Automation Engineer
CurrentCollaboration with client (Allseas Group) in planning, execution and documentation, of asbestos content cable removal project on-board an under water pipe-laying vessel (Singapore).Carried out E&I drawings, deliverable list preparations, SLD preparations, BOM/MTO preparation, Cable length estimation, cable schedule preparation for upgradation project of FSRU LNG Tanker (Höegh Autoliners).Conducted site visits globally for data collection on-board various marine vessels for E&I system upgradation projects.Carried out E&I as-built drawings such as electrical load analysis, short circuit calculation, SLD for main switchboard design, luminescence calculation for new lighting systems, fire detection system design, PA-GA system design, CCTV design, preparation & modelling for POS upgradation of marine vessels.Gap analysis study preparation, feasibility study preparation of various special purpose ships.Client co-ordination, communication with yard members and discussion with team members for timely delivery of documents.Carried out BWMS design drawing preparation, documentation of various Ex-systems and non-ex systems, co-ordination with client, site team for retro-fitting purposes.Managing subordinates and QC correction and analyzation of E&I, P&ID drawings for executing and timely delivery of design drawings and documentation of marine - offshore projects.Communication with client, vendor & owner representatives for project requirements to ensure quality standards.Preparation of design drawings for Class approval and get required documents approved.Proficient in E&I, P&ID, AutoCAD, Marine Class rules, MCT design.