Resident Engineer (Viaduct)
CurrentN111, Design, and Construction of North South Corridor (Tunnel & Viaduct) between Ang Mo Kio Ave 9 to Sungei Seletar. Client: LTA Singapore, Project value: S$537.1 Mn.Nature of work: Design and Construction of 1.28km twin cell box vehicular tunnel structures with 5 numbers of entry / exit slip roads, 1.11 km of vehicular viaduct structure including 345m at grade road, widening of the existing viaduct ramp, demolish part of existing viaduct ramp made redundant by new viaduct, Bored piling, Post tensioning, Precast beam launching, Balance cantilever segment bridge launching, sub & super structure works, Temporary Traffic Management (TTM) diversion.https://ssyenc.co.kr/en/business/overseas_view.asp?seq=842&menu=2&sub=2