Syed Mustafa

Syed Mustafa Email and Phone Number

Approved PMC & EPCM Senior Electrical Construction Engineer by M/s. GASCO, M/s. SHELL & M/s. ADNOC, having 20 Years Experiences in Oil & Gas, Petrochemical, Fertilizer & Power Sector (On-shore). @
Syed Mustafa's Location
Habshan, Abu Dhabi Emirate, United Arab Emirates, United Arab Emirates
About Syed Mustafa

Syed Mustafa is an astute electrical engineering professional with experience in construction site management, project coordination, planning, scheduling, erection, commissioning, cable laying and equipment testing. He acquired excellent experience in managing the construction projects with respect to cost, resource deployment, productivity and manpower planning ensuring timely completion of projects. Well versed in design, engineering, site management, project status tracking, resource allocation & preparation of check lists and technical support. Adept at identifying improvement areas and implementing adequate measures to minimize breakdown by creating & implementing workflows to facilitate structured support in all areas and issues.Syed Mustafa is fully conversant with internationally adopted HSE/Safety norms, relevant engineering systems, procedures, practices and related regulatory provisions. He gained expertise in progress monitoring, supervision, quality assurance and system implementation on the construction site, ensuring smooth operations. Established performance benchmarks in providing professional engineering services in support of maintenance management, end to end project management, planning & scheduling, predictive & preventive maintenance, resource management, engineering / procurement activities of contractors, conducting technical & HSE audits for system compliance, etc.Syed's functional strengths are:★Syed has successfully accomplished various construction projects within the stringent time and budget lines, ensuring to meet organizational goals in internationally adopted health, safety and quality standards.★Syed holds a distinction in the installation and testing of power transformers (Up to 33 KV), Busduct, switchgears, numerical relay, drives, cables, earthing system, Lighting System, HV / LV Motor, Electrical Heat Tracing, Telephone system, Closed Circuit Television, Public Address System, sacrificial Anode type Cathodic protection.

Syed Mustafa's Current Company Details
China Petroleum Engineering & Construction Company

China Petroleum Engineering & Construction Company

Approved PMC & EPCM Senior Electrical Construction Engineer by M/s. GASCO, M/s. SHELL & M/s. ADNOC, having 20 Years Experiences in Oil & Gas, Petrochemical, Fertilizer & Power Sector (On-shore).
Syed Mustafa Work Experience Details
  • China Petroleum Engineering & Construction Company
    Senior Electrical Construction Engineer
    China Petroleum Engineering & Construction Company Oct 2024 - Present
    Abudhabi, Uae
    Approved Senior Electrical Engineer by ADNOC, for the Project of AiP5 (BAB).Resp[possibilities :1. Field Engineering.2. Tie-In Feeders Reservations & Finalization with ADNOC Operation team and Provide the reservation Tags on the Feeders which in under the AiP5 Project Scope.3. Pre-inspection of reserved feeders with OEM (Original Equipment Manufacturer) for the modification, Defective component replacement & healthiness checks.4. Obtain the Pre-Shutdown, Intermediate Shutdown & Shutdown Schedule from Client, accordingly Plan the OEM mobilization for the rectification or integration works during the shutdown.5. Witness the work carried out by IC (IMPLEMENTATION CONTRACTOR) against the RFI along with PMC and register the punch points & categorize the Punch point type and follow-up for punch close Closeout.6. Share the Road Map & Construction Integrated schedule with higher management highlighting the dates for the requirement of Engineering drawings deliverable & materials prior to one month before construction activities.7. Prepare & Review the Scope of Works related with different locations (Well Heads, Well bays, Mini- Pads, Main- Pads, Remote Degassing Station & Control Degassing Station.8. Supervision the Safety, Quality & Construction activities.
  • Mcdermott International, Ltd
    Senior Construction Specialist
    Mcdermott International, Ltd Sep 2021 - Sep 2024
    Haldia, West Bengal, India
    1. Well versed to formulate, manage, and review mandatory requirements of projects like Permit To Work, TRA/JSA (Task Risk Assessment), Method Statement, Work force (Personnel) Safety, Environmental Safety, Vendor & EPCC Contractor AFC Layouts/ drawings, Specification for HSE Management & TBT (Toolbox Talk) prior to construction work start-up till completion.2. Experienced in delivering End-to-End EPCC, EPCM & PMC Project service including Site Survey, Interface & Field Engineering, Installation, Testing, Pre-Commissioning, Commissioning, Operations & Maintenance. 2. Skilled in execution and installation of DC system (UPS & battery Banks), PMS, GIS, Telephone System, Closed Circuit Television, PA System & CP System. 3. Spearheaded vendors (VFD, Battery Charger, Battery Bank) during the Pre-Commissioning, Commissioning assistance with OEM, Start-up activities & Ensure Performance of the activities as per the Client Project Forms, IS, IEEE, IEC, EN & API.4. Worked with International Clients: Cairn-Energy, Basrah Gas Company (BCG), Shell, Wood PLC, GASCO, Borouge, Fertil & ADNOC.5. Successfully managed large capital electrical scope to the tune of 8 million USD with 250 Workforce from project conceptualization stage to project closure, managing project costing up to 337 MUSD.
  • Worley
    Electrical Construction Specialist - Iii
    Worley Jan 2020 - Aug 2021
    Barmer, Rajasthan, India
    1. HSE Policy & Procedure Compliance: Adhere to the CLIENT & CONTRACTOR’s HSE Policy, Procedures, Regulations, Objectives and ensuring that work performed is in compliance with HSES standard and norms.2. Field Engineering: Provide timely field inputs related to technical and construction expertise, along with Construction philosophies to the engineering department, also adhering to the execution time and costs.3. Supervision & Execution Control: Supervise the work of relevant discipline engineers & supervisors of EPC Contractors, ensuring that quality and safety standards are maintained & cost-effective solutions are adopted.4. Coordination Meetings: Coordinate and arrange meetings between Implementation Contractor (IC), EPCC Contractors, PMC and Clients to discuss weekly and monthly progress, technical query approvals (TQA), punch point closing, Final Mechanical Dossier submissions etc.5. Drawings Reviews & Lessons Learned Sharing: Review the OEM/Manufacturer (HV/MV/LV) Switchboards Schematic drawings, AFC Interconnection drawings & AFC Layouts (EPCC) and provide comments based-on Past lessons learned with the engineering department to minimize rework costs and enhance productivity.
  • Technipfmc
    Lead Electrical Construction Engineer
    Technipfmc Mar 2019 - Dec 2019
    Visakhapatnam, Andhra Pradesh, India
    1. Conducting audit of installations during construction, witness Factory and site acceptance tests (FAT & SAT) , pre-commissioning and commissioning of equipment / systems and assures that the installation / performance are in accordance with specifications.2. Partake & endorse the FAT (Factory Acceptance Test) for major electrical equipment.3. Following up with the EPC contractor construction planning and progress on daily basis.4. Supporting the effort of resolving the pending and punched items during project stages.5. Adhering the company HSE policy, procedures, regulations and objectives as they relate to area of responsibility and ensuring that work under control is performed in a safe and environmentally sound manner.6. Approving the IMIR / MAR of incoming materials which has been supplied by the contractor based on the approved QAP/ITP, TPI certificate & IRN.7. Supervising installation and testing of High Voltage (33 KV) Power & Distribution Transformers (Up to 31.5 MVA), HV/LV Busduct, (up to 33 KV) Switchgears, Numerical Relays, Control Relay Panels, VFD Drives, Cables, Earthing & Lightning Protection System, Lighting System and testing of LV / MV Motors (up to 15 MW) also conduct the solo run performance test and observe the electrical parameters such as: No Load Current, DE/NDE vibration (A, H, V), DE/NDE bearing temp, and speed.8. Ensuring safe, economic and technically sound decisions related to area of responsibility during the EPC phase.9. Providing on-site electrical engineering consultation during construction, pre-commissioning & commissioning stage and upload the Signed & Witnessed drawings/documents in CAMS [Completion Assurance Management System] documentary portal.10. Participating in: Training & development of assigned UAE national employees in the project & Key design reviews such as PHSER Audit, PSSR Audit, HAZID, HAZOP, Model reviews, SIMOPS.
  • China Petroleum Engineering & Construction Corporation (Cpecc)
    Lead Electrical Construction Engineer
    China Petroleum Engineering & Construction Corporation (Cpecc) Nov 2017 - Feb 2019
    Al Basra
    1. Vendor & Material Management: Attend meetings with vendors/OEMs along with the procurement/supply Management team to understand material Expected Date of Delivery Schedules (EDD), storage plans, and follow up with Approved TPI for IRN clearance during material dispatch.2. Compliance & Certification: Ensure materials supplied by VENDOR is meeting the area classifications/ATEX Certification, CIMFR, PESO, and statutory requirements of OISD, IS, IEC standards, and Client Engineering Specifications, AGES (General Engineering Specification), DEP (SHELL), Installation Standard prior to installation.3. Factory Acceptance Test (FAT): Participate & endorse the FAT for major Tagged Electrical Equipment & register punch points follow up with inspection Dept. for documents uploading in the (iDocs/Acconex) portal.4. Materials Inspection: Obtain approval from PMC/CLIENT for supplied materials on IMIR/MAR (Incoming Materials Inspection Report) based on Design Specification, ATEX Certification, approved QAP/ITP & IRN.5. Installation & Site Acceptance Test (SAT): Supervise the installation and testing of high voltage power transformers and Distribution transformers (up to 33 KV & up to 31.5 MVA), Oil Filtration, HV/MV bus duct (up to 6.6 KV), HV/MV Switchgears (Up to 33 KV) differential and stability tests, numerical relays, control relay panels, VFD drives, Cables, Earthing and lightning protection systems, lighting systems, and testing of LV/MV motors (up to 15 MW) & conduct solo run performance tests for 04 hours and observe electrical parameters (No Load Current, Vibration - DE & NDE, Temperature - DE & NDE, Speed.
  • Descon Integrated Projects Limited (Dipl)
    Senior Electrical Engineer
    Descon Integrated Projects Limited (Dipl) Sep 2014 - Oct 2017
    Abu Dhabi, United Arab Emirates
    1. Red-Line Mark-Up: Execute day to day site activities & ensure that works are carried out as per the latest revision of AFC drawings. Formulate changes based on suit at site conditions through redline mark-ups and obtain approval from the PMC/Client’s Technical Advisor (TA).2. Request for Field Inspection: Raise RFI (Request for Inspection) prior to PMC/CLIENT walk down for work Completion and register punch points given by PMC/CLIENT during walk down and maintain them in the master Punch point register & categories the punch point types (A, B & C) after had discussions with PMC/CLIENT. 3. Final As-Built Preparation: Share Red-Line Mark-ups (RLM) with the engineering department for Final As-Built Preparation & follow up with Document Controller for uploading in the documentary portal.4. Safety Drills & LOTO System: Conduct safety mock drills prior to substation energization, aligning with the HSE team, PMC team, Client Project team & Plant Operation team (END USER), Fire & Safety, and paramedic teams. Adhere to the LOTO system and maintain the Isolation & De-Isolation Certificate & LOTO register.5. Audits & Reviews: Arrange PHSER (Project, Health, Safety, Environmental Review), PSSR (Pre-Safety Start-Up), and RFSU (Ready for Start-up) audits & statutory Approvals. Participate in HAZID, HAZOP, and 3D model reviews (30%, 60%, and 90%) and close out all highlighted observations with tags. Conduct SIMOPS with all agencies.6. Subcontractor Management: Certify the Subcontractor’s monthly RA bills and review Subcontractor Extra Claims, change orders & deviations based on Engineering AFC Drawing Versus Execution Quantities and endorse the executed extra quantities for the preparation of SUB-CON’s Final Amendment.
  • Engineers India Limited
    Deputy Manager/ Senior Electrical Engineer
    Engineers India Limited Feb 2009 - Sep 2014
    Mangalore, Karnataka
    1. Involved in attending project review meetings for evaluating progress & resolving the areas of bottlenecks in coordination with the client and contractor. Implemented method statements and SAT by reviewing the documentation based on Design General Specification (DGS). 2. Responsible for estimating, managing, planning, and monitoring the electrical aspects of projects from start to finish and managing pre-con meetings to ensure successful handoff from estimating to the field. Planned and scheduled the jobs and day to day site activities by studying project plan, specifications and calculated time requirements while efficiently managing functions, including project financial and cost management.3. Efficiently managed the handover to end user by arranging End User integration, maintenance of new facilities and liquidation of electrical punch list along with project documentation to end User. I was responsible for installations and testing of HV, MCC, PCC, PMCC, LDB & ASB Switch Boards, Power and Distribution Transformers (Up to 31.5 MVA), HV / MV bus ducts, MV & LV VFDs and UPS, Battery bank, Battery Charger and DCDB. Resolved the bottlenecks and design issues, performed testing of LV / MV Motors up to 15 MW motors and instrumentally observed the NLC, vibration, bearing temp and speed.4. Tested the material supplied and followed-up with vendor for completion of the SAT for DC & UPS package system, VFD system and relay configuration for HV/LV switchboards. Followed up with the Account department for early settlements to ensure smooth work flow by verifying the measurement sheet and RA bills/invoices of the contractor. Ensured adherence to quality and safety related issues, OQA / NCR and OSA.
  • Reliance Industries Limited
    Electrical Testing Engineer
    Reliance Industries Limited Jul 2007 - Feb 2009
    Jamnagar, Gujarat, India
    1. I designed and implemented QC systems and procedures to minimize rejections and achieve highest quality standards. Defined operational parameters and ensured strict adherence thereto to generate maximum operational efficiency. Ensure safe working practices to prevent accidents, loss and injury as well as proper maintenance. Charted maintenance schedules for all instruments and closely monitored the maintenance activities, ensuring minimum operation free time, established plan for ensuring compliance to all HSE activities and practices.2. I was involved in testing MCC, PCC, PMCC and HT Switch Boards, POWER TRANSFORMER (Up to 31.5 MVA), Control transformer (415/230V) & Winding heating transformer (230/24V), HT [33KV] & LT bus ducts, UPS, Battery bank, Battery Charger, ACDB and DCDB, power [33 KV] and control cables along with field power panels and welding receptacles, power & lighting panels. I performed testing of 3RB-12 O/L & E/F relays, 7SJ 6111 Motor feeder relays, 7SJ 6112 Transformer feeder relays, 7SJ 64 O/C & E/F relays, 7RW 600 U/V & O/V relays, 7SD 610 Pilot wire protection relays, 7UT 612 Differential relays, Earth Leakage relays.
  • Kalpataru Power Transmission Limited
    Project Engineer
    Kalpataru Power Transmission Limited Apr 2004 - Jul 2007
    Kishanganj, Bihar, India
    1. I started my career as a Project Engineer, I was accountable for providing AFC drawings and vendor related documents/drawings to site on a timely basis for preparing Incoming Material Inspection Reports [IMIR], ensuring to expedite the site activities. Instrumentally planned pre-commissioning & commissioning activities of the electrical equipment’s for vendor mobilization. 2. Coordinated the Project Manager for reviewing Contractor quotations to ensure that only reasonable pricing is recommended for approval.

Syed Mustafa Skills

Public Address System Hse Management Systems Power Transformers Testing Project Scope Development Project Estimation Project Erection Equipment Maintenance Busduct Lighting System Project Engineering Project Scheduling Project Commissioning Hv Numerical Relay Equipment Installation Equipment Testing Electrical Heat Tracing Sacrificial Anode Type Cathodic Protection Regulatory Provisions Earthing System Drives Project Coordination Electrical Engineering Lv Motor Electrical Design Engineering Project Planning Telephone System Hseq Project Management Switchgear Cable Laying Construction Site Management Hse Auditing Closed Circuit Television

Syed Mustafa Education Details

  • Madurai Kamaraj University, Ramnad, Tamil Nadu, India
    Madurai Kamaraj University, Ramnad, Tamil Nadu, India
    Second Class

Frequently Asked Questions about Syed Mustafa

What company does Syed Mustafa work for?

Syed Mustafa works for China Petroleum Engineering & Construction Company

What is Syed Mustafa's role at the current company?

Syed Mustafa's current role is Approved PMC & EPCM Senior Electrical Construction Engineer by M/s. GASCO, M/s. SHELL & M/s. ADNOC, having 20 Years Experiences in Oil & Gas, Petrochemical, Fertilizer & Power Sector (On-shore)..

What schools did Syed Mustafa attend?

Syed Mustafa attended Madurai Kamaraj University, Ramnad, Tamil Nadu, India.

What skills is Syed Mustafa known for?

Syed Mustafa has skills like Public Address System, Hse Management Systems, Power Transformers Testing, Project Scope Development, Project Estimation, Project Erection, Equipment Maintenance, Busduct, Lighting System, Project Engineering, Project Scheduling, Project Commissioning.

Not the Syed Mustafa you were looking for?

  • Syed Mustafa

    Msc. Artificial Intelligence And Computer Science, University Of Birmingham Dubai
    Sharjah Emirate, United Arab Emirates
  • Syed Mustafa

    Application Development Technician @ Genworth | Bachelor Of Technology In Computer Engineering
    Dubai, United Arab Emirates
  • Syed Mustafa

    Business Development Manager
    Dubai, United Arab Emirates
  • Syed Mustafa

    Specialist - Custody Metering & Analyzer
    Ras Al-Khaimah, United Arab Emirates
    1
    rediffmail.com

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.