Velibor Vuckovic Email and Phone Number
Velibor Vuckovic work email
- Valid
- Valid
Velibor Vuckovic personal email
An ambitious & self-confident mechanical engineer with various skills in both mechanical & electronic engineering fields. My strongest point is that beside marine propulsion & offshore engineering, I have comprehensive knowledge & hands-on experience with industrial automation & complex engine control systems, including electronic data acquisition, telemetry and engine diagnostics.
Popravak Brodskih Motora
View- Website:
- turkey.pbm.hr
- Employees:
- 9
-
Chief Technology OfficerPopravak Brodskih MotoraRijeka, Hr -
Chief Technology OfficerPopravak Brodskih Motora Oct 2019 - PresentCroatia -
Senior Field EngineerPopravak Brodskih Motora Jul 2015 - Oct 2019Rijeka,Croatia -
Senior Pre-Commissioning Engineer - Tender SupportOcean Installer Oct 2014 - Mar 2015Stavanger Area, NorwayBeside working as a Project Lead on Draugen project, I was also preparing documentation and/or assisting in following tenders:1."Moho Nord – MPP installation" tender - Installation site:.Moho Nord field, offshore Congo - Water depth:750 – 1100 m - Client:”Total”2. "Bream Field Development" tender - Installation site:.Bream field, offshore Norway - Water depth:115m - Client:”Premier Oil Norge AS”3. "Heidelberg" tender- Installation site:.Heidelberg field, offshore GoM - Water depth:1600 m - Client: ”Andarko/BP”4. "Visund Marine – Umbilical Installation" tender - Installation site:.Visund field, offshore Norway - Water depth:335 m - Client: ”Statoil”5. "Cygnus Field Development" tender- Installation site:.Cygnus field, offshore UK - Water depth:23 m - Client: ”GDF Suez UK/Saipem Ltd UK” -
Project Lead Engineer-Tie-In & Pre-Commissioning - Draugen 2013 Infill Drilling ProjectOcean Installer Aug 2014 - Mar 2015Stavanger, NorwayInstallation site:..................................Offshore Norway (Draugen field)Water depth:......................................300mHost type:.........................................Gravity Based Structure ("Draugen GBS")Total project cost:..............................340 million USD ( 2014.)Client:.............................................."A/S Norske Shell"Pre-comm Subcontractor:.................."Halliburton"My responsibilities:Participating / leading Kick-off and weekly meetings with Client / Engineering.Ensuring that Subcontractors/Vendors documentation meets all project requirements.Ensuring that material, equipment and tools are correctly identified before commencement of the offshore mobilizations.Following up Pre-comm Subcontractor during execution of following installation activities:- Tie-in of 8” and 12” flexible flowlines (“Aker RTS III” ROV tie-in system)- De-oiling operations on 12” production line,- Draugen field shutdown activities,- System leak testing,- Umbilical / Flying leads tie-in & testing.Additionally, I was involved in preparation of documentation and/or follow-up on various other tasks:- 18” West valve intervention work (Draugen Oil Export Project),- Draugen D3 wellhead structure intervention work. -
Senior Pre-Commissioning Engineer - Martin Linge ProjectSubsea 7 Nov 2013 - Aug 2014Stavanger Area, NorwayInstallation site: .................................Offshore Norway (Martin Linge field, ex. Hild)Water depth: .....................................120 mHost type:..........................................Platform ("Martin Linge") & FSOTotal project cost:..............................4,2 billion USDClient:...............................................“Total” Pre-comm Subcontractor:...................“Halliburton”---Introduction---The Martin Linge SURF contract is the largest SURF EPIC contract ever awarded on the Norwegian Continental Shelf. Field is located on the NCS, in block 29/9, 29/6, 30/4 and 30/7.---Scope of Work---Scope can be divided in three main packages:Gas Export System : 70km x 24-inch gas export pipeline, tie-in systems, including all subsea structures - This part of the project is considered "fast track" (fixed window for the FUKA shut-down Q2-2014).Infield Systems: 3 x 3km long flexible infield flowlines and risers, FSO mooring system installation.Cable Systems: 160km long HV AC power cable, infield power cable, 55km Huldra fiber optic cable.My responsibilities:preparing pre-commissioning documentation for FUKA shutdown activities, in accordance with Subsea 7 “Subsea Isolation Standard”, Total “General Specifications” (GS) and Total OPERCOM philosophy. Documentation included detailed procedures, task plans, ROV tool & equipment manual, etc, covering offshore operations on existing (TP-1) and new subsea structures (WYE) during critical shutdown period on 32'' FUKA export pipeline.After completing documentation, I was involved in FUKA shutdown offshore campaign, where I supervised following operations:- Subsea Valves Barrier Integrity Testing,- MEG Flushing (TP-1 Subsea Structure),- Leak testing (complete system),- MEG Flushing (WYE Subsea Structure),- Final Valve Operations (RFSU/RFC operations) -
Pre-Commissioning Engineer - Varg Gas Export ProjectSubsea 7 Jul 2013 - Nov 2013Stavanger Area, NorwayTotal project cost:...........................60 million USDInstallation site:..............................Offshore Norway (Varg field)Water depth:..................................84mHost type:......................................FPSO ("Petrojarl Varg")Client:..,,,,,,,,,,,,,,,,,,,,,,,,,,...............“Talisman Energy Norge AS” (TENAS)Pre-comm Subcontractor:...............“Halliburton”---Introduction---The Varg Field is located approximately 200km from the Norwegian coast line, west of Stavanger and is located in Block 15/12 in a water depth of 84m.---Scope of Work---Subsea 7 has been awarded the contract to provide Engineering, Procurement, Construction, Installation and Pre-Commissioning/RFO of the riser and flowline system between ''Petrojarl Varg'' FPSO and Rev PLEM, and the tie-in jumper/spool piece for the pipeline at Rev PLEM including all seabed preparation, preparatory work and removal and/or relocation of existing equipment.* 6" Flexible Riser is to be installed in a Restrained Lazy Wave configuration between Petrojarl Varg FPSO and Gas Export PLET.* One Riser base between riser and flowline* 6 km of 6" non-insulated flexible flowline that will be trenched and buried* One Gas Export PLEM between flexible flowline and Rev field.* 10" Flexible jumper between new Gas Export PLEM at Rev field and existing 12" PLEM at REV field.My responsibilities:After completion of all subsea connections (FMC "ROVCON" type), I was involved in last two offshore pre-commissioning campaigns of the project, supervising following operations:- ESDV installation & backseal test on FPSO ''Petrojarl Varg'' Topside,- Leak testing of complete flexible flowline system (297 barg)- N2 dewatering operations (using L-gel pigs & MEG slugs train),- N2 purging & packing of the flowline system. -
Pipeline Precommissioning Engineer - Icoeep Phase 2 ProjectSaipem Aug 2012 - Jul 2013Offshore IraqTotal project cost: ...........................500 million USDInstallation site:...............................Offshore Iraq (Al Basrah Oil Terminal - ABOT) Water depth:...................................28mHost type:.......................................PlatformClient:............................................"South Oil Company" (SOC)PMC: ............................................"Foster Wheeler"Precomm Subcontractor:................."Baker Hughes"---My responsibilities:---Feasibility study of different pre-commissioning methodologies:- subsea flushing of 48” spools through check valves,- dewatering of Subsea Valve Manifold spools with gel pigs (propelled with N2 or crude oil)- dewatering of two 48” pipeline sections with gel pigs (with crude oil),- preparing MTO’s & PR's for temporary & permanent pre-commissioning items,- designing 48” Subsea Temporary Receiving Heads, - designing 48” scraper configuration,- various fluid flow / pressure drop calculations,- preparation of Technical Queries and Concession Requests together with Hook-up & Commissioning teams, Preparing pre-commissioning method statements & operation procedures including: - Kamos leak test procedure, - Gauging of both 48” pipeline sections,- Dewatering with crude oil of both 48” pipeline sections,- N2 purging of both PLEM's,Preparation of SOW for pre-commissioning Subcontractor(s) -
Pipeline Precommissioning Engineer - "Stefani-Aliveri" ProjectSaipem Feb 2012 - Aug 2012GreeceTotal project cost:.............................22,8 million EURInstallation site:................................Offshore Greece (Attiki / Evia)Water depth:....................................70m max,Client: ............................................“DESFA”Pre-comm Subcontractor:............... “Techfem”---My responsibilities:---- preparation of SOW's , method statements & precommissioning operation procedures,- sorting precommissioning Subcontractor evaluations & technical clarifications,- designing 20” WBC heads, Temporary Launching & Receiving Testing Heads, - designing 20” pig configuration for Flooding, Cleaning, Gauging & Dewatering operations.- witnessing precommissioning Subcontractor function tests of complete FCG, HT & Dewatering/Drying spreads (“Techfem” /”Sicco” & “Atlas Copco” ; Italy)- site visit of pig manufacturer facilities (“Propipe” ; UK)After sorting documentation in Saipem SMS office in Rijeka, I was in charge for precommissioning operations that included this:1. Air packing, FCG & HT operations: - supervising Subcontractor flooding & hydrotesting equipment mobilisation on both onshore sites,- preparing methodology for subsea installation of suction & discharge hoses and supervising both installations,- supervising & coordinating flooding, cleaning & gauging activities simultaneously with onshore works,- supervising 20” offshore pipeline section hydrotest,2. Caliper Survey, Dewatering & Drying operations: - supervising Subcontractor drying equipment mobilisation on both onshore sites,- supervising & coordinating precommissioning activities simultaneously with onshore works,- supervising Inteligent Caliper Survey run (“Rosen”),- supervising Dewatering operations,- supervising Drying operations (compressed air, until -20 deg Dew point) -
Pipeline Precommissioning Engineer - Castor Ugs ProjectSaipem Aug 2011 - Feb 2012SpainTotal project cost: ............................1,2 billion EURInstallation site: ...............................Offshore Spain (Amposta field)Water depth: ....................................70m maxHost type:........................................PlatformClient:.............................................“ESCAL UGS”PMC: .............................................“Noble Denton”Pre-comm Subcontractor:................ “Baker Hughes”---My responsibilities---:1. FCG & HT operations: (from 30” subsea launcher to onshore, 22km length)-supervising Baker Hughes mobilisation on board “Saipem” S355 DLB vessel, -preparing risk assessment for SIMOPS with 2 vessels inside 500m drilling rig zone,-subsea hose deployment supervising (with ROV assistance from “Far Samson “ vessel by Saipem UK & Sonsub crew, using VHF communication & video link),-taking care of all eventual outstanding issues with BH equipment & personnel during FCG & HT operations,-sorting all offshore precommissioning documentation with Subcontractor & Client,2. Dewatering, drying & N2 purging operations: (from onshore site to PUQ platform, 30 km length)- supervising 30” spools hydrotest,- supervising Baker Hughes equipment mobilisation on board PUQ platform, - organising & supervising dewatering discharge hose deployment in accordance with DSV “Bar Protector” crew,- supervising offshore part of dewatering operations,- internal inspection of permanent 30” valves (on PUQ) to check condition of ball valve & seat assembly after dewatering operations,- supervising drying operations (with compressed dried air to – 40°C dew point),- supervising nitrogen packing operations,(with liquid N2 from nitrogen pumps onshore),- sorting all offshore precommissioning documentation with Subcontractor & Client. -
Field Engineer/SpecialistPopravak Brodskih Motora Jan 2008 - Aug 2011Around The World3 years working as a field engineer specialist, for “PBM” d.o.o. («Woodward» independent distributor for SE part of Europe) (http://www.woodward.com).Job included frequent travel abroad for various offshore interventions, often working in difficult conditions with very tight deadlines, on almost any type/size of cargo ships, various industrial power plants and in oil & gas industry.Some of the clients:- “MSC - Mediterranean Shipping Company S.A” - “Tanker Pacific Management (Singapore) Pte Ltd” - "Thome Shipping Management Pte Ltd" - "V. Ships Management" - "Grimaldi Group" - “Atlantska Plovidba” d.d.- “Tankerska Plovidba” d.d.-“CMA – CGM”-“Hapag - Lloyd”- “INAGIP”Some details of performed work: - servicing, testing and troubleshooting «Woodward» mechanical & electronic engine controlling systems (industrial engines, gas & steam turbines, etc.), - engine remote control systems repairing, testing & troubleshooting (including Bosch-Rexroth, Mannesmann, Nabco/Wabco equipment), - servicing, testing and troubleshooting all kind of marine & industrial diesel engines, from largest low-speed 2-stroke prime movers (B&M, Sulzer, Wartsilla), medium speed propulsion engines (CAT, Mak, Stork, G.M.T., Pielstick ) to smallest auxilliary 4-stroke genset units (Daihatsu, Yanmar).
Velibor Vuckovic Skills
Velibor Vuckovic Education Details
-
Tehnicki Fakultet RijekaMechanical Engineering -
Elektrotehnicka Skola RijekaElectronic Technician
Frequently Asked Questions about Velibor Vuckovic
What company does Velibor Vuckovic work for?
Velibor Vuckovic works for Popravak Brodskih Motora
What is Velibor Vuckovic's role at the current company?
Velibor Vuckovic's current role is Chief Technology Officer.
What is Velibor Vuckovic's email address?
Velibor Vuckovic's email address is veliborv@net.hr
What schools did Velibor Vuckovic attend?
Velibor Vuckovic attended Tehnicki Fakultet Rijeka, Elektrotehnicka Skola Rijeka.
What are some of Velibor Vuckovic's interests?
Velibor Vuckovic has interest in Science And Technology.
What skills is Velibor Vuckovic known for?
Velibor Vuckovic has skills like Subsea Engineering, Pipelines, Engineering, Commissioning, Project Engineering, Oil And Gas Industry, Gas, Petroleum, Offshore Operations, Onshore, Pressure Vessels, Pre Commissioning.
Not the Velibor Vuckovic you were looking for?
-
Velibor Vuckovic
Belgrade -
Velibor Vuckovic
Croatia -
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial