Susi Muthusamy Email and Phone Number
Susi Muthusamy work email
- Valid
Susi Muthusamy personal email
- Valid
Achievement-oriented QAQC Engineer with 12 years of experiences in quality & project management, welding, and non-destructive testing. Involved in various EPCIC projects, plant construction, fabrication & maintenance of pressure vessels & boilers and plant maintenance and shutdown.Successfully delivered all the projects by adhering clients' and projects' specification within given timeline. Also, all the records and reports were compiled and submitted during Final Documentations as per contractual time frame. Worked hand in hand with project team to minimize cost incurred under Quality Department. Managed to save cost about 40% for Phased Array Ultrasonic Testing (PAUT) for Fabrication and Installation Economizer HP Boiler Project. Played active role in my current project whereby vendors eventually absorbed the cost for repairs for all the mechanical packages that failed to meet quality standards during FAT.Demonstrated leadership traits since high school. Held President and Vice President positions for Karate and Badminton Club respectively during High School and became President for Rotaract Club in University. These traits are still being practised until now where managing a team in current project.I always open to new skills and knowledge as I strongly believe KNOWLEDGE IS POWER. Love and respect humanity and nature.
Malaysia Marine & Heavy Engineering
View- Website:
- mmhe.com.my
- Employees:
- 1714
-
Qa EngineerMalaysia Marine & Heavy Engineering Jul 2023 - PresentPasir Gudang, Johore, Malaysia -
Quality Assurance EngineerPusb Engineering Sdn Bhd Apr 2022 - Oct 2023Miri, Sarawak, Malaysia -
Qc EngineerSapura Energy Berhad Aug 2018 - Jan 2022Lumut, Perak, Malaysia• Checked & analysed contract documents such as Invitation to Bid (ITB), Approved for Construction and other relevant documents.• Prepared and submitted Project Specific Procedures (PSP) on Quality to Project Management Team (PMT)• Prepared Inspection & Test Plant (ITP) by disciplines to client for approval prior to project commencement • Raised Site Technical Queries (STQ) pertaining to Quality issue and communicate with client for any discrepancies related to PSP• Issued, monitored, and closed all Non-Conformance Report (NCR) and Corrective Action Note (CRN)• Prepared report on inspection and testing activities which adhere to client/third party procedure and requirements.• Performed audit at vendor premises to verify and confirm equipment meet quality, project, and client standards.• Reviewed vendor documents to verify equipment and materials are delivered as per project requirements• Updated and maintained relevant reports for final documentation and audit purposes.• Made arrangement for equipment calibration, testing and repair by external party to maintain equipment functionality and accuracy• Monitored punch list status and ensure all items are completed prior to sail away• Conducted site surveillance and construction audit• Issued Quality Early Incident (QAE) and Cost of Poor Quality (CoPQ) and conduct Root Cause Analysis (RCA) for improvement purpose -
Qa/Qc EngineerBoiler Master Sdn Bhd Sep 2016 - Aug 2018Pasir Gudang, Johor, Malaysia• Prepared Inspection & Test Plant (ITP), DOSH proposal (fabrication & repair) and project procedures• Liaised with DOSH for fabrication& repair of boiler & pressure vessels, PMT and PMA registration and renewal• Conducted Welding Procedure Specification (WPS) and Welder Qualification Test (WQT) at workshop.• Performed material receiving, fit up, visual, tube expansion and final dimensional / final box up inspection as per ASME, ASME PCC, NBIC and client specifications.• Performed Dye Penetration Testing (DPT) and prepare reports accordingly• Reviewed sub-contractors' Radiographic Testing (RT) films• Performed Acoustic Eye (AE) inspection on internal tube and Positive Material Identification (PMI).• Witnessed Non-Destructive Testing (NDT) activities during execution such as DPT, MPI, UT and PAUT and review reports.• Witnessed leak test, hydrostatic and pneumatic test at workshop and field• Reviewed related vendor document• Assisted QA/QC manager in obtaining ISO 9001:2015 for company -
Qc EngineerSapurakencana Petroleum Berhad Mar 2014 - Jul 2016Lumut, Perak, Malaysia• Checked & analysed contract documents such as Invitation to Bid (ITB), Approved for Construction and other relevant documents.• Prepared and submitted Project Specific Procedures (PSP) on Quality to Project Management Team (PMT)• Prepared Inspection & Test Plant (ITP) by disciplines to client for approval prior to project commencement • Raised Site Technical Queries (STQ) pertaining to Quality issue and communicate with client for any discrepancies related to PSP• Issued, monitored, and closed all Non-Conformance Report (NCR) and Corrective Action Note (CRN)• Prepared report on inspection and testing activities which adhere to client/third party procedure and requirements.• Performed audit at vendor premises to verify and confirm equipment meet quality, project, and client standards.• Reviewed vendor documents to verify equipment and materials are delivered as per project requirements• Updated and maintained relevant reports for final documentation and audit purposes.• Made arrangement for equipment calibration, testing and repair by external party to maintain equipment functionality and accuracy• Monitored punch list status and ensure all items are completed prior to sail away• Conducted site surveillance and construction audit -
Qa/Qc EngineerSamsung Engineering Dec 2012 - Feb 2014Kimanis, Sabah• Responsible for QA/QC department deliverable for Final Document submission to owner, Petronas CariGali.• Managed construction punch lists and assisted Mechanical Completion (MC) team prior to startup of commissioning work• Conducted site surveillance and construction audit• Conducted audit on vendors verify and confirm equipment meet quality, project, and client standards.• Prepared and finalised Table of Content (TOC) for Final Documentation -
Equipment EngineerWd, A Western Digital Company Mar 2012 - Nov 2012Penang, Malaysia• Optimizing and continually improving head part operation• Develop and deliver solutions to improve equipment and process related metrology, tooling, materials and operations• Support Production/Process to meet scheduled target, yield improvement, machine down time improvement, and cost efficiency
Susi Muthusamy Skills
Susi Muthusamy Education Details
-
Swinburne University Of Technology (Sarawak Campus)3.19 Out Of 4.00
Frequently Asked Questions about Susi Muthusamy
What company does Susi Muthusamy work for?
Susi Muthusamy works for Malaysia Marine & Heavy Engineering
What is Susi Muthusamy's role at the current company?
Susi Muthusamy's current role is Quality Engineer.
What is Susi Muthusamy's email address?
Susi Muthusamy's email address is su****@****ana.com
What schools did Susi Muthusamy attend?
Susi Muthusamy attended Swinburne University Of Technology (Sarawak Campus).
What skills is Susi Muthusamy known for?
Susi Muthusamy has skills like Engineering, Autocad, Solidworks, Matlab, Quality Control, Mathematica, Manufacturing, Labview, Leadership, Windows, Metal Fabrication, Cad.
Who are Susi Muthusamy's colleagues?
Susi Muthusamy's colleagues are Emmanuel Y., Mohd (Mmhe), Naemah (Mmhe), Zaini Pardi, Ridzuan Ghazali, Ain Azan, Faiz Danish Mohamad Ali.
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial