AeroLeads people directory · profile

Tristan Le Pit Email & Phone Number

Shutdown Manager at Fonterra
Location: Matamata, Waikato, New Zealand 11 work roles 3 schools
1 work email found @fonterra.com LinkedIn matched
✓ Verified Jul 2026 4 data sources Profile completeness 100%

Contact Signals · 1 work email

Work email t****@fonterra.com
LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Shutdown Manager
Location
Matamata, Waikato, New Zealand
Company size

Who is Tristan Le Pit? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Tristan Le Pit is listed as Shutdown Manager at Fonterra, a with 13495 employees, based in Matamata, Waikato, New Zealand. AeroLeads shows a work email signal at fonterra.com and a matched LinkedIn profile for Tristan Le Pit.

Tristan Le Pit previously worked as National Process Engineer - Natural Gas at Fonterra and Reliability Engineer at Fonterra. Tristan Le Pit holds Ingénieur Grenoble-Inp Pagora, Pulp & Paper Manufacturing from Institut National Polytechnique De Grenoble.

Company email context

Email format at Fonterra

This section adds company-level context without repeating Tristan Le Pit's masked contact details.

{first}.{last}@fonterra.com
89% confidence

AeroLeads found 1 current-domain work email signal for Tristan Le Pit. Compare company email patterns before reaching out.

Profile bio

About Tristan Le Pit

I am an Industrial Engineer who is passionate about every aspect of process efficiency - from defining desired outcomes to execution and monitoring. I participated to making a difference at a business level as a team member, leader or manager by improving quality, reducing risk and reducing costs through initiatives involving production and maintenance planning and supervision, procurement, process and project engineering, contracts management, operations, product developement and process safety.

Listed skills include Continuous Improvement, Process Improvement, Process Engineering, Manufacturing, and 39 others.

Current workplace

Tristan Le Pit's current company

Company context helps verify the profile and gives searchers a useful next step.

Fonterra
Fonterra
Shutdown Manager
Matamata, NZ
Website
Employees
13495
AeroLeads page
11 roles

Tristan Le Pit work experience

A career timeline built from the work history available for this profile.

Shutdown Manager

Matamata, Nz

National Process Engineer - Natural Gas

Current

Hamilton, Waikato, New Zealand

NZM Engineering - Programme management

Apr 2023 - Present

Reliability Engineer

Tirau, Waikato, New Zealand

- Maintaining Asset Condition database- Supporting development of rationale for capital expenditure based on asset condition- Supporting failure investigations- Deploying Global Maintenance Strategies- Participating to design reviews, HAZOPs and Operational Readiness activities (Major capital investment)- Participating to Business Engineering Risk Management Workshops- Reviewing, creating and implementing recommended preventative maintenance on critical assets in SAP… Show more - Maintaining Asset Condition database- Supporting development of rationale for capital expenditure based on asset condition- Supporting failure investigations- Deploying Global Maintenance Strategies- Participating to design reviews, HAZOPs and Operational Readiness activities (Major capital investment)- Participating to Business Engineering Risk Management Workshops- Reviewing, creating and implementing recommended preventative maintenance on critical assets in SAP (for safety [MHF site}, regulatory compliance [PECPR, Gas code] and reliability) +Listing the critical equipment (documenting risk type and threshold) +Collecting Master data +Identifying maintenance strategy (Condition monitoring tools, servicing requirements, specific needs based on failure history) +Centralizing all feedback from those activities to use as inputs to the maintenance process (service reports, MD inspection reports, VA reports, Oil analysis, belt surveys...) Show less

Jan 2021 - Apr 2023

Seconded To Maintenance Manager

Tirau, Waikato, New Zealand

Looking after Maintenance and Services at Tirau.Preparing the site for FY24 start up with 4 major projects commissioningReviewing major maintenance objectives to mitigate existing critical equipment riskDocumenting business cases and applying for capital/NRMReporting deficiencies and implementing corrective actions

Sep 2022 - Nov 2022

Shift Manager - Pulpmill

Kinleith

Pulpmill Business Unit: Woodprep, 3 pulpmills and the chemical plant, producing 1600Adt/D pulp. Spare shift manager [December 2018 to November 2019]_ Involves working relationship with about 200 people, including 105 operators on 4 shifts. Manager on A shift from November 2019 to December 2020 (27 operators). Isolation and confined space entry certificates supervisor, permit to work issuerPeople: _Responsible for leading the team day to day, planning… Show more Pulpmill Business Unit: Woodprep, 3 pulpmills and the chemical plant, producing 1600Adt/D pulp. Spare shift manager [December 2018 to November 2019]_ Involves working relationship with about 200 people, including 105 operators on 4 shifts. Manager on A shift from November 2019 to December 2020 (27 operators). Isolation and confined space entry certificates supervisor, permit to work issuerPeople: _Responsible for leading the team day to day, planning cover for the next shifts_Responsible for identifying critical competencies in the shift, mitigating shortages [short term hits, example COVID level 4 was a challenge] and building individual and collective plans to maintain and improve the skill base [long term]_Pivotal role in emergency management (medical event, work accident, process safety incident), _Participating to injury management and return to work plansPlant:_Review of H&S and process risks in the plants and controls in place each shift_Optimization of plants productivity based on internal and external risks, _Supervision of unplanned events including mitigation as best for site (risk to other Business units, possible maintenance opportunities, cost, quality, global uptime, resources) _Prioritized resolution of complex or multiple events, escalation as necessary (process safety event, significant work accident, significant disruption to operations, need for resources beyond available in numbers or skills)_Responsible for immediate AFARP actions to process safety events (assessing risk and casualties, providing immediate first aid, supporting operators stabilizing the plant, freezing the scene and escalating) Show less

Aug 2018 - Dec 2020

Plant Engineer - Steam & Recovery

Kinleith - South Waikato - New Zealand

_Site duty group (1/8 roster)_Process Engineer dedicated to Steam and Recovery plant production_Problem solving and advice to the S&R area Manager regarding daily activities_Always looking at the current level of risk and top 3 relative bottlenecks in the plant_Isolation and confined space entry certificates supervisor, permit to work issuer, natural gas engineer_Acting Production Manager on Maintenance shuts (Recovery Boilers, Evaporators, Primary Boilers)_Acting… Show more _Site duty group (1/8 roster)_Process Engineer dedicated to Steam and Recovery plant production_Problem solving and advice to the S&R area Manager regarding daily activities_Always looking at the current level of risk and top 3 relative bottlenecks in the plant_Isolation and confined space entry certificates supervisor, permit to work issuer, natural gas engineer_Acting Production Manager on Maintenance shuts (Recovery Boilers, Evaporators, Primary Boilers)_Acting Produciton Manager (Daily activities) in the absence of the S&R Area Manager_2 Primary Boilers, 2 Recovery Boilers, 2 sets of Evaporators_Recovery boiler tuning to reduce SO2 emissions (reduced below detection, site emissions reduced 96% as a result between 2016 and 2017)_Process Engineering Leader and Facilitator to establish the process hazard analysis baseline in S&R [MHF site - identifications of process safety risk areas, major incident scenarios, safety critical elements, deviations from design, deficiencies in operating envelopes, existing safeguards, recommendations (for preventing and mitigating process safety incidents). This led to building the bow-ties for visual management and safety case documentation, and provided an input for the process safety team as to what needs working on] Show less

Dec 2016 - Aug 2018

Process Engineer - Steam & Recovery

Kinleith - South Waikato - New Zealand

Process troubleshooting (Recovery Boilers, Evaporators)Process commissioning and documentation (By Products plant)Process improvements (Site steam headers ability to cope with a boiler trip or a customer shedding steam load)Alarms and interlocks rationalization (5 Evaps, By Products plant)Site duty group (1/8 roster)Process Hazard Analysis / Formal Safety Assessment Facilitation (By Products, Waste gas, Caustic and Kilns)Acting Production Manager on… Show more Process troubleshooting (Recovery Boilers, Evaporators)Process commissioning and documentation (By Products plant)Process improvements (Site steam headers ability to cope with a boiler trip or a customer shedding steam load)Alarms and interlocks rationalization (5 Evaps, By Products plant)Site duty group (1/8 roster)Process Hazard Analysis / Formal Safety Assessment Facilitation (By Products, Waste gas, Caustic and Kilns)Acting Production Manager on maintenance shuts (Evaporators)Isolation and confined space entry supervisor Show less

Jun 2015 - Dec 2016

Process Engineer

Whirinaki - Hawkes Bay

Participated to the definition, documentation, implementation, start up and commissioning of a plant to bleach radiata TMP.Site duty group (1/8 roster)Improved operations by communicating feedback to instrumentation techs and defining best practices with operations team.Calculated heat loss optimisation indicator (cost of insulating each m² of exposed equipment per kW currently lost). Listed in order of priorities. Temperature increased 15°C for the bleaching plant… Show more Participated to the definition, documentation, implementation, start up and commissioning of a plant to bleach radiata TMP.Site duty group (1/8 roster)Improved operations by communicating feedback to instrumentation techs and defining best practices with operations team.Calculated heat loss optimisation indicator (cost of insulating each m² of exposed equipment per kW currently lost). Listed in order of priorities. Temperature increased 15°C for the bleaching plant, reaching recommendations.Decreased water consumption by pointing out where the waste was and prioritized based on $$ spent for each m³ saved, designed process and engineering solutions and actions for short listed items and implemented. Consumption reduced 27% for the pulpmill.Corrected misleading DCS screens and process descriptions to enhance process control abilities (Chip wash screening room, Double wire Press hydraulic system)Set specifications and documented contract to install a pulp analyser (CSF, fibre analysis)Defined engineering constraints for increasing production on #1 line (not enough air to convey drying energy through the ducts), and participated to increasing productivity of the double wire press and consecutive drying line through multiple projects, using feedback from operators, guidance from management and support from site engineers (dewatering boards upgrade, floating wedge upgrade, stock feed pressure control implementation, dryer 2nd stage centrifugal fan upgrade). Production rate increased from 290adt/d to 330adt/d, with 15adt/d spare capacity as the bottleneck shifted downstream to the slab press. Show less

Oct 2011 - Jun 2015

Manufacturing Office & Quality Manager

Angouleme, France

Product development (Food contact, Fireproof papers)Administrative process improvement by mapping the whole process from enquiries to delivery and analyzing to target specific weaknesses in terms of accuracy and time management (to shift from 70% reactive to 70% proactive mode)Purchasing process improvement by building a document to forecast needs, pointing potential near misses and price increases 3 months in advance (Earthquake in Chile impacted pulp sales from April to August… Show more Product development (Food contact, Fireproof papers)Administrative process improvement by mapping the whole process from enquiries to delivery and analyzing to target specific weaknesses in terms of accuracy and time management (to shift from 70% reactive to 70% proactive mode)Purchasing process improvement by building a document to forecast needs, pointing potential near misses and price increases 3 months in advance (Earthquake in Chile impacted pulp sales from April to August 2010 in Europe). This allowed avoiding a production shut by the end of July by starting to store 3 months in advance, and saved 27kEuros in October by ordering only the required volumes when prices were high in August/September. Show less

Feb 2010 - Nov 2010

Apprenticeship - Industrial Engineer

Arjo Wiggins

Besse Sur Braye - France

Product Development - Benchmarked processes of Arjowiggins Besse and Dalum Papir to improve surface properties of offset paper from recycled pulp in heavy grades (350GSM).Studied reeling tension system after the coating machine to determine optimization of tension control as the reel grows, to avoid uneven gloss on semi-mat papers, as too much tension tends to shift all pigments to the same orientation, increasing reflection.

Sep 2007 - Aug 2009

Refendeur

Condat / Lecta Group

Le Lardin St Lazare

Operateur poste sur refendeuse 8 (papiers couches lourds).

Jun 2007 - Aug 2007
Team & coworkers

Colleagues at Fonterra

Other employees you can reach at fonterra.com. View company contacts for 13495 employees →

3 education records

Tristan Le Pit education

Maths, Physics, Engineering Science

Lycee Pierre-Gilles De Gennes - Encpb

Classes preparatoires aux grandes ecoles, MPSI puis MP

FAQ

Frequently asked questions about Tristan Le Pit

Quick answers generated from the profile data available on this page.

What company does Tristan Le Pit work for?

Tristan Le Pit works for Fonterra.

What is Tristan Le Pit's role at Fonterra?

Tristan Le Pit is listed as Shutdown Manager at Fonterra.

What is Tristan Le Pit's email address?

AeroLeads has found 1 work email signal at @fonterra.com for Tristan Le Pit at Fonterra.

Where is Tristan Le Pit based?

Tristan Le Pit is based in Matamata, Waikato, New Zealand while working with Fonterra.

What companies has Tristan Le Pit worked for?

Tristan Le Pit has worked for Fonterra, Oji Fibre Solutions, Oji Fibre Solutions [Oji Holdings], Pan Pac Forest Products [Oji Holdings], and Alamigeon Sas.

Who are Tristan Le Pit's colleagues at Fonterra?

Tristan Le Pit's colleagues at Fonterra include Gary Wright, Joshua Yao, Bree Penny, Tomasz Soluch, and Kaushalya Piyasena.

How can I contact Tristan Le Pit?

You can use AeroLeads to view verified contact signals for Tristan Le Pit at Fonterra, including work email, phone, and LinkedIn data when available.

What schools did Tristan Le Pit attend?

Tristan Le Pit holds Ingénieur Grenoble-Inp Pagora, Pulp & Paper Manufacturing from Institut National Polytechnique De Grenoble.

What skills is Tristan Le Pit known for?

Tristan Le Pit is listed with skills including Continuous Improvement, Process Improvement, Process Engineering, Manufacturing, Engineering, Process Optimization, Change Management, and Commissioning.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.