Subsea Installation Engineer
CurrentShell GKGJE 4 | MY | Deepwater (WD=1200m)Installation of Flexible Flowlines, Jumpers, Umbilical, Production Manifold, and Flying Leads• Planning the execution of deepwater subsea structures installation (i.e. Production Manifold, Suction Pile, Mudmat, and Crossing Mattresses)• Participates in installation aids design to facilitate safe deployment during offshore campaign• Managed to optimize offshore installation sequence which significantly reduces Client’s production downtimeWoodside Xena 03 FEED Study | AUS | Shallow water (WD=180m)Installation of Flexible Jumpers, SDU, and Flying Leads• Performed dropped object assessment in which recommendations are made to minimize and eliminate risk of major incidents in the event of DO. Subsequently, the development field layout is optimized by planning subsea assets outside of potential drop zone.