Site Agent ( Project Manager )
Dubai, United Arab Emirates
Rehabilitation of four lane Expressway to Eight lane• Perform site works and assure safety in all construction activities.• Looking after the entire site activities like deploying my engineer's supervisors and foremen where and all is required as per the priority from the client and completing it within the scheduled timeframe meeting the QHSE requirements• Preparation of formation layers -255000 sq.m• Earthwork filling layer by layer approx. quantity of 1 lac 20 k m3• Clearing and grubbing – 2,55,000 sq.m• Laying of sub grade – 73 mm and down – 126,000 m3• Laying of sub Base – 200 mm in two layers 100mm each – 136000 m3• Laying of wet mix 200 mm thickness – 190,000 m3 • Application of prime coat – 350,000 sq.m• Laying of base course – 70 mm thickness and Area 408,000 sq.m• Laying of binder – 60 mm thickness and Area 408,000 sq.m• Laying of wearing course – 50 mm thickness and Area 408,000 sq.m• Getting the tender drawings approval from the client, consultant, DEWA, DM, RTA, DU, ETISALAT etc• Getting the shop drawing approvals from the client, consultant, DEWA, DM, RTA, DU, ETISALAT etc• Getting the As-built drawing approval from client, consultant, DEWA, DM, RTA, DU, ETISALAT etc• Following up with the suppliers, subcontractors for the materials so that there will not be any delay in completing the site activities within the time schedule.• Laying of the storm water duct as per the DM standard • INSTALLATION of the chamber for Etisalat, irrigation du, irrigation storm water.• Inspection and handing over from all the governing authorities