Reservoir Engineering Advisor
Lead Engineer in exploitation & development of over 100,000 acres shale oil in Eagle Ford, La Salle County, and legacy tight gas fields in S. Texas Gulf Coast. Projects included oil well production type curves, well test interpretations, production forecasts, optimum well spacing study, economic evaluations, infill drillings, recompletions, workovers, budgeting and LRP.· Achieved peak production of 51 MBOPD, 109 MMCFGD & 650+ wells drilled from 2010 to 2016 as Lead Engineer to exploit & develop over 100,000 acres shale oil in Eagle Ford.· Delivered 350 MMBO and 700 BCFG of reserves to the company based on optimum well spacing of 40 acres.· Enhanced asset monetary value 250% by designing well test program of flowing, pressure build-up, and fluid sampling that changed development plan from gas/condensate to black oil and volatile oil.· Drilled 54 wells, added 43 BCFG net reserves and increased production by 73 MMCFGED with 96% success ratio and excellent economics in STX Vicksburg gas fields.