Executive Director Engineering
Current1). Fortunate enough that by realising the capabilities of Project completion in tough situation. NTPC higher management picked up me as a Chief of Erection & Commissioning of FarakkaU#6 (500MW unit) and Rihand stage-III (2x500 MW) (both facing serious challenges)commissioning of units were ensured and Rihand Stage-III 2x500 MW were commissionedahead of schedule and unit 01 was even completed within 39.2 months from the date ofMain plant order.2)..Always proven myself as a trouble shooter whenever there was a need for this greatMaharatna company from beginning of my career as an Executive Trainee such asdepartmental restoration of Russian U#1 210MW Kahalgaon in a record time, Boiler aftermassive explosion in 1992 (USSR was also disintegrated), restoration of units aftersudden crash floods in record time, restoration of Unchahar 500 MW Boiler after a majorexplosion, Meja HP Germany make 660MW Tower type Boiler restoration,transportation of critical Russian spares during peak Ukraine war and U.S. sanctions (andsuccessful commissioning of Russian 660 MW units which were stagnant since 2008.Commissioning of PSA based 02 units at Corporate Centre as well as at remote locationsduring peak COVID period although myself and entire family was badly suffering fromCOVID.3). Having a passion toward improvement of Heat Rate, Aux. Power Consumption efficiency,reliability, safety, quality, cost reduction and on the another hand paying high regards tomost valuable “Human Resources”. Under my tenure major modifications such as CRH asan additional source to soot blowing, complete dry bottom ash system, MRS above groundlevel, conical hoppers for ESP, VFD for radial drives, hanger tubes for coils, elimination ofVIS etc., were successfully implemented