Troy Ashworth

Troy Ashworth Email and Phone Number

API 510 and 570 Inspector @ Arctic Testing & Inspection
Baytown, TX, US
Troy Ashworth's Location
Baytown, Texas, United States, United States
Troy Ashworth's Contact Details

Troy Ashworth personal email

About Troy Ashworth

I have been in the Inspection business since November 1991 to the present. I started out performing radiography, and then performing NDE / NDT inspections (Dye Penetrant, Magnetic Particle, Ultrasonic, PMI, and ET inspections). I have progressed up to a certified API Inspector and at times a supervisor. I am a team player, pay attention to details, and work / encourage safety 24/7.API 570 Certification Number 33144 (07/31/2008)API 510 Certification Number 33744 (11/30/2008)

Troy Ashworth's Current Company Details
Arctic Testing & Inspection

Arctic Testing & Inspection

View
API 510 and 570 Inspector
Baytown, TX, US
Employees:
140
Troy Ashworth Work Experience Details
  • Arctic Testing & Inspection
    Api 510 And 570 Inspector
    Arctic Testing & Inspection
    Baytown, Tx, Us
  • Arctic Testing & Inspection
    Api 510 / 570 Inspector
    Arctic Testing & Inspection
    La Porte, Texas, United States
    Perform internal / external inspection on process equipment, piping, furnaces, and high pressure valves for run and maintain and for scheduled outages at the LyondellBasell Polymers plant.
  • Versa Integrity Group, Inc.
    Versa Integrity Group, Inc. 2019-12 - 2023-01
    Port Lavaca, Texas, United States
    GE APM Program: Populate the previous line numbers into piping circuits, and all equipment folders with data from the U1’s, construction drawings, equipment specs, and previous visual inspections. QA - review, verify, and make sure all the inspection data was completed and correlated before uploading it into the GE APM software. I deal with Formosa Engineering and their Mechanical Integrity Inspectors on a daily basis to verify all the data is correct.

    Performed API 510 Internal / External inspections on the Formosa Plastic Plant OL-1 Unit exchangers at the Dunn Heat Exchangers shop in Bay City, Texas. Reviewed Tube inspection data, NDE / NDT reports, and followed all repair recommendations that were completed from all inspections. Witnessed all assembly of the exchanger components with shell and tube side hydro tests.

    Nighttime supervisor and API 510 / 570 Inspector at the Formosa Plastic Plant in Port Lavaca for the GHU and PPU during their unit outages. Coordinate API internal / external inspections along with NDE / NDT inspection on Towers, Drums, Exchangers, Furnaces, Filters, and Tanks. Generated repair recommendations and reviewed inspection reports. I worked closely with the Formosa engineering group, Formosa operations, Formosa safety, and The Woodgroup in facilitating inspections.
  • Acuren
    Acuren 2018-12 - 2019-12
    Limetree Bay Refinery In The U.S. Virgin Islands
    Performed API 570 / API 510 internal and external inspections at the LimeTree Bay Refinery for their Restart Project in St. Croix. Visual inspections were performed on towers, columns, drums, exchangers, boilers, filters, furnaces, and all other associated critical equipment and critical piping associated with the refinery start-up which has been out of service since 2012.
  • Turner Specialty Services
    Turner Specialty Services 2018-10 - 2018-11
    Chemours Chemical Plant In La Porte Texas
    Performed API 570 / API 510 internal and external inspections (reactor, exchangers, drums, hoppers, columns, boiler, expansion joints, and associated critical equipment and piping) during the Chemours Company October Turnaround in their Hydrofluoric Acid Unit and the Sulfuric Acid Unit.
  • Sentinel Integrity Solutions
    Sentinel Integrity Solutions 2018-02 - 2018-06
    Dow Chemical Plant In Midland Michigan
    API 570 and API 510 inspector at the Dow Chemical Plant in Midland Michigan. Performed external inspection along with ultrasonic thickness inspection on equipment and piping systems to be within compliance. Performed remaining life calculations on equipment and piping. Made recommendations for repairing equipment and piping. Worked closely with the Dow Chemical Inspection Lead and engineers on findings from inspection.
  • Tge Industrial Services
    Tge Industrial Services 2016-07 - 2017-05
    Celanese Plant In La Porte Texas
    QA, API 570, and API 510 inspector as the representative for the Celanese Corporation Clear Lake Plant in Texas for pre-turnaround, and the plant total outage for the fabrication of the Utility unit steam and fuel gas piping throughout the plant to the proposed cut lines for the adding of double block and bleeds to each unit inside the plant. This steam and fuel gas project is the sole reason for the total plant outage. S.W.A.T. (Specialty Welding and Turnaround) performed the welding and installation of the piping, and I was responsible for witnessing the hydrostatic testing of all pipe spools, hydrostatic testing of flanges by Carber Services, reviewing the radiographs that were performed by the Mistras Group, performed ultrasonic testing, and visual inspection for CUI and internal erosion / corrosion at proposed cut lines, witnessed the installation of the new pipe or equipment, made recommendations to the Celanese Corporation inspectors for repair or replacement of items that were found to be unsuitable for continued service, witnessed the new paint coating, and I witnessed the installation of new insulation to the Celanese specification and procedures, reviewed all inspection reports, and the WPS / PQR welding procedures.
  • Techcorr Usa, Llc
    Techcorr Usa, Llc 2016-02 - 2016-05
    Chevron Phillips Cedar Bayou Plant
    Performed CUI inspection and base plant inspections (API 570 and API 510) on piping and equipment at the Chevron Cedar Bayou Plant in Baytown Texas. Primarily I performed the CUI inspections for the upcoming total plant outage in the fall of 2016 to make sure that the pipe and equipment was fit for continued service or to schedule repairs / replacement during the total plant outage.
  • Mistras Group, Inc.
    Mistras Group, Inc. 2014-07 - 2015-03
    Bayer Chemical In Baytown Texas
    Responsible for the CUI program in the Coatings unit area at the Bayer Chemical plant in Baytown Texas on piping, vessels, and tanks. API 510, 570, and 653 external inspections were performed also while performing the CUI inspections.

    I was transferred to be the unit inspector for the El Dorado Nitrogen CO plant (inside the Bayer Chemical plant) performing API 570, 510, and 653 external inspections. I also performed internal inspections, reviewed radiographic film, witnessed hydrotesting of pipe spools that were installed, and reviewed all inspection reports during the unit outages.
  • Tech Corr Inspection
    Tech Corr Inspection 2012-05 - 2012-11
    Oxy Lpvcm
    Performing Oxy Chemical's, at the LaPorte VCM plant, API 510, 570, and 653 maintenance inspections, and QA / QC work on capital projects on tanks, vessels, and piping. *****Shaw Group (Inspection portion) lost the contract to Tech Corr Inspection, and I rolled over to that company to stay at my position.*****
  • Shaw Global Inspection
    Shaw Global Inspection 2009-05 - 2012-05
    Oxy Lpvcm
    Performed Oxy Chemical's, at the LaPorte VCM plant, API 510, 570, and 653 maintenance inspections, and their QA / QC work on capital projects on vessels and piping. I am also in charge of the CUI project on piping and vessels.
  • Acuren Inspection
    Acuren Inspection 2007-08 - 2009-05
    Oxy Lpvcm
    Performed Oxy Chemical's, at the LaPorte VCM plant, API 510, 570, and 653 maintenance inspections, and QA / QC work on capital projects on vessels and piping. I also started the piping CUI program at the plant.*****Acuren Inspection lost the contract to Shaw Global Inspection, and I rolled over to that company to stay at my position.*****
  • Eagle X-Ray
    Eagle X-Ray 1990-11 - 1997-10
    Various Pipe Shops And Various Companies Throughout The Houston Texas Area
    Performed radiographic inspection on pipe, tanks, and vessels. Performed these radiographs at weld shops, refinery and chemical plants, pipelines, and off-shore.

Troy Ashworth Skills

Ndt Piping Petrochemical Inspection Refinery Pipelines Tanks Pressure Vessels Welding Corrosion Ut Factory Ultra Pipe Knowledgeable Sap Knowledgeable Meridium Capstone Rbmi

Troy Ashworth Education Details

  • Lee College / San Jacinto College
    Lee College / San Jacinto College
    Associates
  • Robert E. Lee
    Robert E. Lee

Frequently Asked Questions about Troy Ashworth

What company does Troy Ashworth work for?

Troy Ashworth works for Arctic Testing & Inspection

What is Troy Ashworth's role at the current company?

Troy Ashworth's current role is API 510 and 570 Inspector.

What is Troy Ashworth's email address?

Troy Ashworth's email address is tm****@****hoo.com

What schools did Troy Ashworth attend?

Troy Ashworth attended Lee College / San Jacinto College, Robert E. Lee.

What skills is Troy Ashworth known for?

Troy Ashworth has skills like Ndt, Piping, Petrochemical, Inspection, Refinery, Pipelines, Tanks, Pressure Vessels, Welding, Corrosion, Ut, Factory.

Who are Troy Ashworth's colleagues?

Troy Ashworth's colleagues are Madalynn Standley, Joshua Richard, Chad Sodders, Andrew Lucario, Robert Murphy, Ben Oehlert, Amanda Ambrose.

Not the Troy Ashworth you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.