Sujeesh Narmat Email and Phone Number
Mechanical Engineering graduate with 10+ years of multi-disciplinary experience in Oil & Gas Project Management, Construction, Pre-Commissioning, Commissioning & Maintenance in Oil & Gas surface production facilities in the Middle East.Currently working as mechanical maintenance engineer for the Jurassic Production Facility at West Raudhatain (JPF3 WR), North Kuwait. The project value is $377 million and the facility handles 50MBOPD crude, 150MMSCFD sour gas, 12MBOPD effluent water and 200TPD sulfur. The facility was built in 2018 as a fast track project as skid mounted packages comprise of pumps (centrifugal, reciprocating and diaphragm types), reciprocating gas compressors, gas turbines, air cooled heat exchangers, air blowers, pressure vessels, shell and tube exchangers, boilers, catalytic reactors, RO/DM units, air and nitrogen generators, flares, incinerators, filters and piping. Oil & Gas career job role extended from construction of production facilities including static and rotating equipment installation, routed to project management and commissioning and reached to the maintenance of production facilities.Guided teams for construction supervision and early commissioning of 60MMSCFD Gas Sweetening Facility (GSF) in West Kuwait.Good engineering knowledge with a Bachelor of Technology degree in Mechanical Engineering.
Spetco International Petroleum Co.
View- Website:
- spetco.com
- Employees:
- 312
-
Mechanical Maintenance EngineerSpetco International Petroleum Co. Apr 2019 - PresentKuwait• Directs and coordinate mechanical maintenance activities in the facility• Prepare and implement Preventive Maintenance (PM) plan and lubrication program according to OEM maintenance manuals• Preparation of spare order forms and ensure sufficient inventory• Technical bid evaluation of orders• Budget evaluation, tracking and follow ups• Timely execute Corrective Maintenance (CM) to reduce down time• Record and maintain maintenance activities and readings in CMMS software (Maximo)• Perform predictive maintenance activities such as vibration analysis, lube oil analysis, borescope inspection etc.• Analysis of Mean Time to Failure (MTTF), Mean Time to Repair (MTR) of critical equipment• Maintain issue and action list of problems and continuously improve the facility • Perform Root Cause Analysis (RCA) of equipment failures • Perform MOCs (Management Of Change) • Actively participate in Process Safety Management (PSM) meetings and implement suggestions• Maintain Safety Critical Elements (SCE) on top priority• Coordinate, plan and execute plant preventive maintenance shutdowns• Coordinate vendor inspections• Coordinate integrity inspections of pressure vessels and piping• Participate in audits -
Mechanical Construction And Commissioning EngineerSpetco International Petroleum Co. Apr 2018 - Mar 2019Kuwait• Project engineering and construction• Technical Bid Evaluation of mechanical scope of work• Review project specifications and standards• Review material selection, project specifications, method statements, ITPs, GADs, Isometric drawings• Responsible for installation of process skids, piping and other static and rotating mechanical equipment• Coordinate construction activities related to piping & static and rotating mechanical equipment such as vessels, columns, filters, pumps, and air coolers. • Subcontract works authorization and monitoring. • NDE Follow ups. • Project progress monitoring and expediting. • Pre-commissioning and commissioning -
Mechanical EngineerXpo Technology May 2017 - Apr 2018Kuwait• Mechanical Engineer for installation, pre-commissioning & commissioning • Installation of process skid packages, piping and pre-commissioning. • NDE follow up• Perform leak testing of static equipment and piping. • Hydro blasting & cleaning • Coordinate flange tightening, bolt tensioning and torqueing • Preparation of work schedule (MS- Project)• Preparation of method statements and procedures. • Progress report preparations
-
Mechanical EngineerEast Pearl Technical Services May 2016 - May 2017Kuwait• Mechanical Engineer for structural & Piping works • Responsible for Structural & Piping shop fabrication for CFP (Clean Fuel Project), Kuwait for KNPC • Coordinate construction activities related to structural and piping works• Manpower & Equipment allocation and work execution• Preparation of work schedule (MS- Project)• Structural steel fabrication and painting • Modification of structural works• NDE follow ups• Report to project manager updating the progress of the project and further planning and scheduling• Client coordination for construction activities
-
Mechanical Project EngineerMark Technologies Co. Wll Feb 2013 - May 2016Kuwait• Responsible for planning and execution of site works of approved projects. • Manpower & Equipment allocation and work execution. • Preparation of work schedule (MS- Project). • Preparation of method statements and procedures. • Coordinating with worksite supervisors, QC engineers and inspectors. • Piping and structural construction and NDE follow ups. • Follow Health Safety & Environment (HSE) guidelines • Coordinating with different departments; civil, mechanical, electrical and instrumentation for the successful execution of the project. • Report to project manager updating the progress of the project and further planning and scheduling• Client coordination
-
Production EngineerTafe - Tractors And Farm Equipment Limited Jun 2011 - Sep 2012India• Identifying the areas for improvement in the shop floor and stores. • Implementing lean methods to improve the shop floor for the betterment of production by applying industrial engineering principles. • Work profile was more specific on the areas of 5S, Single piece flow and inventory control to eliminate or control the seven wastes and improves the workplace. • Executing projects in a systematic way clearly stating the benefits in the areas of Production, Quality, Cost, Delivery, Morale and Safety (PQCDMS) so that the management can review the project scope before starting the project and cross verify the result with the initial assumptions and hypothesis after the project execution. • Continue the projects keeping PDCA cycle in mind. • Time study analysis. • Part of continuous improvement team (kaizen). • Part of team in Implementing of fool proof system (poka yoke). • Working by forming cross functional team (CFT) for better results from Projects
Sujeesh Narmat Education Details
-
9.17/10
Frequently Asked Questions about Sujeesh Narmat
What company does Sujeesh Narmat work for?
Sujeesh Narmat works for Spetco International Petroleum Co.
What is Sujeesh Narmat's role at the current company?
Sujeesh Narmat's current role is Mechanical Engineer with experience in project management, construction, commissioning and maintenance of Build-Own-Operate-Maintain & Transfer Oil and Gas processing facilities.
What schools did Sujeesh Narmat attend?
Sujeesh Narmat attended Amrita Vishwa Vidyapeetham.
Who are Sujeesh Narmat's colleagues?
Sujeesh Narmat's colleagues are Soliman Soliman, Eng. Khaled Al-Huneidi, Hasan Homsi, Ahmed Samir, Bilju Joseph, Ahmed Gabr, Magdy Ghoniem.
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial