Uğur Altinişik

Uğur Altinişik Email and Phone Number

Deputy Project Manager at İGA Havalimanı İşletmesi A.Ş. @ İGA İstanbul Yeni Havalimanı
arnavutköy, istanbul, turkey
Uğur Altinişik's Location
Istanbul, Istanbul, Türkiye, Turkey
About Uğur Altinişik

Uğur Altinişik is a Deputy Project Manager at İGA Havalimanı İşletmesi A.Ş. at İGA İstanbul Yeni Havalimanı. He possess expertise in project planning, power plants, project engineering, infrastructure, cost engineering and 15 more skills. He is proficient in İngilizce.

Uğur Altinişik's Current Company Details
İGA İstanbul Yeni Havalimanı

İga İstanbul Yeni Havalimanı

View
Deputy Project Manager at İGA Havalimanı İşletmesi A.Ş.
arnavutköy, istanbul, turkey
Website:
igairport.com
Employees:
2310
Uğur Altinişik Work Experience Details
  • İga İstanbul Yeni Havalimanı
    Build- Operate- Transfer Work Of Istanbul New Airport
    İga İstanbul Yeni Havalimanı Dec 2014 - Present
    İstanbul, Türkiye
    Deputy Project Manager The project which will be performed through Build-Operate-Transfer model in Istanbul will be the largest airport of the world when all units are put into operation; the project is also the highest valve contract in the history Turkey. In scope of the 3rd Istanbul Airport situated on a 76 million m2 area in total; 6 independent runways, 4 aprons and 16 taxiways, 4 domestic and international flights terminal buildings on a total indoor area of 1,5 Million m2, 3 Technical Blocks and Air Traffic Control Towers each at a height of 85 m and 8 Apron Observation Towers, and all other facilities required for DHM‹ service building and airport (fire station, construction machinery and automobile garage, security building, regulator building, power house, heat power station, water tank, customs building) will be constructed. 950 million m3 excavation and fill works will be performed on the 52,210,000 m2 construction site under the project. Istanbul 3rd Airport Project will have a capacity of 165 passenger boarding bridges, 500 airplanes and also an annual capacity of 150 million passengers when its construction is completed; and its period of operation will be 25 years. Kolin Construction is both a member of the investor group and among prime contractors of the project. The approximate amount of investment for the work is 10.247 billion Euros.
  • Kolin Construction Tourism Industry And Trading Co. Inc.
    Construction Of The Highway Between Km:2+500-10+000 Izmir Ring Road, Harmandali-Koyundere
    Kolin Construction Tourism Industry And Trading Co. Inc. Dec 2013 - Dec 2014
    İzmir, Türkiye
    Site EngineerThe project is totally 12,674 km long with secondary roads and branches. It starts at the northern part from Main Jet Base, following İzmir-Çanakkale State Road and İzmir-Aliağa railroad passes from western part of the Harmandalı and Ulukent settlements and crosses lots of creek, drying canal, watering canal, farming road and other roads that connecting near places each other from the Km : 10+000 and crosses railway from the Km: 9+555 and connected to İzmir-Menemen Çanakkale Road with Koyundere crossroad at the Km: 9+975.
  • Kolin Construction Tourism Industry And Trading Co. Inc.
    Akköy Ii Dam And Hepp Project
    Kolin Construction Tourism Industry And Trading Co. Inc. Aug 2012 - Dec 2013
    Giresun, Türkiye
    Site EngineerAladereçam, Gökçebel and Yaşmaklı Dams exist within the scope of Akköy II Project. Generation of power will be realized at Akköy II Hydroelectric Power Plant. Aladereçam Dam is located at 1,843 m crest and 1,792 m talweg elevation on Karaovacık Brook. Water from Aladereçam Dam is diverted to Gökçebel Dam reservoir through a transmission tunnel having 4,077 m length and 3.20 m inner diameter. Furthermore, a hydroelectric power plant with an installed capacity of 7 MW, utilizing 210 m head of water to be diverted to Gökçebel Dam reservoir from Aladereçam Dam, has been constructed in addition to the power generation at Akköy II HEPP, Gökçebel Dam is a rockfill dam at a height of 144 m, with a concrete face. Gökçebel Dam Reservoir is estimated as 94.78 million m3 water holding capacity. This dam is linked to Yaşmaklı Dam reservoir via a tunnel at a length of 6,650 m and an inner diameter of 4 m. Yaşmaklı Dam is a concrete gravity dam at a crest elevation of 1,630 m and a thalweg elevation of 1,530 m and a height of 100 m. The dam has a water-holding capacity of 17.68 million m3. Water is channeled from here to a surge tank via a tunnel at a length of 4,002 m and a diameter of 3.20 m, and from there to Akköy II Hydroelectric Power Plant, which is the adjacent structure to Akköy I Hydroelectric Power Plant via a penstock at a length of 3,424 m and a diameter of 2.70 m. The penstock is a unique structure with a drop head of 1,224 m. The power plant shall operate with two Pelton type turbines, and be completed with two vertical axis synchronous generators. 872.5 million kWh energy shall be generated in Akköy II.
  • Varyap
    European Side Justice Hall / Istanbul
    Varyap Jun 2009 - Sep 2009
    İstanbul, Türkiye
    InternThe European Side Justice Hall is the largest of its kind in Europe. The project is one of the most prestigious edifices and received valuable international recognition for its timely achievements.

Uğur Altinişik Skills

Project Planning Power Plants Project Engineering Infrastructure Cost Engineering Surveying Procurement Finite Element Analysis Progress Monitoring Quantity Surveying Energy Occupational Health Process Scheduler Structural Engineering Soil Hydropower Project Management Microsoft Office Soil Mechanics Drainage

Uğur Altinişik Education Details

Frequently Asked Questions about Uğur Altinişik

What company does Uğur Altinişik work for?

Uğur Altinişik works for İga İstanbul Yeni Havalimanı

What is Uğur Altinişik's role at the current company?

Uğur Altinişik's current role is Deputy Project Manager at İGA Havalimanı İşletmesi A.Ş..

What schools did Uğur Altinişik attend?

Uğur Altinişik attended İstanbul Teknik Üniversitesi, Istanbul University.

What are some of Uğur Altinişik's interests?

Uğur Altinişik has interest in Seyahat, Yamaç Paraşütü, Futbol.

What skills is Uğur Altinişik known for?

Uğur Altinişik has skills like Project Planning, Power Plants, Project Engineering, Infrastructure, Cost Engineering, Surveying, Procurement, Finite Element Analysis, Progress Monitoring, Quantity Surveying, Energy, Occupational Health.

Who are Uğur Altinişik's colleagues?

Uğur Altinişik's colleagues are Feyzullah Özatalay, Resul Efeoğlu, Oğuzhan Akdeniz, Ali Çelik, İrem Akın, Gurkan Kilimci, Lokesh Jakhar.

Not the Uğur Altinişik you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.