Project Quality Engineer
CurrentThe Luhri Stage-I 210MW Hydroelectric Project is being developed on the Satluj river,Luhri Stage-I includes the construction of an 80m-high concrete gravity dam, which will stand 49m tall above the riverbed. The main units will receive the water flow through two 6.8m-diameter penstocks measuring 84.14m and 80.48m in length. The penstocks for the two.