Tabish Hassan Email & Phone Number
Who is Tabish Hassan? Overview
A concise factual answer block for searchers comparing this professional profile.
Tabish Hassan is listed as Sr. Project Control Specialist_Nuclear at Sargent & Lundy, a with 4066 employees, based in Edmonton, Alberta, Canada. AeroLeads shows a matched LinkedIn profile for Tabish Hassan.
Tabish Hassan previously worked as Manager - Civil Works (Solar & Wind) at Borea Construction and Construction Specialist - (Heavy Civil, Mining, Tailings & Dykes) at Syncrude Canada Ltd.. Tabish Hassan holds Civil Engineering Technologist - Co-Op, Civil Engineering from Nait (Northern Alberta Institute Of Technology).
Email format at Sargent & Lundy
This section adds company-level context without repeating Tabish Hassan's masked contact details.
Review company-level records connected to Tabish Hassan before choosing the right outreach path.
About Tabish Hassan
Introduction: I bring 17 years of construction experience in management of engineered projects. I have strong background in Project Management, Costing, Scheduling and Site Management. Core Competencies: Communication: The ability to convey information clearly and effectively, both verbally and in writing. Teamwork: Collaborating well with others, showing respect for diverse perspectives, and contributing to a group effort. Adaptability: Being open to change and able to adjust to new conditions, tasks, or environments. Problem-Solving: The capacity to identify issues, analyze situations, and develop practical solutions. Emotional Intelligence: Understanding and managing your own emotions, as well as empathizing with others. Conflict Resolution: The ability to navigate disagreements and find mutually beneficial solutions. Time Management: Effectively managing one's time and prioritizing tasks to meet deadlines. Leadership: Guiding and inspiring others, taking initiative, and fostering a positive team environment. Creativity: Thinking outside the box and approaching problems in innovative ways. Work Ethic: Demonstrating dedication, reliability, and a commitment to quality in your work. Critical Thinking: Analyzing information objectively and making reasoned judgments. Networking: Building and maintaining professional relationships that can benefit career development.Education: P.L. (Eng.) – Association of Professional Engineers and Geoscientists of Alberta NCSO - ACSA; Safety Officer PMP - Project Management Professional, PMI Civil Engineering Technology (Co-op) – N.A.I.T, Edmonton (Sep 2004 – Nov 2007) B. Tech in Construction Management – B.C.I.T, Burnaby (Sep 2011 – Mar 2015) Journeyman – Steamfitter/PipefitterCertifications: Project Management Certificate, Keyano College Dale Carnegie Leadership Certificate Advanced Work Packaging & Work Face Planning, PICC Industrial Scheduling Planning Estimating Curriculum I & IIIndustry:Oil Sands Heavy Civil, Refinery Construction, Plant Maintenance, Solar, Wind, Highrise & Parkades
Tabish Hassan's current company
Company context helps verify the profile and gives searchers a useful next step.
Tabish Hassan work experience
A career timeline built from the work history available for this profile.
Manager - Civil Works (Solar & Wind)
Current> Hand Hills Wind Project consist of 29 wind turbines capable of generating 145 MW for Bluearth. > Michichi Solar Project at Drumheller, AB, consist of 25 MW of renewable energy for Capstone Infrastructure> Enterprise Solar Project at Vulcan, AB, consist of 97.5 MW of renewable energy for Pattern Energy> Vulcan Solar Project at Vulcan, AB, consist of 20 MW of renewable energy for Pattern Energy> Scope included; Environmental Monitoring, Roads, Piling, Pads, Access Roads, Intersections, Concrete Foundations, Solar panels, Collections, Substations, O&M Building, MET Tower, Turbine delivery & Installation and Commissioning
Construction Specialist - (Heavy Civil, Mining, Tailings & Dykes)
> Provided site leadership to general contractors in execution of projects related to mining, tailings, dyke’s construction, dredging & lake remediation, and Earth Dam-structure repair projects in Syncrude Base Plant.Projects: > Octo-Dam Bridge Demolition (2M), 2021 > Base Mine Dam Maintenance(1M), 2021 > North Mine Center Pit Dyke ($50M), 2019-2021 > Base Mine Lake Remediation & Dredging (R&D)($15M), 2020- 2021 > East West Tailings Dyke2, Syncrude Base Plant ($60M), 2019-2021 > Various Short term maintenance, winterization, and steam tracing projects
Sr. Manager (Heavy Civil- Concrete & Earthwork)
> As Senior Manager I confidently managed project portfolio worth $100 million while supervising workforce of 150 including MDM and Subcontractor employees and fulfilling roles of Site Manager, Project Manager, and Project Controls ManagerProjects:> Redwater Refinery- NWR Unit 50 & 60- Heavy Civil Scope ($40 Million)> Champion Pet Foods (ICI) - Gray & Keller, Acheson; 2017-2019 ($ 30 M) Complete Concrete Supply & Install 460,000 Sq. Ft Pet-food Kitchen facility; full complex: factory, foundation, warehouse, office building> Highrise & Parkade -Hat @ Five Corners- Cidex Development, Edmonton; 2018-2019 ($ 14 M) Complete Concrete Supply & Install of 4 Level Parkade & 25 floors tower including crane at Jasper Ave & 95 St> Senior Homes Complex- McKenzie House High Level; 2018 ($1 M) Complete Concrete Supply & Install 75,000 Sq. Ft, 2 Level, Foundations & Structural work> Parkade- Secord Apartment -Carlisle, Edmonton; 2018-2019- ($1M) Complete Supply & Install 80,000Sq. Ft Parkade> Parkade- James Apartment- Carlisle, Edmonton; 2018-2019 ($ 1.5 M) Complete Supply & Install 130,000Sq. Ft Parkade> Grand McEwan University, Edmonton; 2017 ($ 2 M) Complete Supply & Install of Vertical WorkScope Included:> Concrete Work (Flat Works, Vertical Works and Foundations):Precast MSE & Containment Wall, Foundation Walls, Retaining Walls, Concrete Foundation of Pump Stations, Pipe Rack Modules, Buildings, Process Modules, Tanks & Vessels, Compressors & Generator, Heat Exchanger, Tower Crane, Hammer Heads, Pile Caps, Grade Beams, Suspended Structural Slabs, Slab on Grade, etc> Earthwork & Underground Utilities:Site preparation, Site grading, Sumps, Gravel pads, Trenches, Roads Maintenance, Ramps, Precast Concrete Wall, Ponds, Specialized Containment Units, HDPE Liners, Dewatering, Catch Basin & Manhole installation, Bulk Excavation & Placements, Installation of E-House, Process Pump House, HDPE Pipes & Liners, Underground Electrical Utilities & Conduits.
Project Controls Lead
Projects:> Redwater Refinery- NWR Unit Gasifier> SHELL SCOTFFORD- UNIT 12, DEBOTTLENECKING AND PLANT SHUTDOWN, Scope:> Concrete & Foundation:Concrete Foundation of Pump Stations, Pipe Rack Modules, Buildings, Process Modules, Tanks & Vessels, Compressors & Generator, Heat Exchanger, Hammer Heads, > Process Piping and Equipment’s:Skids for Compressor, Boilers & Pump Stations, Above & Underground large bore, and small-bore carbon steel, stainless, chrome treated, HDPE, Plastic, and yellow Jacket pipes. Material management & requisition, fabrication, rigging, hoisting, tacking, welding, bolting, torquing, hydrotesting, reinstatement, etc. Install supports, guides, valves, gaskets & anchors, pumps, ventilations, electrical instrumentation, and control Systems.
Scheduling Specialist- Suncor Base Plant ( Shutdown & Demolition)
Suncor Base Plant Plant 52- Shutdown & Demolition ProjectScope: Pipe Rack Module, Skids for Compressor & Pump Stations carbon steel, stainless, chrome treated pipes, Install Supports, Guides, Valves, Gaskets & Anchors. Hydrotest, Reinstatement, Rigging, Demolition of Piping System and Hear Exchangers, Plant Maintenance
Project Manager (Heavy Civil & Mining) - Syncrude Aurora Mine
Contracts:- Aecon Group & Imperial Oil Contract - ($440 Million) @ Syncrude Aurora, 2010-2014Project:> Construction of Capital Roads-Mine Haul Road, Mine Access Ramps (15 km/year), 2010 -2013> Construction of Sumps, Ponds, Ditches and Dumps (LDD, Filtration, Contamination, Dyke, Settlement)- 2011- 2013> Continuous dewatering of Sumps, Ponds, Ditches, Roads, Ramps and Excavation pit, 2010-2014> Site Preparation, Site Grading and Pad Construction (Drill Pads, Shovel Pads, Crane Pads), 2010-2014> (AMR)Train 2 & 3Aurora Mine Relocation (Linear Discharge Ditch, Pads, Ramps, Site prep & grading), 2012-2013> (AMR)Train 2 & 3Aurora Mine Relocation-Stage 4 (AMR),2012-2013, (ESSO)Imperial Oil Resources/ ExxonMobil / Syncrude -Aurora, 2012-2013> (AMR) Installation of E-House & Process Water Pump House, 2013> (AMR)Demolition Brown Field Structures-2013> (AMR) Kentz: Process Hot Water Pump House,2012-2013> (AEPR) Train 1- MSE Wall Excavation and Ramp, 2010> Excavation of Filter Sand, Reclamation and Overburden material (10 million cubic meters/year), 2010-2013> Internal Drains Dyke Construction and bulk placement (10 million cubic meters), 2010- 2013> Installation of HDPE Pipe (8”, 12”, 18”, 22”) installation on Internal Drains Dyke (100 km/yr.), 2012- 2013> AIM-Aecon Improving Mining- Celarant Consulting, 2011, Aecon Internal Project> Syncrude System for Management, Highland Group, Syncrude
Project Coordinator - Cow Harbor Construction
Contracts:- Cow Harbor Construction & Imperial Oil Contract - ($440 Million) @ Syncrude Aurora, 2010-2014Projects: > AMR- Train 2&3 Aurora Mine Relocation, 2009- 2013 > AEPR - Aurora East Piller Relocation - Train 1 - Bulk Excavation, 2007- 2009 > AEPR- Aurora East Piller Relocation - Train 1 MSE Wall, 2007-2009 > Internal Drains Dyke, 2007 - 2013 > Demolition of Brownfield, 2013 > Sumps, Ponds, Ditches & Dewatering, 2007-2013 > Reclamation, 2007-2013 > Bulk Excavation and Pads, 2007-2013 > HDPE Pipeline, 2007-2013 > Filter sand Excavation, 2007-2013 > Shovel / Crane / Drill Pads, 2007-2013 > Site Grading and Pad Construction (Crane Pads, Lube Island) (1million cubic meters) -2009 > Installation of HDPE Pipe (12”) 2.5km- 2009 > Mine Access Ramps (various) > Haul Truck Maintenance Bay (Earth and Concrete)- 2008 > AEPR)Underground Electrical Utilities, Waterline, Conduit & Conduits (3km)- 2008 > (AEPR) Underground Electrical Utilities- Road Crossing- 2008 > (AEPR) Train 1 Relocation-MSE Wall (L:200m x H:20m x W:50m)– 2008-2009 > Tailing Pump House Installation-(ESSO)- ExxonMobil / Syncrude Base Plant, 2008-2009 > Installation of concrete piles and pipe racks-Tailings; 2008; Syncrude Base Plant > Overburden Removal- (15 million cubic meters)- 2007 -2013 > Haul Road- 12KM/Yr.- 2007-2013 > Folly’s Internal Drains Bulk Excavation-(10 Million Cubic Meter)- 2009
Field Engineer (Co-Op Student)
Implemented, monitored and controlled designing parameters, criteria’s and variables and made sound judgment in the execution of survey and CAD drafting work. I suggested design changes and applied engineering designing knowledge to layout, survey and field fit various survey worksProjects:> Eagle Ridge Sub-Division – 2006; City of Wood Buffalo; Fort McMurray, AB> Highway 63 Bypass & Rehabilitation – 2006; City of Wood Buffalo; Fort McMurray, AB> Water Treatment Facility– 2006; Bird Construction; Fort McMurray, AB> Landfill Access Road– 2006; City of Wood Buffalo; Fort McMurray, AB > Fort McKay Industrial Park– 2006; Fort MacKay; Fort McMurray, AB> Cree Burn Camp Site– 2006; Atco; Fort McMurray, AB> Tailing Pipes – 2006, OJ industrial, Fort McMurray, AB> Underground Utilities & Conduits– 2006; CNRL; Fort McMurray, AB
Field Engineer- Geo Tech (Co-Op Student)
• As engineering technologist, I provided construction Quality Assurance (QA)/Quality Control (QC) monitoring and inspection services providing independent verification of construction materials, methods, and results for conformance to the design using standardized test methods and procedures. • Supported advanced materials laboratories to perform acceptance testing of soil, aggregate, concrete, and asphalt materials. • Used systematic and standardized approach for measuring quality for inspection, testing, soil classification, geological boreholes drilling investigation, subsurface evaluation to formulate engineering recommendations in engineering and construction projects such as Highways, Buildings, Mining, Bridges, Infrastructure and MunicipalProjects:> Nordeg Bridge, Highway 11- 2005; Town of Rocky Mountain House, Red Deer, AB> Subdivision’s &Highway 2, 11 Project’s-2005; City of Red Deer, Red Deer, AB > Lacombe to Red Deer Water Pipeline- 2005; County of Lacombe, Red Deer, AB
Journeyperson
- Various plant and refinery construction as Pipefitter on various projects.
Colleagues at Sargent & Lundy
Other employees you can reach at sargentlundy.com. View company contacts for 4066 employees →
Scott Bloedorn
Colleague at Sargent & LundyNaperville, Illinois, United States
View →
RS
Rosa Sanchez
Colleague at Sargent & LundyChicago Heights, Illinois, United States
View →
ML
Mark Leutloff
Colleague at Sargent & LundyGreater Chicago Area, United States
View →
MM
Maaz Mubasher
Colleague at Sargent & LundyCanada
View →
PM
Patel Mehul
Colleague at Sargent & LundyVadodara, Gujarat, India
View →
G(
Gerald (Jerry) Winston
Colleague at Sargent & LundyGreater Chicago Area, United States
View →
JT
John Trevino
Colleague at Sargent & LundyWoodridge, Illinois, United States
View →
JJ
Jason Janicki, S.E.
Colleague at Sargent & LundyGreater Chicago Area, United States
View →
LL
Luke Linscott
Colleague at Sargent & LundyArlington Heights, Illinois, United States
View →
AS
Abu Seena
Colleague at Sargent & LundyChicago, Illinois, United States
View →
Tabish Hassan education
Civil Engineering Technologist - Co-Op, Civil Engineering
Bachelors Of Construction Management, Construction Management
Journeyman, Construction Trades
Frequently asked questions about Tabish Hassan
Quick answers generated from the profile data available on this page.
What company does Tabish Hassan work for?
Tabish Hassan works for Sargent & Lundy.
What is Tabish Hassan's role at Sargent & Lundy?
Tabish Hassan is listed as Sr. Project Control Specialist_Nuclear at Sargent & Lundy.
Where is Tabish Hassan based?
Tabish Hassan is based in Edmonton, Alberta, Canada while working with Sargent & Lundy.
What companies has Tabish Hassan worked for?
Tabish Hassan has worked for Sargent & Lundy, Borea Construction, Syncrude Canada Ltd., Mdm Foundation, and Jacobs Industrial Services.
Who are Tabish Hassan's colleagues at Sargent & Lundy?
Tabish Hassan's colleagues at Sargent & Lundy include Scott Bloedorn, Rosa Sanchez, Mark Leutloff, Maaz Mubasher, and Patel Mehul.
How can I contact Tabish Hassan?
You can use AeroLeads to view verified contact signals for Tabish Hassan at Sargent & Lundy, including work email, phone, and LinkedIn data when available.
What schools did Tabish Hassan attend?
Tabish Hassan holds Civil Engineering Technologist - Co-Op, Civil Engineering from Nait (Northern Alberta Institute Of Technology).
Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.
Start free trialCheck these profiles if this is not the Tabish Hassan you were looking for.
View similar profiles