Lead Engineer - Signalling Department
Cairo, Egypt
Review of the Preliminary Design, Detailed Design of CBTC U888 Solution.• Interface Management, Configuration Management, Change Management, Claim Management, Integration of the system towards the common objective of the program.• Review of the Material Management Plans, Specifications & Drawings, Factory Acceptance Test Procedures, Type tests, routine tests, Conducting the FATs, Dispatch Clearances, Material Inspection Reports Construction – Installation, Testing & Commissioning.• Review of the Installation Plan, Method Statements, Installation Completion Check list, verification of the Integration program for Testing and Commissioning,• Review of the Test case procedures, Supervision of the Test Cases of all systems, Ensuring the V&V Plan requirements, EMC test cases, Integrated test sheets, Signalling Wayside & On-board Static test & Dynamic test procedures, System acceptance test.• Perform PAT (Partial Acceptance Tests), SIT (System Integration Tests) & SAT (Site Acceptance Test) for Wayside & On-board Equipment’s.• Verification of the guaranteed particular during trial run, RAMS during the operations.• Review of the Safety system, ISA Report, ISA Analysis, verification process & witnessing sequence till ISAR Certificate and Report.