12m deep within 1m of electrified rail boundary & navigable waterways usingleader rig & silent press techniquesSelf delivery ﴾£10M﴿ - Earthworks up to 30,000m3 to create working platforms, haul roads piling/crane platforms, compound infrastructure, temporary bridges, pre‐cast bridge beam and box culvert installationsRoadworks (£62M) comprising:Earthworks ﴾£20M﴿, Drainage ﴾£10M﴿, Pavements ﴾£10M﴿, Traffic Management ﴾£5M﴿, Self delivery ﴾£5M) Show less
  • Costain Group Plc
    Construction Manager
    Costain Group Plc Nov 2017 - Sep 2019
    Preston, England, United Kingdom
    Preston Western Distributor Road (£160M)I led the structures team as part of the early contractor involvement phase of the Preston Western Distributor Road project. My primary role was to lead Costain’s team and the client’s design team and project stakeholders to develop the detailed design for all structures elements ensuring an efficient, safe and buildable design is achieved. I was responsible for addressing design issues, reviewing designs for buildability, opportunity and risk. I… Show more Preston Western Distributor Road (£160M)I led the structures team as part of the early contractor involvement phase of the Preston Western Distributor Road project. My primary role was to lead Costain’s team and the client’s design team and project stakeholders to develop the detailed design for all structures elements ensuring an efficient, safe and buildable design is achieved. I was responsible for addressing design issues, reviewing designs for buildability, opportunity and risk. I built the construction programme and preparing construction method documents to demonstrate how we will construct the structures once out on site to demonstrate how our target cost price is achieved. To ensure the pricing was as accurate as possible I undertook buildability reviews and use my knowledge of previous schemes to specify the temporary works requirements. I engaged with the wider supply chain to develop permanent and temporary works solutions before providing accurate pricing schedules for inclusion in our target cost budget. Show less
  • Costain Group Plc
    Construction Manager
    Costain Group Plc Feb 2016 - Nov 2017
    Heysham, England, United Kingdom
    Heysham to M6 Link Road (£123M)In addition to managing construction of all structures across the scheme I have been responsible for delivery of the remaining scope of the roadworks including statutory undertakers diversions, earthworks, surfacing, road formation, fencing, vehicle restraint barrier (concrete & steel), drainage, landscaping, signage, lighting, traffic signals. The project was successfully opened in October 2016 and I have continued to manage the close out of the project… Show more Heysham to M6 Link Road (£123M)In addition to managing construction of all structures across the scheme I have been responsible for delivery of the remaining scope of the roadworks including statutory undertakers diversions, earthworks, surfacing, road formation, fencing, vehicle restraint barrier (concrete & steel), drainage, landscaping, signage, lighting, traffic signals. The project was successfully opened in October 2016 and I have continued to manage the close out of the project including resolution of snags and defects along with handover of quality documentation to the client. Show less
  • Costain Group Plc
    Senior Site Agent
    Costain Group Plc Oct 2013 - Feb 2016
    Heysham, England, United Kingdom
    Heysham to M6 Link Road (£123M)I have managed the construction of all the structures across the length of the scheme with a value of £27M including 2 pre-cast concrete portal bridges, 2 concrete beam bridges, 6 composite steel and concrete deck bridges, a pre-cast concrete arch bridge, contiguous piled retaining walls and 3 no. gantries. During this period I have managed a team of 24 including 17 engineering staff and 7 supervisory staff. I have been package manager for a wide range of… Show more Heysham to M6 Link Road (£123M)I have managed the construction of all the structures across the length of the scheme with a value of £27M including 2 pre-cast concrete portal bridges, 2 concrete beam bridges, 6 composite steel and concrete deck bridges, a pre-cast concrete arch bridge, contiguous piled retaining walls and 3 no. gantries. During this period I have managed a team of 24 including 17 engineering staff and 7 supervisory staff. I have been package manager for a wide range of key supply chain partners both on and off site. This included disciplines such as structural steel, pre-cast concrete & reinforced soil wall design, fabrication and installation, in-situ reinforced concrete for major highways structures. Show less
  • Costain Group Plc
    Senior Site Agent
    Costain Group Plc Aug 2011 - Oct 2013
    Heysham, England, United Kingdom
    Heysham to M6 Link Road (£123M) - ECI PhaseI was responsible for the early liaison with all the key stakeholders and project partners to consider the effects on them that a project of this type would have and successfully worked with the client to progress the project through the Development Consent Order (DCO) application and target cost negotiations. I was introduced to the ECI team to identify buildability issues with the preliminary design and to develop solutions to enable a robust… Show more Heysham to M6 Link Road (£123M) - ECI PhaseI was responsible for the early liaison with all the key stakeholders and project partners to consider the effects on them that a project of this type would have and successfully worked with the client to progress the project through the Development Consent Order (DCO) application and target cost negotiations. I was introduced to the ECI team to identify buildability issues with the preliminary design and to develop solutions to enable a robust target cost to be agreed with a workable design. I was also involved with developing the temporary works solutions on many aspects of the scheme required to construct the structures which included crane & piling platforms, haul roads, cofferdams, shuttering, sheet piling retaining walls and detailed bridge sequencing for construction. I developed working methodologies to construct all the structures across the scheme in order to build up a target cost for each of them. I negotiated the issue of the flood defence consent by the Environment Agency for construction of a 210m long 4 span bridge over the River Lune. This included such diversity as flood relief, flood analysis in relation to the in river platform design, wildlife and invasive plant species along with working methods to minimise the risks of working adjacent to and over the major watercourse which spans 85m between piers on each bank. During the planning for a reinforced concrete bridge crossing the West Coast Railway Line I developed a relationship with Networks Rail in order to agree working methodologies to minimise the rail possessions required throughout the construction. I liaised with Network Rail and surveying teams to develop a remote track monitoring scheme to monitor the railway assets throughout the construction phase of the project. Show less
  • Costain Group Plc
    Site Agent
    Costain Group Plc Dec 2010 - Aug 2011
    Manchester, England, United Kingdom
    Manchester Airport Runway 1 refurbishment (£18.5M)The R1 Refurbishment Project had a value of £18.5m and a 12 month contract duration. The scheme involved an access track to Sub Stn. B, replacement of Substation B in a new location, new pit and duct system around perimeter of runway 1, new AGL system incorporating wiring and fittings, new approach lights (both ends 23R and 05L) - masts, foundations and pit and duct system, a 50mm plane off and re-lay over the full length (3km) of runway… Show more Manchester Airport Runway 1 refurbishment (£18.5M)The R1 Refurbishment Project had a value of £18.5m and a 12 month contract duration. The scheme involved an access track to Sub Stn. B, replacement of Substation B in a new location, new pit and duct system around perimeter of runway 1, new AGL system incorporating wiring and fittings, new approach lights (both ends 23R and 05L) - masts, foundations and pit and duct system, a 50mm plane off and re-lay over the full length (3km) of runway at a width of 45m. Taxiways were resurfaced up to a width of 15m up to the first stop bar, drainage repairs and delethalisation to existing pits in the verges. All works were undertaken during nightshift runway closures where the runway is required to be fully operational each morning.My role as night shift site agent on this job involved a lot of liaison with the airfield operations team and subcontractors to ensure that the works completed each night were in line with the airfield safety manual. I ensured any operational problems throughout the night were dealt with efficiently and handovers took place in the timescales set by the contract. I liaised with subcontractors to organise their work areas on a nightly basis so that airfield operations could continue to take place without hindrance in a controlled and organised manner. Show less
  • Costain Group Plc
    Site Agent
    Costain Group Plc Jun 2009 - Dec 2010
    Various AMP4 closedown projects
  • Costain Group Plc
    Site Agent
    Costain Group Plc Oct 2008 - Jun 2009
    Hazel Grove WwTW AMP4 Refurbishment (£4.8M)The contract comprised the design and construction of a new inlet works to replace the existing inlet works structures which have come to the end of their asset life and are no longer fit for purpose whilst the existing inlet works remains fully operational. In addition, the project scope addresses general repair and refurbishment of existing critical process units and structures.The scheme involved a large reinforced concrete structure… Show more Hazel Grove WwTW AMP4 Refurbishment (£4.8M)The contract comprised the design and construction of a new inlet works to replace the existing inlet works structures which have come to the end of their asset life and are no longer fit for purpose whilst the existing inlet works remains fully operational. In addition, the project scope addresses general repair and refurbishment of existing critical process units and structures.The scheme involved a large reinforced concrete structure and associated M & E equipment, connections to the existing inlet pipelines and demolition of the existing plant once the new scheme is fully commissioned. Construction also included a new PST distribution chamber, new site access roads and footpaths including lighting and drainage, provision of new power supply and launder pumping station.As senior site manager I had overall control of the site and reported directly to the Project DeliveryManager. The main challenges were building a new treatment plant offline in a confined working area and then maintaining flows in to the works whilst switching from the existing to the new facility and undertaking the many commissioning activities. Show less
  • Costain Group Plc
    Sub Agent
    Costain Group Plc Jul 2007 - Oct 2008
    Sale WwTW AMP4 Refurbishment (£17M)The contract comprised the design and construction of new structures and processes to replace existing ones in order to address compliance issues associated with the existing trickling filters. The new structures included three Final Tanks, 29m internal diameter along with associated inlet channels, Final Clarifier Distribution Chamber, new FBDA ASP including aeration, mixers, baffles, power and control system, RAS/SAS Pumping Stations and 3 No. Sludge… Show more Sale WwTW AMP4 Refurbishment (£17M)The contract comprised the design and construction of new structures and processes to replace existing ones in order to address compliance issues associated with the existing trickling filters. The new structures included three Final Tanks, 29m internal diameter along with associated inlet channels, Final Clarifier Distribution Chamber, new FBDA ASP including aeration, mixers, baffles, power and control system, RAS/SAS Pumping Stations and 3 No. Sludge Storage Tanks.The scheme involved a large number of reinforced concrete structures and associated M & E equipment, large diameter pipe work connections to the existing pumping station and new structures. It also includes modifications to existing High Level Pumping Station to transfer flows from existing trickling filters to proposed FBDA ASP including FBDA ASP Distribution Chamber, pipework and ancillaries. Construction of new final effluent washwater system including pumps, power, controls, valving, hydrants, kiosk and connection to existing system. Construction also included a FBDA ASP Control Building housing Air Blowers, control panels and laboratory, new site access roads including lighting and drainage, provision of new power supply, decommissioning of existing trickling filters, final tanks, wash water pumping station and sludge storage tank including landscaping of existing filters and final tank area using surplus excavated material.I reported to the on site Project Manager and was responsible for the management of the engineering team and subcontract management on site. Show less
  • Costain Group Plc
    Sub Agent
    Costain Group Plc Mar 2006 - Jul 2007
    Wigan WwTW Inlet Screens (£18.8M)The contract comprised the design and construction of a new inlet works plant that receives up to 408Ml flows from the Wigan area. The plant included coarse screens, a pump station, fine screens and detritors; together with channels to tie in to the existing works at the down and upstream ends.The scheme involved a large number of reinforced concrete structures and associated M & E equipment, large diameter connections to the existing inlet… Show more Wigan WwTW Inlet Screens (£18.8M)The contract comprised the design and construction of a new inlet works plant that receives up to 408Ml flows from the Wigan area. The plant included coarse screens, a pump station, fine screens and detritors; together with channels to tie in to the existing works at the down and upstream ends.The scheme involved a large number of reinforced concrete structures and associated M & E equipment, large diameter connections to the existing inlet pipeline and demolition of the existing plant once the new scheme is fully commissioned. Show less
  • Costain Group Plc
    Design Engineer
    Costain Group Plc Dec 2005 - Mar 2006
    Sale, England, United Kingdom
    Design Secondment at Jacobs BabtieDesigning reinforced concrete storm tanks and assisting the detailer produce drawings. Checking structural steelwork designs.
  • Costain Group Plc
    Senior Engineer
    Costain Group Plc Dec 2004 - Dec 2005
    Manchester Airport 5 Year Framework (£50M)The framework agreement was to carry out all civil engineering works on airports owned by the Manchester Airport Group Plc over a 5 year period and involved taxiway maintenance works and 70,000m2 of emergency taxiway overlays to ensure the ongoing operation of the airfield.
  • Costain Group Plc
    Senior Engineer
    Costain Group Plc Nov 2004 - Dec 2005
    Manchester Airport West Apron Phases 6A & 6BConstruction of a new 66,000m2 concrete paved apron for parking airbus A380 aircraft.
  • Costain Group Plc
    Design Engineer
    Costain Group Plc Sep 2004 - Dec 2004
    Design Secondment at Jacobs BabtieDesigning reinforced concrete storm tanks and assisting the detailer produce drawings. I aided the claims team in finding evidence to back up a claim against the contractor for costs incurred due to design changes/faults.
  • Costain Group Plc
    Senior Engineer
    Costain Group Plc Jun 2004 - Aug 2004
    Felixstowe, England, United Kingdom
    Trinity Terminal III Extension (£28M)The contract involved the design and construction of a 270m long extension to the existing deep water berth, together with approximately 15.1 hectares of paved container yard and associated services, berth access dredging, reclamation for the works and future onshore developments and the construction of environmental mitigation bunds.
  • Costain Group Plc
    Graduate Engineer
    Costain Group Plc Oct 2002 - May 2004
    Lostock, England, United Kingdom
    Lostock & Rivington WTW’s (£23M)The contract comprised the design and construction of a direct filtration plant, including chemical handling, chlorine contact tank and wash water treatment plant, new 35 MI capacity treated water reservoir and associated pumping stations at Lostock and new wash water clarifiers and a new pumping station at Rivington. Large diameter connections to the existing pipelines and reservoir and links to other works control systems are included.
  • Costain Group Plc
    Graduate Engineer
    Costain Group Plc Apr 2002 - Oct 2002
    Rochdale, England, United Kingdom
    Rochdale Canal M62 Crossing (£2M)Construction of approximately 600m of new canal including modification of existing lock, construction of a new lock with associated over-bridge, concrete channels, wash-walls, sewer diversions and new access roads. The new canal will be diverted through an existing sub-way that will restore the navigation that was severed by the construction of the M62 trans-Pennine motorway in the 1970’s.
  • Costain Group Plc
    Graduate Engineer
    Costain Group Plc Jul 2001 - Apr 2002
    Warrington, England, United Kingdom
    M62 Junction 8 (£20M)The widening of the M62 Motorway from dual 3 to dual 4 lane carriageways between a new grade separated junction 8 to be constructed just to the west of Burtonwood Motorway Services Area, and the existing Junction 9 at Winwick. In addition the construction of a new link road to the Gemini Retail Park, referred to as the Gemini Link Road.
  • Costain Group Plc
    Site Engineer
    Costain Group Plc Apr 2000 - Sep 2000
    Huddersfield, England, United Kingdom
    Grinding and Electricians Shops (£1.4M)Construction of a part single, part two storey new build industrial unit, associated services, drainage, external works and all ancillary works.The new building briefly comprised reinforced concrete ground beams and piled foundations with a ground floor slab, foul and surface water drainage systems along with external works comprising of the formation of access ramps, concrete paved areas and the construction of a large retaining wall up to… Show more Grinding and Electricians Shops (£1.4M)Construction of a part single, part two storey new build industrial unit, associated services, drainage, external works and all ancillary works.The new building briefly comprised reinforced concrete ground beams and piled foundations with a ground floor slab, foul and surface water drainage systems along with external works comprising of the formation of access ramps, concrete paved areas and the construction of a large retaining wall up to 8m high. It also included the installation of a service lift and overhead crane, a steel frame pre-cast suspended upper floor cladding to roof and external walls with brick and block external dado walls. There were new mechanical, electrical, plumbing and other services along with various internal finishings and builders work together with the installation of a service lift and overhead crane. Show less
  • Costain Group Plc
    Site Engineer
    Costain Group Plc Jun 1999 - Apr 2000
    Huddersfield, England, United Kingdom
    Huddersfield Narrow Canal – Sellers & Bates (£4.2M)The project objective was to remove canal blockages in Huddersfield town centre involving a 90m tunnel under an existing mill (Top down Contractor designed construction), 420m of cut & cover tunnel through a factory, also some 100m of deep open channel and construction of 2 new canal locks. All areas of work were subject to re-design in Value Engineering.

Frequently Asked Questions about Steven Webster

What company does Steven Webster work for?

Steven Webster works for Costain Group Plc

What is Steven Webster's role at the current company?

Steven Webster's current role is Project Manager at Costain Group PLC.

Who are Steven Webster's colleagues?

Steven Webster's colleagues are John Davies, Michelle Eames, John Woodgate Ceng, Rob Ross, Bea Larsen, John Barr, Svetoslav Georgiev.

Not the Steven Webster you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.