Sunil Kumar Shahi

Sunil Kumar Shahi Email and Phone Number

DGM Marine Services @
Sunil Kumar Shahi's Location
Mumbai, Maharashtra, India, India
About Sunil Kumar Shahi

With Diploma in Mechanical Engineering and having twenty four years of experience, I have been associated with Project Management & Project Execution both in Offshore as well as Onshore Projects. These Projects were turnkey type and of fast track nature, involving work related to Well head Platforms, Topside Modifications, Subsea spool tie-ins, Offshore pipe laying, Subsea Skid installation, Pre-commissioning of the system, Fabrication / Assly / Erection of steel structure, Bunkers, Hoppers, conveyer system for steel industry etc.

Sunil Kumar Shahi's Current Company Details
Larsen & Toubro Hydrocarbon

Larsen & Toubro Hydrocarbon

DGM Marine Services
Sunil Kumar Shahi Work Experience Details
  • Larsen & Toubro Hydrocarbon
    Dgm Marine Services
    Larsen & Toubro Hydrocarbon Jun 2024 - Present
    Mumbai, Maharashtra, India
  • Boskalis
    Project Engineer
    Boskalis Aug 2019 - Jan 2024
    United Arab Emirates
  • Nautic India Pvt Limited
    Operations Manager
    Nautic India Pvt Limited Dec 2016 - Aug 2019
    Mumbai Area, India
  • Dulam International Limited
    Project Engineer
    Dulam International Limited Jan 2012 - Nov 2016
    Dubai, United Arab Emirates
    Current Work profile includes; Analyzing the tender requirement & assist proposal team to prepare the tender plan and schedule for ITT received including tender clarification & qualifications.Prepare tender Method Statement, execution plan.Coordinate with internal tender process including liaison with various departments such as Procurement & Supply Chain Management, Engineering, Planning, QA/QC, and HSE.Prepare project schedule based on the scope of work, attend to Pre tender meeting, site visit etc and Post tender clarification.Liaise with subcontractors to develop feasible and economical installation solutions. Coordinating with sub-contractor / vendors for project deliverable. Offshore Installation / Tie-in of spool, riser & riser clamps, Pre & Post pipe lay pipeline sleeper for crossing locations, Free span corrections etc from DP2 II DSV.Pre-commissioning of pipelinesLiaising with TPI & client for engineering deliverable. Preparation of Time schedule in MS project (details schedule) considering available resources & project completion time.PROJECTS EXECUTEDNASR N4 SMR – Structural Modification & Repair for IOOC (Iranian Waters)32” & 4” Spool tie-in, Sleeper, Free span corrections & mattress for SPD 12A. 12B & 12C (IOEC South pars – Iranian waters).TASDID Spool Piece Tie-in including Free Span correction for Persian Gulf.Installation of Retrofit Anodes & Anode Sledge in Persian GulfInstallation of sacrificial anodes for platform & pipeline in Persian Gulf.Repair & pre commissioning of 30inch Export pipeline (Iran, Persian Gulf)
  • Mcnally Bharat Engineering Company Limited
    Asst Manager (Construction)
    Mcnally Bharat Engineering Company Limited Feb 2010 - Jan 2012
    Rourkela, Odhisa, India
    Looking after the fabrication / erection of approx 8000 MT of structural steel work for SAIL Stock House Blast Furnace Project for Rourkela Steel Plant (A Government of India undertaking).Looking after the fabrication / erection of approx 3000 MT of structural steel work for GAP (Green Anode Plant) Mahan Aluminum Project Hindalco.Working on the shortage of materials required at site based on the drawings released.Preparing monthly plans to meet the overall schedule / catch up plans to achieve the target completion date.Erection of building structure i.e. Columns, Beams, Cross Bracings, Chequre Plates etc for RSP, Sail (approx 12000 MT) including Galleries & Equipment etc.Assly / Erection of Bunkers, Hoppers, columns etc for the Stock House Project, BF#5, RSP Sail.Erection of Liners for both Bunkers & Hoppers for stock House Project.TPI & client inspection for the structures, bunkers, hoppers etc based on drawings available.Co-ordinating sub contractors for time delivery of project material & resources for on time completion of the project.PROJECTS EXECUTEDFabrication, Erection & Commissioning of Stock House Project for Blast Furnace #5 in Rourkela Steel Plant (SAIL)Fabrication, Erection & Commissioning of GAP (Green Anode Plant), Mahan for Hindalco.
  • Dulam International Limited
    Project Engineer
    Dulam International Limited Jun 2009 - Jan 2010
    Dubai, United Arab Emirates
    As Pre-Commissioning Engineer – Onshore / Offshore (Project Execution – Freelance)Job Description involved;Interface management between Client and Pre-commissioning sub contractor to carry out pre-commissioning of Infield pipelines (from permanent / temporary Launcher to permanent / temporary receiver) & 1 x 30 inch Gas Export Line (148 Km long).Preparation of pre-comm. schedule / look ahead of activities to be carried out offshore.Co-ordinating with offshore group to ensure timely supply of materials / various deliverables required for carrying out smooth operation and to meet the project deadline. Project ExecutedPre-commissioning of 30inch Export pipeline Salman-Sirri @approx 150km
  • Global Industries
    Project Engineer
    Global Industries 2007 - 2009
    India & Middle East
    Job Description during the tenure is as below;Executed pipe laying for the British Gas Project (Tapti field),Atlantis / RAK Gas, Saudi Aramco (Qatif & Berry Field) on DLB.Survey & correction of Free Spans for KJO (Kuwait Joint Operations Oil Company), Saudi Arabia on DP2 DSV.Pre-Installation survey of Seabed for Proposed Jackets.Pre-commissioning / hydro testing of 14” / 24” / 36” / 42” pipeline for RAK Gas commission / KJO (Kuwait Joint Operation Saudi Arabia)Involved in Subsea tie-in of spools/ Riser clamps, riser installation / Valve skid installation / Free Span corrections / crossings / pre-commissioning for Saudi Aramco Berri Water Injection & Qatif Crude pipeline project. Co-ordination with procurement department for project deliverables on to barge for Atlantis Project (RAK Gas commission)Co-ordination with Sub-contractor for manufacturing of Floatation buoys for the Beach Pull.Preparation of final As-Built report & carrying out customer satisfaction survey for the project executed.PROJECTS EXECUTEDBritish Gas (NRPOD), for British Gas (2007)Installation of 14” dia sub-sea pipeline from UAQ Platform to RAK Gas Plant for Atlantis Holdings, Norway.Berri & Qatif Pipeline Installation Project for Saudi Aramco.Al-Khafji Field Development – Phase I Project for KJO (Kuwait Joint Operations)
  • Clough Oil And Gas India Pvt Limited
    Project Engineer
    Clough Oil And Gas India Pvt Limited 2006 - 2007
    India
    Co-ordination with supervision of onshore Gas Plant.Co-ordination with erection sub contractors.Co-ordination with other related groups for the progress of the project and interacting with Clients for certification of Milestones of the Project.Keep track of the project materials.Co-ordination with the load-out contractor for pipes load-out.PROJECTS EXECUTED G1 – GS 15 Well Platforms Project (G1DP) for ONGCL (2006-07)NRPOD - Tapti Project for British Gas
  • Larsen & Toubro Limited
    Supervisor / Project Engineer
    Larsen & Toubro Limited Sep 1999 - Dec 2005
    Mumbai Area, India
    Construction supervision for fabrication of Jackets at L&T Hazira yard & abroad.Co-ordination with the Engineering & Procurement for in time availability of deliverables & materials at fabrication yard.Co-ordination with other related groups for the progress of the project.Reconciliation of Project materials (free issue).Coordination with installation contractor and incorporating the points to suit the installation of the same at Offshore.Clearance of final punch points given by client during offshore installation.Pre-commissioning of the pipelines.Involved in finalization of Change Order with Nippon Steel Batam.PROJECTS EXECUTED9 Well Platforms Project (9WPP), for ONGCL (2005)Banduq Gas Re-injection Project for Banduq Oil Company (2005)N9 – N10 Well Platform Project for ONGCL (2004)HGU and Utilities & Offsites Barauni Project (LSTK-4), worth US$ 99.8 M for IOCL (2001-2002)Clamp-on Related Modifications & Pipeline Project (CRMP-II), worth US$ 45.45 M for ONGCL (2000)DHDS and Utilities & Offsites Mathura Project, worth US$ 63 M for IOCL (1999)

Sunil Kumar Shahi Education Details

  • Larsen & Toubro Institute Of Technology
    Larsen & Toubro Institute Of Technology
    Mechanical
  • Montfort School Complex, Kansbahal, Orissa
    Montfort School Complex, Kansbahal, Orissa

Frequently Asked Questions about Sunil Kumar Shahi

What company does Sunil Kumar Shahi work for?

Sunil Kumar Shahi works for Larsen & Toubro Hydrocarbon

What is Sunil Kumar Shahi's role at the current company?

Sunil Kumar Shahi's current role is DGM Marine Services.

What schools did Sunil Kumar Shahi attend?

Sunil Kumar Shahi attended Larsen & Toubro Institute Of Technology, Montfort School Complex, Kansbahal, Orissa.

Not the Sunil Kumar Shahi you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.