Graduate Engineer
CurrentPower & Industrial Division Key Player in 3 successfully continuous project as Structural Engineer ensuring deliverables within timeline:● Conducted structural analysis and design for reinforced concrete (RC) and steel structures, ensuring compliance with industry standards (EC2 and BS) using Staad Pro, Limcon, and Tekla Tedds, enhancing project integrity and reducing redesign efforts by 15%.● Developed 3D models for power plant structures using Autodesk Revit and performed clash analysis in Navisworks, improving coordination across disciplines for 6 power plant structures across 3 projects.● Delivered 10+ calculation reports focusing on structural analysis and detailed drawings, which reduced review time by 30% and increased efficiency in the approval process.● Evaluated 8 types of structural damages, identified hazards, and recommended repair or reinforcement measures for proposals, contributing to 30% faster proposal submission times.● Managed technical specifications development for tendering on 2 projects, ensuring compliance with standards and client requirements.● Coordinated Local Authority Submissions for Building Plan (BP), ‘Kebenaran Merancang’ (KM), and Passive Fire Fighting (PFF), liaising with Majlis, Bomba, TNB, and UiDA to secure on-time approvals.● Led on-site inspections with authorities and managed submissions such as G-Form to BEM and Certificate of Completion and Compliance (CCC) documents, ensuring regulatory adherence and smooth project close-out.Projects: Nur Aurora Power Plant, Kulim | Sultan Abdul Halim Mu’adzam Shah Power Plant, Gurun | Tanjung Bin Power Plant, Tanjung Bin | Pulau Indah Power Plant, Klang