Accelerator Support Group Leader
CurrentAccelerator Support group leader - Managing a team of engineers and technicians to support FNAL’s accelerator magnet needs; mainly the repair of actively used, refurbishment of failed, design of new and maintaining a stockpile of spare inventory magnets.Other Work as Scientist at Fermilab:AUP/ LHC HiLumi Accelerator Upgrade Project - Deputy Manager II for the Q1/Q3 Cryo-Assembly Fabrication. The project goal is manufacturing 10 superconducting magnet quadrupole assemblies for the high energy LHC upgrade by 2028. Mu2e project - Design, development and prototyping of the Magnetic Field Mapper; Development of a test facility for precision Hall probe calibration; Design, develop and install the Cold Mass Position Monitor to measure how the magnets, cooled to 4.5 Kelvin, will move inside their cryostats.Oakridge STS & PPU - Project Lead for the Fermilab work scope for the Proton Power Upgrade (PPU) project and Second Target Station magnet, boutique designs that will be fabricated as contract work within the DOE complex.LCLS-II HE - Sponsor Office Technical Representative for superconducting SPQA magnet packagePIP2 - L4 Manager responsible for new magnets in the Booster (Orbump, CFM and Painting Magnets), the main injector (Gamma T-jump).Neutrino Physics Experiments - SBND, DUNE