Travis Carte is a Project Management, Project Engineering & Construction Management Services at Carte Project Services. They is proficient in English.
Carte Project Services
-
DirectorCarte Project Services Oct 2022 - PresentNew South Wales, AustraliaProject and construction management services, including:Client - Evolution Mining Project: E26 L1N Automation - Execution and integration of an automation system retrofitted to existing underground loaders, including all supporting electrical infrastructure and automation of the underground secondary ventilation system. Project: 123-CV008 Conveyor Upgrade - Execution of works to increase structural capacity of an operation critical conveyor. Significant concrete and structural steel elements, including site and workshop welding. Shutdown critical works across multiple planned outages.Client - Metals Acquistion Corporation (MAC) LimitedProject: Rougher Bank 1 Replacement - Demolition of existing and installation of a new rougher flotation bank, including commissioning. Project: Mills Replacement Project - Design, engineering, procurement, contract administration, construction and commissioning of two grinding mills, complete with switch room, transformer and conveyor modifications. Significant focus on concrete, mechanical, structural, piping, electrical and PLC.
-
Senior Project Engineer (Mechanical)Stantec Aug 2021 - Sep 2023AustraliaClient - Glencore CSAProject Engineer (Mechanical), Projects (Execution Phase):• Grinding Circuit Upgrade - Removal and replacement of two (2) SAG Mills, new Sx and Tx.• Ventilation Project - Removal and replacement of two (2) sets of two (2) return air vent fans, complete with one (1) HV and two (2) LV switchrooms, transformers and associated construction activities (earthworks, concrete, SMP and E&IC)• Cooling Project - New fresh air raise and permanent 134a cooling plant incl. HV and LV infrastructure. • Shaft 2 Steelwork Remediation - Winder shaft steelwork and loading station chute work replacement• Rougher Bank 1 Replacement - Demolition of existing and installation of new five (5) cell flotation bank. -
Project Engineer - ExpansionCmoc-Northparkes Mines May 2019 - Jul 2021Successful delivery of a site wide $75M Expansion project to increase production by 15%. I was the lead project engineer accountable for execution of the largely green field Secondary Crushing facility (~$40M), including a screen building with 36m2 screen, crushing building with two cone crushers, two belt feeders and two 200t surge bins, three new conveyors, extension and modification of existing site conveyors, overhead cranes, dust scrubbers and the installation of two transformers and a 34m switch room.Successful delivery of a curved transfer conveyor (Second tightest in the world) was also executed.Successful completion of a ~$60M phase 2 Expansion feasibility study, inclusive of a new 6.6MW ball mill, cylones, pumps and associated Civil, SMP and E&IC infrastructure.
-
Project Engineer - Single Module FlotationCmoc-Northparkes Mines Jan 2018 - May 2019GoonumblaSuccessful delivery of a $12M brownfield capital project within the baseline budget and schedule. The project scope including the decommissioning of an existing flotation circuit, and the installation of a new single module flotation circuit, including; suspended concrete slabs, new tank cells, blowers, pumps, hoppers, steel lined piping, transformer and LV switch room.Project tasks and particulars included:• Management of budget, schedule and scope• Management and coordination of engineering design consultants• Supply contract administration and management• Management of multidisciplinary construction contractors (Civil/Concrete, SMP, E&I and Controls), including shutdown supervision• Facilitate commissioning• Reporting project progress to senior management team
-
Graduate Mechanical EngineerCmoc-Northparkes Mines Jan 2017 - Jan 2018Parkes, Nsw• Sustaining projects - Ore Processing and Underground, EPCM with mechanical, electrical and civil contractors • Capital projects - Pre-feasibility study for filtration & thickening and a feasibility study for hoisting & underground materials handling system as part of a site wide $100M Expansion project
-
Customer ServiceWoolworths Supermarkets Mar 2009 - Jan 2017 -
Mechanical Engineer Vacation StudentIndependence Group (Igo) Dec 2015 - Mar 2016• FIFO 2/1 Roster• Mobile Plant - Fitter & TA duties• Fixed Plant - Fitter & TA duties• Time in Motion analysis -
InternTorbae Engineering Mar 2015 - Oct 2015Hastings• TA for boiler makers, machinists, welders and fitter and turners (on and offsite)• Design and drafting support • Document control
-
Technical Assistant & Factory HandCaps And Closures Pty. Ltd. Jan 2009 - Nov 2014Dandenong South• Lean manufacturing practices• Machine maintenance• Quality control
-
Maintenance AssistantNova Engineering And Precision Tooling Aug 2009 - Mar 2010• Basic maintenance of engineering tooling (lathes, milling machines) and dye sets for injection moulding machines
Travis Carte Education Details
-
Mechanical Engineering -
Mechanical Engineering
Frequently Asked Questions about Travis Carte
What company does Travis Carte work for?
Travis Carte works for Carte Project Services
What is Travis Carte's role at the current company?
Travis Carte's current role is Project Management, Project Engineering & Construction Management Services.
What schools did Travis Carte attend?
Travis Carte attended Rmit University, Rmit University.
Not the Travis Carte you were looking for?
-
4beyondthesummit.tv, gmail.com, gmail.com, gmail.com
-
Travis Carte
Gallipolis, Oh
Free Chrome Extension
Find emails, phones & company data instantly
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial