Deputy Manager
CurrentMUMBAI METRO LINE -3 UGC -05 (UNDER GROUND METRO RAIL PROJECT)Monitoring and controlling the overall project with respect to cost, Resource deployment, Time over-Runs and quality compliance; Ensuring the satisfactory execution & completion of project. Supervising the construction process from the conceptual development stage through final construction, ensuring that the projects get done on time completion with given timeline. Overseeing the entire project, construction scheduling & coordinate with all design /Team. Leading a team of professionals; ensuring suitable deployment and availability of manpower. Evaluating & Determining construction delivery system and most cost-effective plan and schedule for completing project. Anchoring on-site construction activity to ensure completion of project within the time & cost parameter and effective resources utilization to maximum the output. Strictly follow and implement stringent system and quality plans/ manual to ensure high quality standard during all the stage of project. Liaising with consultants, contractors, sub-contractors & External agencies for clearance. As well as, Overall responsible for formwork management, scheme implementation, safety, quality andProductivity of formwork manpower and materials at site. Implement methodology and execute the construction of UG structures like piles, slabs, walls, waterproofing works, OTE ducts, staircase, Natm and Tunnel eye cut and cover method. Monitor and in charge for construction of slab, wall, pile, waterproofing work for both horizontal and vertical structures. Regular coordination with designer and consultant for drawing clarification to avoid delay in execution. Regular monitoring and arranging repair related works with appropriate material as per the direction of quality engineer. Ensure timely mobilization & effective utilization of reinforcements, formwork and scaffolding Materials.