Project Engineer
Badar Engineering Works
Karachi
• Estimated project cost and prepared tender documents for successful bidding of projects up to 10M AUD. Extracted information from bill of quantity (BOQ) and tender documents such as load requirements, transformer, and feeder specifications, etc.• Interpreted, commissioned, and tested LV and MV mega project electrical design concepts up to 5MW power transmission/generation and 10M AUD in budget, according to industry-standards and designed SLDs, 2D and 3D drawings using AutoCAD and PSS®E.• Installed 1000 kVA and 500 kVA transformers with concrete pad and metal galvanized rod grounding and performed insulation resistance test before energizing the transformer.• Installed electrical feeders up to 250A mounted on a concrete pad with rod grounding and performed energizing/de-energizing of HV electrical switchgear equipment.• MV and LV cable laying and pulling rated up to 300 mmsq and HDPE pipe conduit for telecommunication and ICT wiring in the trench using straight/corner cable rollers. Cable protection using warning tape and bricks. • Using PLC, current and power transformers to install and design switchgear and distribution board up to 500KVA. Performed load flow analysis, stability analysis, load modeling, and power factor correction on PSSE, power factory, Multisim, and MicroStation.• Performed technical feasibility analysis, compliance, and field audit quality assurance checks, and generated work progress, performance, and defect reports for each of the installed equipment on site.• Utilized project management tools such as Gantt Chart on Microsoft Project to plan, reschedule, manage project cost, and keep track of project progress accord to the delivery timeline.• Managed and reviewed performance of contractors for project progress. Observed field audits and quality inspections. • Developed and retained customer relations for accounts up to 2.5M AUD with trust and dependability.