Consultancy Contract For Construction & Project Management
Chevron Nigeria Ltd ( Cnl) And Saipem Nigeria Ltd (Scnl)
Warri -Nigeria
The consultant of SupTec Solutions BV was responsible for the overall Project Management and organizational capability and cost control of project planning, engineering, construction, commissioning and too ensure the project is delivered safely, efficiently, within budget and in compliance with our client's ( Saipem and Chevron) policies, standards, regulations, and plans. Safety, visible leader of safety and incident free operations for work groups and Contractors. Undertake to produce cost effective Design, Procurement, Quality standards, and Construction and Operational activities. Maintaining communication links with all project partners and stakeholders. Management, supervision, of direct labour, contractors and sub contractors. To maintain and promote a seamless approach to resolving problems and achieving objectives within a team culture. Scope of Work: Oil and Gas Project Management and Construction Project, Structural, Mechanical, Piping, Civil, Prefabrication & Installation, Equipment ie Pumps, Turbine Generators, EER and Dredging works on site location. REFURSHIMENT AND REINSTALLATION OF OLERO WATER AND FLOW STATIONS IN OML 49 AND DREDGING WORK AND REINSTALLATION OF OLERO AND DIBI COMPRESSOR STATIONSThe scope reinstatement of the NFS, NWS and reinstatement of the ICP, addition of power generation and utilities on the NWS, and disconnecting further to the scope of work includes prefabrication/modification/installation, including structural and piping work, equipment installation (gas turbines), electrical and instrumentation work, hydro-testing and commissioning at NWDM Yard, Warri; dredging for access channel and sand pad repair, piling work, site preparation and tie-in, final commissioning and start-up at Olero in OML