Umarul Farook Email and Phone Number
13 years of extensive expertise in a variety of Infrastructure projects, including Construction of Underground Metro Rail (Chennai metro Rail & Mumbai Metro Rail), Airport (IGI-Delhi), Railroad Bridges & Culverts(DFCC-Gujarat), Atomic reactor projects and building projects.Sound knowledge and familiarity with construction of underground Metro Rail stations (Top down and Bottom up method). Well Experience in construction of permanent structure works like, Slab, wall, Column, staircase,Diaphragm walls, RCC Retaining wall, platform wall, platform slab, Guide Walls, wing wall, Sheet piles Shoulder piles, Head wall and OTE Ducts. Plan the sequence of works, prepare weekly and monthly schedule of works based on base line program and as per site requirements. Ensure that all the works are executed in accordance with approved Method Statement, Safety Procedure and Quality Methods. In charge of resolve site issues and necessary approval by client. Good Knowledge in Secant pile, Erection of king post, Structural steel traffic decking, strutting, Excavation, pcc, water proofing, reinforcement, concreting, staging, backfilling including recourse management. Monitor the progress of works against delay in construction so as to enable corrective action to be taken to prevent stoppages and delays. Provide direction to any remedial action if necessary to achieve stipulated programme and milestone dates. Vast experience in selection, procuring, allocating, execution and reconciliation of formwork systems like Flex, Conventional, Doka, Peri, Paschal, Nova, and Alsina for all type of structures. Involved in the construction of major bridges (Piers, abutments, box culverts) and experience in geotechnical investigations i.e., Bore Hole, SPT, PT, and ERT. Liaise with sub-contractors, Consultants and Clients as required for necessary co-ordination and management. Ample knowledge in programing of scaffolding erection and dismantling.
J Kumar Infrastructure Limited.
View- Employees:
- 13
-
Deputy ManagerJ Kumar Infrastructure Limited. Sep 2019 - PresentMumbai, Maharashtra, IndiaMUMBAI METRO LINE -3 UGC -05 (UNDER GROUND METRO RAIL PROJECT)Monitoring and controlling the overall project with respect to cost, Resource deployment, Time over-Runs and quality compliance; Ensuring the satisfactory execution & completion of project. Supervising the construction process from the conceptual development stage through final construction, ensuring that the projects get done on time completion with given timeline. Overseeing the entire project, construction scheduling & coordinate with all design /Team. Leading a team of professionals; ensuring suitable deployment and availability of manpower. Evaluating & Determining construction delivery system and most cost-effective plan and schedule for completing project. Anchoring on-site construction activity to ensure completion of project within the time & cost parameter and effective resources utilization to maximum the output. Strictly follow and implement stringent system and quality plans/ manual to ensure high quality standard during all the stage of project. Liaising with consultants, contractors, sub-contractors & External agencies for clearance. As well as, Overall responsible for formwork management, scheme implementation, safety, quality andProductivity of formwork manpower and materials at site. Implement methodology and execute the construction of UG structures like piles, slabs, walls, waterproofing works, OTE ducts, staircase, Natm and Tunnel eye cut and cover method. Monitor and in charge for construction of slab, wall, pile, waterproofing work for both horizontal and vertical structures. Regular coordination with designer and consultant for drawing clarification to avoid delay in execution. Regular monitoring and arranging repair related works with appropriate material as per the direction of quality engineer. Ensure timely mobilization & effective utilization of reinforcements, formwork and scaffolding Materials. -
Senior EngineerTata Projects Dec 2018 - Aug 2019Chennai, Tamil Nadu, IndiaIndira Gandhi Centre for Atomic Research, Fast Reactor Fuel Cycle Facility. Kalpakkam.Worked as a Formwork In-Charge of all civil structures. Overall responsible for formwork and scaffolding scheme implementation, safety, quality andProductivity of formwork manpower and materials at site. Ensure timely mobilization & effective utilization of formwork and scaffolding Materials. Planning and allocation of materials, manpower and equipments. Educate/ train sub-contractors on formwork and scaffolding. Making mock-up of various system formwork at site. Maintain Inventory, requirement and surplus list of formwork and scaffolding Materials. Ensure safe use of Formwork, scaffolds and staging at the site. Prepare stock statement of formwork materials with area of shuttering done Category wise, plywood/timber procured during the month/ till date and Productivity report. Monitor hired formwork and scaffolding materials at site to ensure effective utilization. Maintain close interaction with contractors, stores & site for proper accounting of materials. -
Site EngineerLarsen & Toubro Nov 2016 - Nov 2018Gujarat, IndiaWestern Dedicated Freight Corridor Package CTP-3(R) Iqbalgarh to Vadodara (Gujarat)Worked as a Formwork ENGINEER/ IN-CHARGE of civil structures for CTP-3R project. Preparation of formwork programme based on the overall construction programme. Assisting the project manager and section in charge with the execution of the job in accordance with the approved methodology Supervision of shuttering works for RCC structures to quality and safety as per standards/contract and satisfy by the clients. Co-ordination of shuttering scheme in consultation with Design Engineer (Region). BOQ Preparation of form work materials for structures, based on cmpc scheme drawings as per budget (current year). Allocation of materials / labor / plant & machinery for formwork activities in co-ordination with planning manager at sites. Preparation of bar bending schedule and sending it to site as per site requirement. Receipts of plywood / formwork materials to be acknowledged after quality checks to TFL office on monthly basis. Workout and arrange the all consumables or sacrificial materials which is used in site, and reconcile/further requirement also give every month. And after received surely inspected. -
Jr EngineerAfcons Infrastructure Limited - A Shapoorji Pallonji Group Company Aug 2013 - Sep 2016Chennai, Tamil Nadu, IndiaChennai metro rail project (underground).Taking Execution responsibilities for all the activities in the site. Planning and executing the site work in all aspects according to given method statement. Execute the work based on the direction of Engineer Incharge. Enabling arrangements for construction of guide wall and excavation. Bentonite preparation for diaphragm wall excavation to avoid settlement. Arrangement for Grab or Cutter placement for excavation. Monitoring of Instrumentation report on regular basis to avoid fluctuations. Execution of diaphragm wall, slabs, Column, waterproofing works, staircase and other confined structures. Arrangements and facilitation of Strut Fixing. Implementing methodology of Grout and repair of leakages and dry cracks. Arrangement and execution of thrust block for TBM launching. Coordination of marking and installation of dewatering well as per the designer’s recommendation. Held the position of supervisor for all the activities from Roof slab, concourse slab and base slab, for the underground metro station. Preparation of Bar Bending Schedules (BBS) according to the approved drawing. Maintaining good relation with the Clients, Consultants and Colleagues. Monitoring the sub-contractor works and give the suggestion to Sub-Contractors and labors. Maintenance of Daily Programme report, R.F.I checklist and Pour Cards. Supervision of diaphragm wall grabbing, cage checking, cage lowering and concreting. Supervisor of pile boring, cage lowering and concreting.LARSEN & TOUBRO LTD -
Charge HandLarsen & Toubro Jul 2007 - May 2010Delhi, IndiaINDHIRA GANDI INTERNATIONAL AIRPORT (NEW DELHI) Execution of all activities of site according to given method. Strom water drain excavation with proper slope, concrete pipe laying & concreting with safely. Preparation of grated drain with wall in between PQC. Prepare the ground level with using auto level surveying for PQC. Regular Checking of the Shuttering form Work according to the drawing. Responsible for Erection and Fixing of the OTE duct. Maintenance of Daily Programme report.
Umarul Farook Education Details
-
Civil Engineering -
Smpt82
Frequently Asked Questions about Umarul Farook
What company does Umarul Farook work for?
Umarul Farook works for J Kumar Infrastructure Limited.
What is Umarul Farook's role at the current company?
Umarul Farook's current role is Deputy Manager at J Kumar Infraprojects Ltd.
What schools did Umarul Farook attend?
Umarul Farook attended Anna University, Smpt.
Not the Umarul Farook you were looking for?
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial