Tim Gilchrist

Tim Gilchrist Email and Phone Number

Project Manager @ Veregy
phoenix, arizona, united states
Tim Gilchrist's Location
Denver, Colorado, United States, United States
Tim Gilchrist's Contact Details

Tim Gilchrist personal email

Tim Gilchrist phone numbers

About Tim Gilchrist

Dedicated professional committed to the reduction of costs while implementing the most applicable product for the job. Proficient in budget management, schedule management, buyout, bid instructions, BIM including Tekla and Revit, steel connection design, steel building design, concrete building design, and precast component design.

Tim Gilchrist's Current Company Details
Veregy

Veregy

View
Project Manager
phoenix, arizona, united states
Website:
veregy.com
Employees:
21
Tim Gilchrist Work Experience Details
  • Veregy
    Project Manager
    Veregy Dec 2022 - Present
  • Hyder Construction
    Project Manager
    Hyder Construction Nov 2020 - Oct 2021
    Denver, Colorado, United States
    Rivian Maintenance Facility (Denver, CO) – $2.4M 45,000 sqft TI, February 2021 – October 2021 o Managed and bought out pertinent subcontractors for extremely compressed schedule with lead times that were quoted as longer than full construction schedule o Worked with customer and landlord to provide alternative designs and materials to deliver facility on schedule o Worked with engineers and subcontractors to modify design to accommodate customer’s needs after original design was deemed unfit for the schedule dictated by landlordYork Street Yards (Denver, CO) – $11.4M 135,000 sqft Flex Space TI, November 2020 – October 2021 o Researched various methods for providing temporary and permanent utilities to an existing building that would be split in half to create two stand-alone facilities o Managed coordination with local utilities and Denver Fire Department to efficiently schedule construction while keeping existing building and “new” building operational throughout construction o Adapted schedule as needed to save time on construction when unforeseen circumstances were discovered while demolishing 85 year old interiors
  • Hyder Construction
    Assistant Project Manager
    Hyder Construction Mar 2020 - Nov 2020
    Denver, Colorado, United States
    Lone Rock Retreat (Bailey, CO) – $4.5M Utility Project for Teacher’s Retreat, March 2020 – January 2021 o Acted as project manager, superintendent, and project engineer for force main, lift station, and well/water treatment facility o Force Main consisted of (2) pipes extending 9,300’ with 15 underground maintenance facilities/cleanouts through mountainous and rocky terrain. Pipes were required to be directionally drilled through rock at a minimum depth of 8’ connecting with precise locations of clean outs and cross connection vaults o Lift Station was designed to serve as a catch basin for all sewage developed by the compound as well as utilize the force main to dispose of sewage into existing treatment facility 2 miles away in a separate community. Assisted engineers in redesign of pumping equipment due to 16 week lead times of pumps o Water Purification/Treatment Center utilized existing wells to pump ground water up 400’ in elevation to 125,000 gallon tank connected to a purification system. Spent excessive time reviewing drawings and design while finding flaws that required modification of facility due to fire safety concerns of compound.
  • Arco/Murray
    Project Manager
    Arco/Murray Feb 2018 - Jan 2020
    Greater Denver Area
    iFLY Jacksonville (Jacksonville, FL) – $12.5M 10,000 sqft Retail, February 2018 – January 2019 o Successfully led full design/build project at 11.2% profit and retained a repeat customer for future iFLY’s after receiving Certificate of Occupancy one month in advance of promised contract date o Fully bought out and managed all trades with coordination of iFLY proprietary equipment install o Managed budget, schedule, and submittals as well as all invoicing and billings throughout projectiFLY Las Vegas (Las Vegas, NV) – $13.5M, 10,000 sqft Retail, January 2019 – January 2020 o Developed conceptual renderings and due diligence reports for various locations of facility to inform customer on site selection and utility cost implications of specific sites o Led preconstruction and entitlement effort including building design, civil design, and technical drainage study as well as offsite utility studies with coordination of local jurisdictions, building department, and fire marshal o Ran cost benefit analysis for 2,500 ft offsite domestic water line versus deep well with 180,000 gal fire storage tankPersonal Warehouse (Boerne, TX) – $7.2M 32,000 light industrial complex, May 2019 – January 2020 o Overhauled existing civil and utility design resulting in over $800,000 in savings for new customer o Led design effort for architecture, MEP, and structural to create the most efficient and replicable product to scale to 10 facilities per year as a repeat customer
  • Fortis Structural, Llc
    Design Engineer
    Fortis Structural, Llc Aug 2016 - Feb 2018
    United States
    Foundry Parking Garage (Loveland, CO) – 6 Story Precast Parking Garage o Led design, project management, and coordination between EOR and fabricator and updated precast designs to allow for more efficient time management of fabrication and erection scheduling9CO7E (Denver, CO) – 9 story residential building built with Infinity bearing wall system and Epicore deck o Designed Epicore MSR deck with reinforcing and supporting slab beams throughout entire structure o Designed steel amenity area for cantilevered exterior sun deck and leasing office belowDenver Housing Authority Central Office (Denver, CO) – 170,000 GSF Commercial Office Building o Designed and coordinated AESS feature stair with cantilevered framing
  • Thornton Tomasetti
    Senior Structural Engineer
    Thornton Tomasetti Jun 2013 - May 2016
    Greater Denver Area
    30 Hudson Yards (New York City, NY) – 1,296 foot tall commercial office building with attached 10 story retail o Led steel connections design team for building crown including bracing, diagrid, and façade support o Contributed to the development of standard connections and associated calculations to facilitate the reduction of man-hours needed for designing repeating connectionsGaylord of the Rockies (Denver, CO) – 485,000 GSF, 1,500 room resort and convention center o Designed end plated steel truss and bracing connections for architecturally driven roof supportHotel Born (Denver, CO) – 12 Story, 200 room concrete hotel with attached 6 story office building o Designed parking slabs, concrete garage ramps, and basement retaining walls for parking structureRogers Place (Edmonton, Canada) – 18,641 capacity ice arena for the Edmonton Oilers hockey team o Designed steel framing and truss framing for the marquee Wintergarden pedestrian bridge entrance
  • Colorado School Of Mines
    Research Assistant
    Colorado School Of Mines Jun 2012 - May 2014
    Colorado School Of Mines
    In my second year of graduate school I was brought on as a research Assistant for Dr. Panos Kiousis on a driven pile slope-stability project for Colorado Department of Transportation. For this study, I investigated the feasibility of using pile driven HP sections for slope reinforcements by recreating soil conditions using LS-Dyna and parametrically changing design to find most effective solution to reinforce the mountain road surface.
  • Zachry Engineering
    Civil And Structural Engineering Intern
    Zachry Engineering May 2012 - Aug 2012
    Greater Denver Area
    o Designed and modeled foundations for preliminary designs for Louisville Gas and Electric power plant. o Assisted in the structural steel design as well as the design of steel connections for coal fired power plants. o Helped develop the design basis for the loading criteria on various structures including seismic, wind, and ice loading.
  • Halliburton Energy Services Inc
    Associate Technical Professional
    Halliburton Energy Services Inc Nov 2007 - May 2010
    o Led extensive research on solutions for surface gas pressure in Denver-Julesburg Basin and helped customers move towards resolution of problems. Used implementation of new cement blends and spacer systems that allow for the best possible product for customer's wells including horizontal, liner, deviated, and remedial wells in line with Halliburton's Best Practices.o Presented and developed training seminars for customers to introduce new design technology to optimize cement job designs. Determined pricing of products so customers could receive cost-effective as well as technologically advanced cement, spacer, and centralizer designs for development of AFE's.o Created work methods for Halliburton cementing to normalize operations and minimize COPQ. Managed cement lab tests and scheduling of lab technicians to most effectively manage time while still ensuring service quality and establishing Halliburton as a solutions provider in the Denver- Julesburg and Raton Basins.o Researched and developed new technology through substantial lab and field testing thus creating extremely lightweight (6 lb/gal) cement to reduce failure of primary cement and eliminate costs of remedial work in low fracture gradient areas. o Designed centralizer programs to optimize standoff while minimizing drag of running casing and attained knowledge of casing pipe tally, burst pressure, tensile strength, and threading. Gained expertise of mud and interaction versus compatibility of mud with spacers and cements.
  • Parsons And Brinckerhoff
    Engineering Aide Ii
    Parsons And Brinckerhoff Jul 2006 - May 2007
    o Participated in the engineering design and development of MBTA Stations and helped manage the budget.o Assisted with the structural design of the facilities, created STAAD files for structural design, checked structural design and calculations, checked and measured distances on drawings, and plotted distances between platforms and changeovers in tunnels.

Tim Gilchrist Skills

Structural Engineering Engineering Steel Concrete Structural Analysis Gas Construction Geotechnical Engineering Staad Mathcad Geology Mathematics Risa Ls Dyna Finite Element Analysis Engineering Design Cement Mathematical Modeling Slope Stability Microsoft Office Civil Engineering Timber Structures Masonry Reinforced Concrete

Tim Gilchrist Education Details

Frequently Asked Questions about Tim Gilchrist

What company does Tim Gilchrist work for?

Tim Gilchrist works for Veregy

What is Tim Gilchrist's role at the current company?

Tim Gilchrist's current role is Project Manager.

What is Tim Gilchrist's email address?

Tim Gilchrist's email address is tg****@****inc.com

What is Tim Gilchrist's direct phone number?

Tim Gilchrist's direct phone number is +172059*****

What schools did Tim Gilchrist attend?

Tim Gilchrist attended Colorado School Of Mines, Boston College, Halliburton Technical Training Program, Boston College, Boston College, Boston College, Boston College.

What skills is Tim Gilchrist known for?

Tim Gilchrist has skills like Structural Engineering, Engineering, Steel, Concrete, Structural Analysis, Gas, Construction, Geotechnical Engineering, Staad, Mathcad, Geology, Mathematics.

Who are Tim Gilchrist's colleagues?

Tim Gilchrist's colleagues are Ashley Cornwell, Gina Bicknese, Branden Morhous, Lisa Schultz, Cdmp, Pcm-Dm, Adam V., Felicia Wilburn, Cpsm, Cdmp, Pcm-Dm, Adam Grubb.

Not the Tim Gilchrist you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.