I am a hands-on senior manager with extensive experience in large-scale projects. My expertise covers the following technologies:• Power Generation (Natural-gas-fired Combined Cycle, Simple Cycle; coal and petroleum coke-fired Fluid Bed Boilers; Hydrogen (H2) fuel cell, PV Solar• Petrochemical Plants: Synthetic Ammonia; H2 production plant using an Article-1 fuel cell technology; Direct Reduction of Iron Ore using reduction gas generated by steam/methane reformation• Natural Gas Separation and fractional distillation of C2+ hydrocarbons• Air Separation Plants• Direct Iron Ore Reduction Plants• CO2 and Acid Gas Removal Systems• District Heater and Refrigeration Systems• Raw Water Treatment and Waste Water Treatment FacilitiesDomestic and International large-scale industrial EPC endeavors and have enjoyed resident employment in twelve (12) foreign countries.

Tony Franks's Current Company Details

Consultant
Tony Franks Work Experience Details
  • Fuel Cell Energy, Inc
    Senior Commissioning Engineer
    Fuel Cell Energy, Inc Feb 2022 - Jan 2024
    Long Beach, California, United States
    Article-1 Fuel Cell Hydrogen Plant, Power Generation, High Purity Water productionDeveloped detailed commissioning schedule; Scoped P&IDs and One-Line drawings by turnover system; managed the development of mechanical, electrical, and I&C commissioning procedures; developed subcontract and vendor support plan,; hired the commissioning personnel, developed equipment preservation plans; managed day-to-day commissioning and start-up activities.
  • Fuel Cell Energy - Trigen Project
    Lead Commissioning Engineer
    Fuel Cell Energy - Trigen Project Jan 2022 - Jan 2024
    Long Beach, California
    Generation of transportation grade H2, power, and water by utilizing Article-1 Fuel Cell Energy technology
  • Vista Energy Lp
    Partner
    Vista Energy Lp 2007 - Feb 2022
    Vista Energy Vista Energy was formed in 1Q of 2007 by combining resources with Universal Technical Services, Inc., which had been in service since 1998. Our core business is to provide Management and Technical services to the energy business at large, such as: Power Plants (Conventional Coal & IGCC, Combined Cycle, Solar, Wind), Petrochemicals, Oil & Gas, LNG, Alternative Fuels, Pipelines.The type of Services we offfer are:• Project Managers• Construction Managers and Management Teams• Project Controls personnel, including Cost and Scheduling• Project Due Diligence• Field Engineering• Procurement and Contracts Management• Commissioning and Startup• O&M Support • EHS Services• Technical Writing
  • Vista Energy On Contract With Aei Energy
    Project Manager For Owner
    Vista Energy On Contract With Aei Energy 2011 - 2012
    South Of Esquintla, Guatemala
    Jaguar Power Guatemala S.A. 300 MW CFB Power Plant EPC due diligence and EPC project management and Owner’s Representative team for this 300 MW (2 x 150 MW) coal and petroleum coke fired circulating fluid bed boiler (CFB), being executed by a Chinese subcontractor.The facility consists of two (2) CFB boilers by China Western Industrial Company and two (2) steam turbine generators by Harbin Turbine Company and Harbin Generator Company. All engineering and equipment manufacture was performed in China and meets a mixture of U.S. and Chinese codes and standards.
  • Universal Technical Services
    Founder / Owner
    Universal Technical Services Jan 1997 - Mar 2007
    Worldwide Services
    Provided elite commissioning management services and personnel to clients in the Large-scales power generation sector:1. 125 MW GE LM6000 cogneration plant Sri Racha, Thailand - Nepco (Commissioning Manager)2. 6X80 MW GE7EA simple cycle power Caledonia, Mississippi - Enron (Commissioning Manager)3. 2x840 MW GE-9FA combined cycle power Dabhol, India - Enron, Bechtel, GE (Commissioning Manager)4. 4x550 MW GE7FA combined cycle power El Dorado, Arkansas - NEPCO/SNC Lavalin - (Commissioning Manager)5. 2x1100 MW GE7FA combined cycle Lawrenceburg, Indiana - PSEG - (Owner's Representative)6. 3x1 750 MW GE7FA combined cycle power plant Bethlehem, New Your - PSEG (Commissioning Manager)7. 2x550 MW GE7FA cogeneration plant Becancour, Quebec, Canada - SNC Lavalin (Commissioning Manager)
  • Pseg Albany - Bethlehem Energy Center
    Commissioning Manager
    Pseg Albany - Bethlehem Energy Center 2004 - 2005
    Albany, New York, United States
    Commission Manager 3X1 combined cycle power plant: GE 7FA combustion turbines, 250 MW GE D-11 Steam Turbine, Nooter Ericksen HRSG: Schedule development in P6, Commissioning Plans, Systems Turnover, day-to-day direction of all commissioning activities.
  • Snc Lavalin
    Commissioning Manager
    Snc Lavalin 2001 - 2003
    El Dorado, Arkansas, United States
    Commissioning and Start-Up Manager of 4x550 MW Combined Cycle Power Plant consisting of eight GE 7FA Combustion Turbines Generators, four GE D-11 Steam Turbine Generators, eight Indec HRSGs.Developed P3 commissioning and start-up schedule, systems turnover from Construction and then to Owner, managed final punch list, managed day-to-day commissioning activities.
  • Enron
    Commissioning Manager
    Enron 2000 - 2003
    Dabhol, Maharashtra, India
    Dabhol Power Project Phase IIThe Project was a 1680 MW Combined Cycle power plant, comprising two (2) 2X1 power blocks, in a joint venture between Enron Engineering & Construction Company, Bechtel International Corporation, and General Electric Company. Phase II expanded the existing 800MW Facility already in commercial operation. The Facility comprised four (4) GE 9FA gas turbine generators, capable of firing naphtha, distillate and natural gas, four (4) Kawasaki Heavy Industries (KHI) HRSGs, licensed by Voigt, two (2) GE D-11 330 MW steam turbine generators, Foxboro IA DCS, Aquatech demineralizer and raw water treatment plant, ABB 400kV switchyard, with breaker and a half scheme.Responsibilities included management of 60 commissioning and startup engineers, technicians, and support staff. The task also included managing 300 craft and vendor support personnel, the development of BOP Operator training program for 25 O&M staff, development of a detailed startup budget and schedule (USD 25 million) and the integration into the master project schedule, formulation and implementation of the subcontracting plan, coordination of startup vendor support, development and implementation of systems functionality checkout procedures, management of the commercial and technical aspects of commissioning, and startup of two power blocks, simultaneously. Developed a long-term lay-up plan for the Facility when the Project terminated due to a lack of contractual payments by the Owner. The Project was 98.5% complete at the time of termination.
  • Toyo Engineering & Construction Sdn Bhd
    Head Of Specialists
    Toyo Engineering & Construction Sdn Bhd 1995 - 1997
    Kertih, Terengganu, Malaysia
    Petronas Gas Sendiran Berhad (PGSB) Cryogenic Gas Processing PlantResponsible for leading and managing a team of 12 engineers who provided technical assistance to Petronas Gas Berhad Operations and Maintenance teams at Gas Processing Complex 1 at Kerteh, Malaysia, situated on the east coast of Peninsular Malaysia.The complex consisted of four (4) 250 MMSCFD Gas Processing Plants and one (1) 250 MMSCFD Dewpoint Control Unit (DPCU), for a combined sales gas production of 1,250 MMSCFD plus the capture of associated natural gas liquids. Except for the DPCU units located in the No. 1 and No. 2 plants, the two (2) other plants were equipped with Product Recovery units (C2, C3, C4 & C5+). Three (3) of the plants included Benfield Acid Gas Removal Units (AGRU), with the ability to operate in ethane or propane recovery modes. Three (3) of the gas processing plants were supported by independent, “stand-alone” utility facilities complete with an integrated steam system, demineralization water plant, open recirculation cooling water system, instrument/service air system, and stabilized hydrocarbon condensate storage. Inert gas was provided by one (1) air separation plant and two (2) inert gas generators.
  • Stone And Webster
    Commissioning Supervisor At Pgsb Gas Plant 2
    Stone And Webster 1992 - 1994
    Kertih, Terengganu, Malaysia
    Chief Commissioning Supervisor250 MMSCFD Natural Gas Processing Plant for PGSBToyo Engineering Corporation provided the process design from which Stone & Webster Engineering Corporation and Hyundai Engineering Corporation collaborated on the EPC of the Facility.The Project consisted of a pre-treatment filtration and water liquids separation section, acid gas removal, dehydration systems, low-temperature separation section with cold boxes and demethanizer, a natural gas liquids plant for product recovery unit equipped with a deethanizer, depropanizer, and debutanizer, and a condensate stripper. Other unique features of the Facility included a Benfield Acid Gas Removal Unit, Solar Gas Turbines coupled to Mitsubishi centrifugal Gas Compressors, Air Products air separation plant, open recirculation cooling water systems, demineralizer units, and two (2) 40TPH package boilers. Responsibilities included directing and supervising all field commissioning and startup activities of the No. 2 Gas Processing Plant and utilities and offsites areas. I also coordinated the completion of Final Acceptance punch list work, troubleshooting operations problems, and training PGSB operations personnel.
  • Mw Kellogg Houston
    Commissioning Supervisor
    Mw Kellogg Houston Jan 1984 - Oct 1987
    1. Commissioning and Startup 1500 Metric TPD Kellogg Ammonia Plant including utilities, ammonia storage and loading dock, and offsites. Kaltim II Kalimantan, Indonesia. (Shift Commissioning Engineer)2. Commissioning and Startup 2x1300 Metric TPD Kellogg Ammonia Plants in Hazira, Gujurat, India (lead Shift Commissioning Engineer)3. Commissioning and Startup 1x1100 Metric TPD Kellogg Ammonia Plant including utilities, ammonia storage and transfer system, offsites. Onne, Rivers State, Nigeria (Shift Supervisor)

Tony Franks Skills

Power Plants Epc Energy Commissioning Gas Petrochemical Power Generation Engineering Inspection Petroleum Project Engineering Boilers Factory Contract Management Pipelines Turbines Lng Oil And Gas Procurement Steam Turbines Gas Turbines Project Control Energy Industry Steam Instrumentation Dcs Construction Management Plc Project Management P&id Electricians Renewable Energy Solar Energy Management Wind Electricity Contract Negotiation Process Scheduler Oil/gas Program Management Commissioning Management Project Development

Frequently Asked Questions about Tony Franks

What is Tony Franks's role at the current company?

Tony Franks's current role is Consultant.

What is Tony Franks's email address?

Tony Franks's email address is to****@****ylp.com

What are some of Tony Franks's interests?

Tony Franks has interest in Golf, Sports, Professional And Collegiate Level, Family Activities.

What skills is Tony Franks known for?

Tony Franks has skills like Power Plants, Epc, Energy, Commissioning, Gas, Petrochemical, Power Generation, Engineering, Inspection, Petroleum, Project Engineering, Boilers.

Not the Tony Franks you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.