Project Engineer
Bogota
Configuration, Documentation, HMI Design, and Commissioning:• Configuration, documentation, design, and commissioning of high-performance graphics with ABB System 800xA (DCS) for the Coveñas plant of Ocensa.• Configuration, documentation, design, FAT-SAT testing, and commissioning of line 2 migration with ABB System 800xA (DCS) for the Cerromatoso plant of South 32 in a virtualized environment.• Design of high-performance graphics with ABB System 800xA (DCS) for the Cerromatoso plant of South 32.• Alarm rationalization workshop with SilAlarm for the Cerromatoso plant of South 32.• Training on high-performance graphics for the Cerromatoso plant of South 32.• Configuration, documentation, design, and commissioning of PLC migration from Quantum to PLC M580 with the Umac tool for the Terminal Néstor Pineda plant of Ecopetrol.• Training on Control Expert for the Terminal Néstor Pineda plant of Ecopetrol.• Documentation, configuration, and design of high-performance graphics with System Platform from Schneider Electric for the Coveñas plant of Ocensa.• Migration of TRIOS AC460 for the Coveñas plant of ODC in a virtualized system.• Maintenance of the ABB System 800xA (DCS) control system for the Coveñas plant of Ocensa.• Configuration and support of the ABB System 800xA (DCS) control system for the Vasconia plant of Cenit.Achievements:• Operational Optimization: Implemented over 50 high-performance graphics with ABB System 800xA, improving efficiency by 20%.• Technological Migration: Migrated 600 signals at Terminal Néstor Pineda, increasing system availability by 15%.• Technical Training: Trained over 50 technicians, increasing operational efficiency by 30%.• Alarm Rationalization: Reduced non-essential alarms by 40% at Cerromatoso, improving operational response.